IEEE P802.11 - TASK GROUP AX - GROUP INFORMATION UPDATE


Status of Project IEEE 802.11ax

High Efficiency (HE) Wireless LAN Task Group

Task Group Leadership

ChairOsama Aboul-Magd (Huawei Technologies)
1st Vice ChairRon Porat (Broadcom Ltd.)
2nd Vice ChairAlfred Asterjadhi (Qualcomm)
SecretaryYasuhiko Inoue (NTT)
Technical EditorRobert Stacey (Intel)

Background

In May 2013, the High Efficiency WLAN Study Group (HEW SG), a study group within IEEE 802.11 working group had started its activity to consider the improvement of spectrum efficiency to enhance the system throughput/area in high density scenarios of APs and/or STAs.

The study group was created based on the following straw poll and motion:

< Straw Poll >
Do you support starting a new study group called "high efficiency WLAN" to enhance 802.11 PHY and MAC in 2.4 and 5GHz with a focus on:
  • Improving spectrum efficiency and area throughput
  • Improving real world performance in indoor and outdoor deployments
    • in the presence of interfering sources, dense heterogeneous networks
    • in moderate to heavy user loaded APs
< Motion >
Request an approval by IEEE 802 LMSC to form an 802.11 Study Group to consider High-efficiency WLAN [as described in doc 11-13-0339r2] with the intent of creating a PAR and five criteria.

The HEW SG has successfully developed PAR and CSD documents and the project 802.11ax has started in May 2014.


Task Group Documents

The lastest version of the task group offical documents can be found here.

Previous Meetings

Links to the reports of previous meetings.

TGax 2020 November 2020 September 2020 July 2020
May 2020 March 2020 January 2020
2019 November 2019 September 2019 July 2019
May 2019 March 2019 January 2019
2018 November 2018 September 2018 July 2018
May 2018 March 2018 January 2018
2017 November 2017 September 2017 July 2017
May 2017 March 2017 January 2017
2016 November 2016 September 2016 July 2016
May 2016 March 2016 January 2016
2015 November 2015 September 2015 July 2015
May 2015 March 2015 January 2015
2014 November 2014 September 2014 July 2014
May 2014 --- ---
HEW SG 2014 --- March 2014 January 2014
2013 November 2013 September 2013 July 2013
May 2013 --- ---


November 2020 — Online Meeting

The IEEE 802 Plenary Session November 2020 was held online.
The P802.11ax D8.0 was in the process of the second IEEE-SA recirculation ballot from November 3rd to 12th, 2020.
TGax had two online meetings during the November 2020 plenary.

Main documents

The TGax meeting agenda, draft meeting minutes and closing report can be found here.

Accomplishments


[Back to Page Top]

October 2020 — Status Update


[Back to Page Top]

September 2020 — Online Meeting

The IEEE 802 Wireless Interim Session September 2020 was held online.
The P802.11ax D7.0 was in the process of the first IEEE-SA recirculation ballot
and the TGax had one online meeting during the week.

Main documents

The TGax meeting agenda and meeting minutes can be found here.

Accomplishments


Timeline


[Back to Page Top]

[Back to Page Top]

August 2020 — Status Update


[Back to Page Top]

July 2020 — Online Meeting

The IEEE 802 Plenary July 2020 Session was held online.
TGax had one meeting during the plenary session and another one after closing plenary.

Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

[Back to Page Top]

May 2020

The IEEE 802 Wireless Interim Session May 2020 was also cancelled due to COVID-19.
In the meantime, TGax continued to accelerate comment resolution process by two teleconferences every week.

[Back to Page Top]

March 2020

The IEEE 802 Plenary Session March 2020 was cancelled due to COVID-19.
In the meantime, TGax accelerated comment resolution process by having two teleconferences per week.

[Back to Page Top]

January 2020 — Irvine, CA

The TGax had only one meeting during the week since the initial IEEE-SA ballot on the IEEE 802.11ax D6.0 is going on.

Monday Tuesday Wednesday Thursday
AM1
AM2 TGax
(full session)
PM1
PM2
PM3


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Submissions
  3. Timeline

Goals for the March 2020 session


Teleconferences

Following TGax teleconferences were authorized during the January 2020 session.

Thursday January 30th, 2020 10:00 - 12:00 (ET)
Thursday February 13th & 27th , 2020 10:00 - 12:00 (ET)
Thursday February 6th, 20th & March 5th, 2020 20:00 - 22:00 (ET)


[Back to Page Top]

November 2019 — Waikoloa, HI

TGax had eight meeting slots during the week.
All sessions are full TG session.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full session)
TGax
(full session)
AM2 TGax
(full session)
TGax
(full session)
PM1 TGax
(full session)
PM2 TGax
(full session)
TGax
(full session)
TGax
(full session)
PM3


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions.

  4. Timeline
  5. No discussion on the timeline during the week.
    However, TGax timeline was updated as shown here.


Goals for the January 2020 session


Teleconferences

No TGax teleconferences were authorized during the November 2019 session. A teleconference may be scheduled with a 10-day notice.

[Back to Page Top]

September 2019 — Hanoi, Vietnam

TGax had nine meeting slots during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full session)
TGax
(full session)
AM2 TGax
(full session)
TGax
(MAC ad hoc)
TGax
(MU ad hoc)
PM1 TGax
(full session)
TGax
(full session)
PM2
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
PM3 TGax
(full session)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions.

  4. Timeline
  5. No discussion on the timeline during the week.
    However, TGax timeline was updated as shown here.


Goals for the November 2019 session


Teleconferences

No TGax teleconferences were authorized during the September 2019 session. However, one teleconference was announced by a 10-day notice.

Tuesday October 29th, 2019 13:00 - 15:00 (ET)


[Back to Page Top]

July 2019 — Vienna, Austria

TGax had ten meeting slots during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax ad hoc
(full session)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full session)
PM1 TGax
(full session)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax full
(PHY topic)
PM2 TGax ad hoc
(full session)
TGax full
(MAC topic)
TGax
(full session)
PM3
TGax
(MAC ad hoc)
TGax
(MU ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions.
  4. Timeline
  5. No discussion on the timeline during the week.
    Here is the current timeline.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot — Passes (86.5%)
    Janury 2019 Draft 4.0 and Recirculation Ballot — Passes (92.2%)
    May 2019 Mandatory Draft Review
    June 2019 Formation of Sponsor Ballot pool
    August 2019 Initial Sponsor Ballot
    January 2020 Final 802.11 Approval
    March 2020 Conditional EC Approval
    June 2020 RevCom submittal and publication


Goals for the September 2019 session


Teleconferences

Following TGax teleconferences were authorized during the July 2019 session.

Thursday August 1st, 2019 10:30 - 13:30 (ET)
Thursday August 8th, 2019 19:00 - 22:30 (ET)
Thursday August 15th, 2019 10:30 - 13:30 (ET)
Thursday August 22nd, 2019 19:00 - 22:30 (ET)
Thursday August 29th, 2019 10:30 - 13:30 (ET)
Thursday September 5th, 2019 19:00 - 22:30 (ET)


[Back to Page Top]

May 2019 — Atlanta, GA

TGax had eight meeting slots during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full session)
AM2 TGax
(full session)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full session)
TGax
(full session)
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM3


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions.
  4. Timeline
  5. A little adjustments to the current timeline are made.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot — Passes (86.5%)
    Janury 2019 Draft 4.0 and Recirculation Ballot — Passes (92.2%)
    May 2019 Mandatory Draft Review
    June 2019 Formation of Sponsor Ballot pool
    August 2019 Initial Sponsor Ballot
    January 2020 Final 802.11 Approval
    March 2020 Conditional EC Approval
    June 2020 RevCom submittal and publication


Goals for the July 2019 session


Teleconferences

Following TGax teleconferences were authorized during the March 2019 session.

Thursday May 23rd, 2019
(approved during the March 2019 meeting)
10:00 - 12:00 (ET)
Thursday May 30th, 2019 20:00 - 22:00 (ET)
Thursday June 13th, 2019 10:00 - 12:00 (ET)
Thursday June 20st, 2019 20:00 - 22:00 (ET)
Thursday June 27th, 2019 10:00 - 12:00 (ET)


[Back to Page Top]

March 2019 — Vancouver, BC, Canada

TGax had seven meeting slots during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full session)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1 TGax
(full session)
TGax
(full session)
TGax
(full session)
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM3


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions.
  4. Timeline
  5. No change to current timeline.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot — Passes (86.5%)
    Janury 2019 Draft 4.0 and Recirculation Ballot — Passes (92.2%)
    February 2019 Formation of Sponsor Ballot pool
    March 2019 Mandatory Draft Review
    July 2019 Initial Sponsor Ballot
    January 2020 Final 802.11 Approval
    March 2020 Conditional EC Approval
    June 2020 RevCom submittal and publication


Goals for the May 2019 session


Teleconferences

Following TGax teleconferences were authorized during the March 2019 session.

Thursday March 29th, 2019 10:00 - 12:00 (ET)
Thursday April 11th, 2019 10:00 - 12:00 (ET)
Thursday April 25th, 2019 10:00 - 12:00 (ET)
Thursday May 21st, 2019 10:00 - 12:00 (ET)


[Back to Page Top]

January 2019 — St. Louis, MO

TGax planed ten sessions during the week.
During WG mid-week plenary session, one more session was added on Thursday PM2.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full session)
TGax
(full session)
TGax
(full session)
AM2 TGax
(full session)
TGax
(full session)
PM1 TGax
(full session)
TGax
(full session)
TGax
(full session)
PM2 TGax
(full session)
TGax
(full session)
PM3 TGax
(full session)
TGax
(full session)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions during the TGax sessions.
  4. Timeline update
  5. Current timeline has been updated as follow.

    Current Timeline (Updated)
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot — Passes (86.5%)
    Janury 2019 Draft 4.0 and Recirculation Ballot
    February 2019 Formation of Sponsor Ballot pool
    March 2019 Mandatory Draft Review
    July 2019 Initial Sponsor Ballot
    January 2020 Final 802.11 Approval
    March 2020 Conditional EC Approval
    June 2020 RevCom submittal and publication


Goals for the March 2019 session


Teleconferences

TGax teleconferences will be scheduled with a 10-day notice.

[Back to Page Top]

November 2018 — Bangkok, Thailand

TGax planed ten sessions during the week.
During WG mid-week plenary session, one more session was added in Thursday PM2.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full ad hoc session)
TGax
(MAC ad hoc)
TGax
(full session)
TGax
(full session)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full session)
PM1
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM2 TGax
(full)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full session)
PM3
TGax
(MAC ad hoc)

Submissions for MU and SR ad hoc groups were considered in the MAC ad hoc group.


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions during the TGax sessions.
  4. Timeline update
  5. Current timeline needs to be updated. Details will be discussed in the January 2019 session.

    Current Timeline (to be updated)
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot — Passes (86.5%)
    November 2018 Mandatory Draft Review
    November 2018 Draft 4.0 and Recirculation Ballot
    February 2019 Formation of Sponsor Ballot pool
    March 2019 Draft 5.0 and Recirculation (unchanged)
    July 2019 Initial Sponsor Ballot
    January 2020 RevCom submittal and publication


Goals for the January 2019 session


Teleconferences

Following TGax teleconferences were authorized during the September 2018 session.

Thursday November 29th, 2018 18:00 - 20:00 (ET)
Thursday December 06th, 2018 10:00 - 12:00 (ET)
Thursday December 13th, 2018 18:00 - 20:00 (ET)
Thursday December 20th, 2018 10:00 - 12:00 (ET)
Thursday January 03rd, 2019 10:00 - 12:00 (ET)

Additional TGax teleconference may be scheduled with 10-day notice if needed.


[Back to Page Top]

September 2018 — Waikoloa, HI

TGax had ten sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax (full)
6 GHz discussion
TGax (full)
6 GHz discussion
TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1 TGax
(full)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax (full)
COEX discussion with 802.19
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM3
TGax
(SR ad hoc)
TGax
(MAC ad hoc)
TGax (full)
(6 GHz discussions)

Submissions for MU ad hoc were considered in the MAC ad hoc.


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions during the TGax sessions.
  4. Timeline update
  5. There are small adjustments to the TGax Timeline.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot — Passes (86.5%)
    November 2018 Mandatory Draft Review
    November 2018 Draft 4.0 and Recirculation Ballot
    February 2019 Formation of Sponsor Ballot pool
    March 2019 Draft 5.0 and Recirculation (unchanged)
    July 2019 Initial Sponsor Ballot
    January 2020 RevCom submittal and publication


Goals for the November 2018 session


Teleconferences

Following TGax teleconferences were authorized during the September 2018 session.

Thursday September 20th, 2018 10:00 - 12:00 (ET)
Thursday September 27th, 2018 20:00 - 22:00 (ET)
Thursday October 04th, 2018 10:00 - 12:00 (ET)
Thursday October 11th, 2018 20:00 - 22:00 (ET)
Thursday October 18th, 2018 10:00 - 12:00 (ET)
Thursday November 01st, 2018 10:00 - 12:00 (ET)

Additional TGax teleconference may be scheduled with 10-day notice if needed.


[Back to Page Top]

July 2018 — San Diego, CA

TGax had eight sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax
(ad hoc)
TGax
(with 802.19)
TGax
(full)
AM2 TGax
(full)
PM1 TGax
(full)
TGax
(full)
PM2 TGax
(full)
TGax
(full)
PM3


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

802.11 WG Letter Ballot #233


Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions during the TGax sessions.
  4. Timeline update
  5. TG reviewed the timeline - No change.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot — Passes (86.5%)
    July 2018 Mandatory Draft Review
    November 2018 Draft 4.0 and Recirculation Ballot
    February 2019 Formation of Sponsor Ballot pool
    September 2019 Initial Sponsor Ballot
    December 2019 RevCom submittal


Goals for the September 2018 session


Teleconferences

Following TGax teleconferences were authorized during the July 2018 plenary.

Thursday July 26th, 2018 10:00 - 12:00 (ET)
Thursday August 02nd, 2018 20:00 - 22:00 (ET)
Thursday August 09th, 2018 10:00 - 12:00 (ET)
Thursday August 16th, 2018 20:00 - 22:00 (ET)
Thursday August 23rd, 2018 10:00 - 12:00 (ET)
Thursday August 30th, 2018 20:00 - 22:00 (ET)
Thursday September 20rd, 2018 10:00 - 12:00 (ET)

Additional TGax teleconference may be scheduled with 10-day notice if needed.


[Back to Page Top]

May 2018 — Warsaw, Poland

TGax had nine sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1 TGax
(full)
TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(SR ad hoc)
TGax
(MAC ad hoc)
PM3
TGax
(SR ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC adx hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions during the TGax ad hoc meeting and in the TGax sessions.
  4. Timeline update
  5. TG reviewed the timeline - No change.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot
    July 2018 Mandatory Draft Review
    February 2019 Formation of Sponsor Ballot pool
    May 2019 Initial Sponsor Ballot
    December 2019 RevCom submittal


Goals for the July 2018 session


Teleconferences

Following TGax teleconferences has already approved during the March 2018 plenary.

Thursday May 17th, 2018 10:00 - 12:00 (ET)

Additional TGax teleconference may be scheduled with 10-day notice if needed.


[Back to Page Top]

March 2018 — Rosemont, IL

TGax had ten sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full, ad hoc)
TGax
(MAC & MU ad hoc)
TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC & MU ad hoc)
TGax
(full)
PM1 TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MAC & MU ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC & MU ad hoc)
TGax
(full)
PM3
TGax
(SR ad hoc)
TGax
(MAC & MU ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions during the TGax ad hoc meeting and in the TGax sessions.
  4. Timeline update
  5. TG reviewed the timeline - No change.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot
    July 2018 Mandatory Draft Review
    February 2019 Formation of Sponsor Ballot pool
    May 2019 Initial Sponsor Ballot
    December 2019 RevCom submittal


Goals for the May 2018 session


Teleconferences

TGax teleconferences are scheduled after the March 2018 session as follows:

Thursday March 22nd, April 5th, April 19th, 2018 10:00 - 12:00 (ET)
Thursday March 29th, April 12th, April 26th, 2018 20:00 - 22:00 (ET)
Thursday May 17th, 2018 10:00 - 12:00 (ET)

TGax PHY calls are scheduled instead of face-to-face ad hoc meeting:

Wednesday May 2nd, 2018 20:00 - 22:00 (ET)
Thursday May 3rd, 2018 20:00 - 22:00 (ET)
Friday May 4th, 2018 10:00 - 12:00 (ET)


[Back to Page Top]

January 2018 — Orlando, FL

TGax had nine sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC & MU ad hoc)
TGax
(full)
PM1 TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MAC & MU ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC & MU ad hoc)
TGax
(full)
PM3
TGax
(PHY ad hoc)
TGax
(MAC & MU ad hoc)
TGax
(SR ad hoc)
TGax
(MAC & MU ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Submissions
  3. TGax received following submissions during the TGax ad hoc meeting and in the TGax sessions.
  4. Timeline update
  5. TG reviewed the timeline - No change.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Draft 3.0 and WG Letter Ballot
    July 2018 Mandatory Draft Review
    February 2019 Formation of Sponsor Ballot pool
    May 2019 Initial Sponsor Ballot
    December 2019 RevCom submittal


Goals for the March 2018 session


Teleconferences

TGax teleconferences are scheduled after the January 2018 session as follows:

Thursday January 25th, 2018 20:00 - 22:00 (ET)
Thursday February 1st, 2018 10:00 - 12:00 (ET)
Thursday February 8th, 2018 20:00 - 22:00 (ET)
Thursday February 22nd, 2018 20:00 - 22:00 (ET)


[Back to Page Top]

November 2017 — Orlando, FL

TGax had four sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
AM2 TGax
(full)
TGax
(full)
PM1 TGax
(full)
PM2 TGax
(cancelled)
TGax
(cancelled)
TGax
(cancelled)
PM3


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

WG Letter Ballot #230 on IEEE 802.11ax draft 2.0


Achievements

  1. Work Completed
  2. Technical Presentations
  3. TGax received 12 submissions. All of the submissions are presented during the week.
  4. Timeline update
  5. TG reviewed the timeline. No change was made.

    Previous Timeline Modified (new) Timeline
    May 2014 Start of TG May 2014 Start of TG
    November 2014 First draft of the TG SFD approved November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    November 2016 Issue Draft 1.0 and start WG Letter Ballot — Failed (57.77%)
    LB 225: opened Dec. 1st, 2016 and closed Jan. 8th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    September 2017 Draft 2.0 and WG Letter Ballot — Failed (62.84%)
    LB 230: opened Oct. 5th, 2017 and closed Nov. 4th, 2017
    May 2018 Mandatory Draft Review May 2018 Draft 3.0 and WG Letter Ballot
    May 2018 Formation of Sponsor Ballot pool July 2018 Mandatory Draft Review
    November 2018 Initial Sponsor Ballot February 2019 Formation of Sponsor Ballot pool
    July 2019 RevCom submittal May 2019 Initial Sponsor Ballot
    December 2019 RevCom submittal


Goals for the January 2018 session


Teleconferences

TGax teleconferences are scheduled after the November 2017 session as follows:

Thursday November 30th, 2017 10:00 - 12:00 (ET)
Thursday December 7th, 2017 20:00 - 22:00 (ET)
Thursday December 14th, 2017 10:00 - 12:00 (ET)
Thursday December 21st, 2017 20:00 - 22:00 (ET)
Thursday January 4th, 2018 10:00 - 12:00 (ET)
Thursday January 25th, 2018 20:00 - 22:00 (ET)


[Back to Page Top]

September 2017 — Waikoloa, Big Island, HI

TGax had 11 sessions during the week.
Seven out of eleven sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
AM2 TGax
(full)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hocs)
TGax
(MAC ad hoc)
TGax
(full)
PM3
TGax
(PHY ad hocs)
TGax
(MAC ad hoc)
TGax
(MU ad hocs)
TGax
(MAC ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Presentations
  3. Following documents are discussed during the TGax teleconferences and the ad hoc meeting after July 2017 session. TGax received 62 submissions. All of the submissions are presented during the week.
  4. Timeline discussion
  5. TG reviewed the timeline. No change was made.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot
    September 2017 Draft 2.0 and WG Letter Ballot
    May 2018 Mandatory Draft Review
    May 2018 Formation of Sponsor Ballot pool
    November 2018 Initial Sponsor Ballot
    July 2019 RevCom submittal


Goals for the November 2017 session


Teleconferences

TGax teleconferences are scheduled after the September 2017 session as follows:

Approved in July Thursday September 28th, 2017 10:00 - 12:00 (ET)
Thursday September 21st, 2017 20:00 - 22:00 (ET)
New! Thursday November 2nd, 2017
10:00 - 12:00 (ET)


[Back to Page Top]

July 2017 — Berlin, Germany

TGax originally planned 10 sessions during the week.
One ad hoc session was added during the WG mid-week plenary.
Seven out of eleven sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
TGax
(MAC ad hoc)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1 TGax
(full)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(MU/SR ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hocs)
TGax
(MAC ad hoc)
TGax
(full)
PM3
TGax
(PHY ad hocs)
TGax
(MAC ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Presentations
  3. TGax received 48 submissions. All of the submissions are presented during the week.
  4. Timeline discussion
  5. TG discussed the timeline. No change was made.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot
    September 2017 Draft 2.0 and WG Letter Ballot
    May 2018 Mandatory Draft Review
    May 2018 Formation of Sponsor Ballot pool
    November 2018 Initial Sponsor Ballot
    July 2019 RevCom submittal


Goals for the September 2017 session


Teleconferences

TGax teleconferences are scheduled after the July 2017 session as follows:

Thursday July 20th, 2017 10:00 - 12:00 (ET)
Thursday July 27th, 2017 20:00 - 22:00 (ET)
Thursday August 3rd, 2017
August 17th, 2017
August 31st, 2017
10:00 - 12:00 (ET)
Thursday August 10th, 2017
August 24th, 2017
10:00 - 12:00 (ET)
Thursday September 21st, 2017 20:00 - 22:00 (ET)
Thursday September 28th, 2017 10:00 - 12:00 (ET)


[Back to Page Top]

May 2017 — Daejeon, South Korea

TGax had 11 sessions during the week.
Six out of eleven sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
AM2 TGax
(full)
TGax
(full)
PM1
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(SR ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hocs)
TGax
(MAC ad hoc)
TGax
(full)
PM3
TGax
(PHY ad hocs)
TGax
(MAC ad hoc)
TGax
(SR ad hocs)
TGax
(MAC ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Presentations
  3. TGax received 48 submissions. All of the submissions are presented during the week.
  4. Timeline discussion
  5. TG discussed and updated the timeline.

    Current Timeline Modified Timeline
    May 2014 Start of TG May 2014 Start of TG
    November 2014 First draft of the TG SFD approved November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot November 2016 Issue Draft 1.0 and start WG Letter Ballot
    September 2017 Draft 2.0 and WG Recirculation Ballot September 2017 Draft 2.0 and WG Letter Ballot
    May 2018 Mandatory Draft Review May 2018 Mandatory Draft Review
    May 2018 Formation of Sponsor Ballot pool May 2018 Formation of Sponsor Ballot pool
    November 2018 Initial Sponsor Ballot November 2018 Initial Sponsor Ballot
    July 2019 RevCom submittal July 2019 RevCom submittal


Goals for the July 2017 session


Teleconferences

TGax teleconferences are scheduled after the May 2017 session as follows:

Thursday May 18th, 2017 20:00 - 22:00 (ET)
Thursday May 25th, 2017 10:00 - 12:00 (ET)
Thursday June 1st, 2017
June 15th, 2017
20:00 - 22:00 (ET)
Thursday June 8th, 2017
June 22nd, 2017
10:00 - 12:00 (ET)
Monday
Tuesday
Wednesday
Thursday
June 26th, 2017
June 27th, 2017
June 28th, 2017
June 29th, 2017
20:00 - 22:00 (ET)
10:00 - 12:00 (ET)
20:00 - 22:00 (ET)
10:00 - 12:00 (ET)
Thursday July 20th, 2017 10:00 - 12:00 (ET)


[Back to Page Top]

March 2017 — Vancouver, BC, Canada

TGax had 10 sessions during the week.
Six out of ten sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1 TGax
(full)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(full)
PM2
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MU/PHY ad hocs)
TGax
(MAC ad hoc)
TGax
(full)
PM3 TGax
(MAC ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Presentations
  3. TGax received 48 submissions. All of the submissions are presented during the week.
  4. Timeline discussion
  5. TG discussed and updated the timeline.

    Current Timeline Modified Timeline
    May 2014 Start of TG May 2014 Start of TG
    November 2014 First draft of the TG SFD approved November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and Comment Collection started March 2016 Draft 0.1 was approved and Comment Collection started
    November 2016 Issue Draft 1.0 and start WG Letter Ballot November 2016 Issue Draft 1.0 and start WG Letter Ballot
    May 2017 Draft 2.0 and WG recirculation ballot September 2017 Draft 2.0 and WG recirculation ballot
    November 2017 Mandatory Draft Review May 2018 Mandatory Draft Review
    January 2018 Formstion of Sponsor Ballot pool May 2018 Formation of Sponsor Ballot pool
    March 2018 Initial Sponsor Ballot November 2018 Initial Sponsor Ballot
    December 2018 RevCom submittal July 2019 RevCom submittal


Goals for the May 2017 session


Teleconferences

TGax teleconferences are scheduled after the March 2017 session as follows:

Thursday March 23rd, 2017 20:00 - 22:00 (ET)
Thursday March 30th, 2017 10:00 - 12:00 (ET)
Thursday April 6th, 2017 20:00 - 22:00 (ET)
Thursday April 13th, 2017 10:00 - 12:00 (ET)
Thursday April 20th, 2017 20:00 - 22:00 (ET)
Thursday April 27th, 2017 10:00 - 12:00 (ET)
Thursday May 18th, 2017 20:00 - 22:00 (ET)
Thursday May 25th, 2017 10:00 - 12:00 (ET)


[Back to Page Top]

January 2017 — Atlanta, GA

TGax had 9 sessions during the week.
Three out of nine sessions were the ad hoc sessions of PHY and MAC ad hocs.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
AM2 TGax
(full)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1 TGax
(full)
TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
TGax
(full)
PM3


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Presentations
  3. TGax received 48 submissions. All of the submissions are presented during the week.

Goals for the March 2017 session


Teleconferences

TGax teleconferences are scheduled after the January 2017 session as follows:

Thursday February 2nd, 2017 10:00 - 12:00 (ET)
Thursday February 16th, 2017 20:00 - 22:00 (ET)
Thursday February 23rd, 2017 10:00 - 12:00 (ET)
Thursday March 2nd, 2017 20:00 - 22:00 (ET)
Thursday March 23rd, 2017 20:00 - 22:00 (ET)
Thursday March 30th, 2017 10:00 - 12:00 (ET)
Thursday April 6th, 2017 20:00 - 22:00 (ET)


[Back to Page Top]

November 2016 — San Antonio, TX

TGax had 12 sessions during the week.
Six out of twelve sessions were the ad hoc sessions.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full, ad hoc)
TGax
(full)
TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1 TGax
(full)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(MU ad hoc)
TGax
(SR ad hoc)
TGax
(MU ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM3
TGax
(MU ad hoc)
TGax
(SR ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Presentations
  3. TG received 90 submissions which are classified into PHY, MAC, MU, SR and TG submimssions.

Timeline

TG discussed the timeline. No changes since last update.

Current Timeline
May 2014 Start of TG
November 2014 First draft of the TG, SFD approved
January 2016 Proposed TG draft
March 2016 Draft 0.1 was approved and CC started
November 2016 Issue Draft 1.0 and start WG Letter Ballot
May 2017 Draft 2.0 and WG recirculation ballot
November 2017 Mandatory Draft Review
January 2018 Formation of Sponsor Ballot pool
March 2018 Initial Sponsor Ballot
December 2018 RevCom submittal


Goals for the January 2017 session


Teleconferences

Weekly teleconferences are scheduled after the November 2016 session.

Thursday December 1st, 2016 21:00 - 23:00 (ET)
Thursday December 8th, 2016 21:00 - 23:00 (ET)
Thursday December 15th, 2016 21:00 - 23:00 (ET)
Tuesday January 5th, 2017 11:00 - 13:00 (ET)
Thursday January 12th, 2017 20:00 - 22:00 (ET)


[Back to Page Top]

September 2016 — Warsaw, Poland

The TGax had 11 sessions during the week.
Six out of eleven sessions were assigned to the ad hoc group sessions.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
AM2 TGax
(full)
TGax
(MU ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM1
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(MU ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM3
TGax
(PHY ad hoc)
TGax
(SR ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Presentations
  3. TG received 90 submissions which are categorized into PHY, MAC, MU, SR and TG.
  4. Timeline discussion
  5. TG discussed and updated the timeline.

    Current Timeline Modified Timeline
    May 2014 Start of TG May 2014 Start of TG
    November 2014 First draft of the TG SFD approved November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and CC started March 2016 Draft 0.1 was approved and CC started
    September 2016 Issue Draft 1.0 and start WG Letter Ballot November 2016 Issue Draft 1.0 and start WG Letter Ballot
    March 2017 Draft 2.0 and WG recirculation ballot May 2017 Draft 2.0 and WG recirculation ballot
    November 2017 Mandatory Draft Review and formstion of Sponsor Ballot pool January 2018 Mandatory Draft Review and formation of Sponsor Ballot pool
    March 2018 Initial Sponsor Ballot March 2018 Initial Sponsor Ballot
    December 2018 RevCom submittal December 2018 RevCom submittal


Goals for the November 2016 session


Teleconferences

TGax teleconferences are scheduled after the September 2016 session as follows.

Thursday September 29th, 2016 10:00 - 12:00 (ET)
Thursday October 20th and 27th, 2016 10:00 - 12:00 (ET)
Thursday October 30th, 2016 20:00 - 22:00 (ET)
Thursday November 17th, 2016 10:00 - 12:00 (ET)


[Back to Page Top]

July 2016 — San Diego, CA

The TGax had 11 sessions during the week.
Six out of eleven sessions were assigned to the ad hoc group sessions.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full, ad hoc)
TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM1
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM2 TGax
(full)
TGax
(MU ad hoc)
TGax
(SR ad hoc)
TGax
(full)
PM3
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Presentations
  3. Here is the list of 90 submissions.
  4. Timeline
  5. TG discussed the timeline. No changes since last update.

    Current Timeline
    May 2014 Start of TG
    November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and CC started
    September 2016 Issue Draft 1.0 and start WG Letter Ballot
    March 2017 Draft 2.0 and WG recirculation ballot
    July 2017 MDR (Mandatory Draft Review)
    November 2017 Formstion of Sponsor Ballot pool
    March 2018 Initial Sponsor Ballot
    December 2018 RevCom submittal


Goals for the September 2016 session


Teleconferences

TGax teleconferences are scheduled after the July 2016 session.

Thursday August 4th, 2016 20:00 - 22:00 (ET)
(approved during the May 2016 session)
Thursday August 11th and 25th, 2016,
September 1st, 2016
10:00 - 12:00 (ET)
Thursday August 18th, 2016,
September 1st and 22nd, 2016
20:00 - 22:00 (ET)


[Back to Page Top]

May 2016 — Waikoloa, HI

The TGax had 10 sessions during the week.
Six out of ten sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1
AM2 TGax
(full)
TGax
(MU ad hoc)
TGax
(MAC+SR
ad hoc)
TGax
(full)
PM1
TGax
(PHY ad hoc)
TGax
(MAC+SR
ad hoc)
PM2
TGax
(PHY ad hoc)
TGax
(MAC+SR
ad hoc)
TGax
(PHY ad hoc)
TGax
(MU ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC+SR
ad hoc)
TGax
(full)
PM3
TGax
(PHY ad hoc)
TGax
(MU ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Work Completed
  2. Technical Presentations
  3. 70 technical submissions have been received and have been covered during the week.
    A list of the submissions is also available in the agenda document.
  4. Timeline
  5. TG discussed and revised the timeline as follows.

    Current Timeline Modified Timeline
    May 2014 Start of TG May 2014 Start of TG
    November 2014 First draft of the TG SFD approved November 2014 First draft of the TG SFD approved
    January 2016 Proposed TG draft January 2016 Proposed TG draft
    March 2016 Draft 0.1 was approved and CC started March 2016 Draft 0.1 was approved and CC started
    July 2016 Issue Draft 1.0 and start WG Letter Ballot September 2016 Issue Draft 1.0 and start WG Letter Ballot
    March 2017 Draft 2.0 and WG recirculation ballot March 2017 Draft 2.0 and WG recirculation ballot
    July 2017 MDR (Mandatory Draft Review)
    November 2017 Formation of Sponsor Ballot pool
    January 2018 Initial Sponsor Ballot March 2018 Initial Sponsor Ballot
    December 2018 RevCom submittal


Goals for the July 2016 session


Teleconferences

Weekly teleconferences are planned after the May 2016 session.

Thursday June 2nd, 2016 10:00 - 12:00 (ET)
Thursday June 16th, 2016 10:00 - 12:00 (ET)
Thursday June 23rd, 2016 20:00 - 22:00 (ET)
Thursday June 30th, 2016 10:00 - 12:00 (ET)
Thursday July 7th, 2016,
20:00 - 22:00 (ET)
Thursday July 14th, 2016 10:00 - 12:00 (ET)
Thursday August 4th, 2016 20:00 - 22:00 (ET)


[Back to Page Top]

March 2016 — Macau

The TGax had 9 sessions during the week.
Five out of nine sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM1 TGax
(full)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM2
TGax
(MAC ad hoc)
TGax
(SR ad hoc)
TGax
(MAC ad hoc)
TGax
(MU ad hoc)
TGax
(full)
PM3
TGax
(SR ad hoc)
TGax
(MU ad hoc)
TGax
(full)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Passed a number of motions affecting all aspects of the TG Specification Framework
  2. TG Documents
  3. Technical Presentations
  4. 48 technical submissions have been covered during the week.
    Here is the list of submissions which is also available in the agenda document.
  5. Draft Specification
  6. The TGax approved version 0.1 of the draft specification.

    < TG Motion >
    Move to accept document 11-16/0024r1 as the TG draft specification D0.1, and start a 21 day comment collection period.
    • The submission is available at: https://mentor.ieee.org/802.11/dcn/16/11-16-0024-01-00ax-proposed-draft-specification.docx

    Moved by Robert Stacey, Second by Simone Merlin.
    Result: Y/N/A = 75/0/5, motion passes.


Goals for the May 2016 session


Teleconferences

TGax teleconferences are planned before the May 2016 session.

Thursday April 14th, 2016, 10:00 - 12:00 (ET)
Thursday April 21st, 2016 20:00 - 22:00 (ET)
Thursday April 28th, 2016, 10:00 - 12:00 (ET)
Thursday May 5th, 2016 20:00 - 22:00 (ET)


[Back to Page Top]

January 2016 — Atlanta, GA

The TGax had 10 sessions during the week.
Four out of ten sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
AM2 TGax
(full)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM1
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM2
TGax
(MAC ad hoc)
TGax
(SR ad hoc)
TGax
(full)
TGax
(full)
PM3
TGax
(MU ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Passed a number of motions affecting all aspects of the TG Specification Framework
  2. TG Documents
  3. Technical Presentations
  4. 48 technical submissions have been covered during the week.
    A list of the submissions is available in the agenda document.
  5. Draft Specification
  6. Plan for Progressing TG Draft

Goals for the March 2016 session


Teleconferences

Three teleconferences are planned before the March 2016 session.

Thursday February 4th, 2016, 10:00 - 12:00 (ET)
Thursday February 18th, 2016 20:00 - 22:00 (ET)
Thursday March 3rd, 2016, 10:00 - 12:00 (ET)


[Back to Page Top]

November 2015 — Dallas, TX

The TGax originally planned 10 sessions during the week.
One session was added during the WG mid-week plenary session.
Five out of eleven sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full, ad hoc)
TGax
(full)
TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM1 TGax
(full)
TGax
(MU ad hoc)
TGax
(SR ad hoc)
TGax
(PHY ad hoc)
TGax
(SR ad hoc)
TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MU ad hoc)
PM3
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Passed a number of motions affecting all aspects of the TG Specification Framework
  2. TG Documents
  3. Technical Presentations
  4. 70 technical submissions have been covered during the week.
    A list of the submissions is here which is also contained in the agenda document.

Goals for the January 2016 session


Teleconferences

One teleconference is planned before the January 2016 session.

Thursday December 10th, 2015 10:00 - 12:00 (ET)


[Back to Page Top]

September 2015 — Bangkok, Thailand

The TGax originally planned to have 10 sessions during the week.
However, two more sessions are added due to a large number of contributions.
Six out of twelve sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
TGax
(full)
AM2 TGax
(full)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(MU ad hoc)
TGax
(SR ad hoc)
TGax
(PHY ad hoc)
TGax
(SR ad hoc)
TGax
(full)
PM2 TGax
(full)
TGax
(full)
PM3
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(MU ad hoc)
TGax
(SR ad hoc)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Passed a number of motions affecting all aspects of the TG Specification Framework
  2. TG Documents
  3. Technical Presentations
  4. 70 technical submissions have been covered during the week.
    A list of the submissions is here which is also contained in the agenda document.

Goals for the November 2015 session


Teleconferences

Three teleconferences are scheduled after the November 2015 session.

Thursday October 15th, 2015 10:00 - 12:00 (ET)


[Back to Page Top]

July 2015 — Waikoloa, HI

TGax originally planned to have nine sessions during the week.
Two more sessions were added during the mid-week plenary session (marked red).
Four out of eleven sessions were ad hoc sessions.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full, ad hoc)
TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM1 TGax
(full)
TGax
(MU ad hoc)
TGax
(SR ad hoc)
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(full)
PM2
TGax
(PHY ad hoc)
TGax
(MU ad hoc)
TGax
(full)
PM3 TGax
(full)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Passed a number of PHY, MAC and MU motions affecting the TGax Specification Framework
  2. TG Documents
  3. Technical Presentations
  4. More than 70 technical submissions have been covered during the week.
    A list of the submissions is here which is also contained in the agenda document.

Goals for the September 2015 session


Teleconferences

Three teleconferences are planned before the September 2015 meeting.

Thursday August 20th, 2015 10:00 - 12:00 (ET)


[Back to Page Top]

May 2015 — Vancouver, BC, Canada

The TGax had 10 sessions during the week.
Six out of ten sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
AM2 TGax
(full)
TGax
(MU ad hoc)
TGax
(SR ad hoc)
PM1
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
TGax
(PHY ad hoc)
TGax
(SR ad hoc)
TGax
(PHY ad hoc)
TGax
(MU ad hoc)
TGax
(full)
PM2 TGax
(full)
PM3 TGax
(full)


Main documents

The meeting agenda and minutes of the TGax and its subgroups, and the TGax closing report can be found here.

Achievements

  1. Passed a number of PHY, MAC and MU motions affecting the TGax Specification Framework
  2. TG Documents
  3. Technical Presentations
  4. More than 50 technical submissions have been covered during the week.
    A list of the submissions is here which is also contained in the agenda document.

Goals for the July 2015 session


Teleconferences

Three teleconferences are planned before the July 2015 session.

Thursday June 18th, 2015 10:00 - 12:00 (ET)


[Back to Page Top]

March 2015 — Berlin, Germany

TGax originally planned nine sessions during the week.
However, one more session was added (Wednesday PM2).

Monday Tuesday Wednesday Thursday
AM1 TGax
(full, ad hoc)
TGax
(MU ad hoc)
TGax
(SR ad hoc)
TGax
(full)
AM2
TGax
(PHY ad hoc)
TGax
(MAC ad hoc)
PM1 TGax
(full)
TGax
(full)
TGax
(full)
TGax
(full)
PM2 TGax
(full)
PM3 TGax
(full)


Main documents

The meeting agenda, minutes, and closing report of the TGax can be found here.

Achievements

  1. Passed a number of PHY, MAC and MU motions affecting the TGax Specification Framework
  2. TG Documents
  3. Technical Presentations
  4. Following technical submissions have been covered during the week.

Goals for the May 2015 session


Teleconferences

Three teleconferences are planned before the May 2015 session.

Thursday April 9th, 2015 10:00 - 12:00 (ET)
Thursday April 30th, 2015 20:00 - 22:00 (ET)


[Back to Page Top]

January 2015 — Atlanta, GA

The TGax planned to have 9 sessions during the week.
One session (Thursday PM2) was cancelled upon completion of the business.

Monday Tuesday Wednesday Thursday
AM1 TGax
(full)
TGax
(full)
AM2 TGax
(full)
TGax
(full)
PM1 TGax
(full)
TGax
(full)
TGax
(full)
TGax
(Cancelled)
PM2
PM3 TGax
(full)


Main documents

The meeting agenda, minutes, and closing report of the TGax can be found here.

Achievements

  1. TG Structure
  2. Co-chairs for the ad hoc groups are elected.

    MAC PHY Multi-User (MU) Spatial Reuse (SR)
    Eric Wong
    (Apple)
    Bo Sun
    (ZTE)
    Sigurd Schelstraete
    (Quantenna)
    Laurent Cariou
    (Orange)
    Reza Hedayat
    (Newracom)
    Jianhan Liu
    (MediaTek)
    Kiseon Ryu
    (LG Electronics)
    Guido R. Hiertz
    (Ericsson)
    Brian Hart
    (Cisco)
    Yakun Sun
    (Marvell)
    Kaushik Josiam
    (Samsung)
    Jae Seung Lee
    (ETRI)

  3. TG Documents
  4. Technical Presentations
  5. Here is the list of the submissions that the TGax received during the week.

Goals for the March 2015 session


Teleconferences

Three teleconferences are planned before the March 2015 session.

Thursday February 26th, 2015 10:00 - 12:00 (ET)


[Back to Page Top]

November 2014 — San Antonio, TX

The TGax originally planned to have 9 sessions during the week.
FourHowever, one session (Tuesday PM3) was cancelled.

Monday Tuesday Wednesday Thursday
AM1 TGax
(ad hoc)
TGax
AM2 TGax
PM1 TGax TGax TGax
PM2 TGax TGax
PM3 TGax
(Cancelled)


Main documents

The meeting agenda, minutes, and the closing report of TGax can be found here.

Achievements

  1. Discussions on the TG Structure
  2. TG Documents — The group approved updated documents.
  3. Technical Presentations
  4. Here is the list of the 44 submissions that the TGax received.

Goals for the January 2015 session


Teleconferences

One teleconference is planned before the January 2015 session.

Thursday December 4th, 2014, 10:00 - 12:00 (ET)


[Back to Page Top]

September 2014 — Athens, Greece

The TGax had nine sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax
AM2 TGax TGax
PM1 TGax TGax TGax
PM2 TGax TGax
PM3 TGax


Main documents

The meeting agenda, minutes, and the closing report of TGax can be found here.

Achievements

  1. The group elected two vice chairs and discussed about the TG structure.
  2. Election of Vice Chairs took place during this meeting and two TG Vice Chairs are elected: The group started discussion on the Ad Hoc groups. Discussion will be continued in future meetings.
  3. The group approved minutes from the July 2014 San Diego meeting.
  4. TG Documents
  5. The group approved updated documents.
  6. Technical Presentations
  7. 54 submissions were submitted to the group and 52 of them were covered during the week.

Goals for the November 2014 session


Teleconferences

Three teleconferences are planned before the November 2014 session.

Thursday October 9th, 2014 10:00 - 12:00 (ET)


[Back to Page Top]

July 2014 — San Diego, CA

The TGax had 10 sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 TGax TGax TGax
AM2 TGax
PM1 TGax TGax
PM2 TGax TGax TGax
PM3 TGax


Main documents

The meeting agenda, minutes, and the closing report of TGax can be found here.

Achievements

  1. The group discussed on the TG structure.
  2. The group approved minutes from the May 2014 Waikoloa meeting and Teleconference on July 2nd, 2014.
  3. TG Documents
  4. The group discussed and approved following documents as current TG documents.
  5. Technical Presentations
  6. More than 40 submissions were covered during the week.
  7. Timeline
  8. No change was made to the tGax initial timeline that was approved during the May 2014 Waikoloa session.

    Current Timeline
    May 2014 Start of TG
    November 2014 Start to work on the specification framework
    July 2016 Draft 1.0 to be ready
    March 2017 Draft 2.0 to be ready
    1H 2019 Publication of IEEE 802.11ax amendment


Goals for the September 2014 session


Teleconferences

Three teleconferences are planned before the September 2014 session.

Thursday August 14th, 2014 10:00 - 12:00 (ET)
Chair had sent out call for submissions on the TGax reflector.


[Back to Page Top]

May 2014 — Waikoloa, HI

The TGax had 10 sessions during the week.
Four out of ten sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 TGax TGax
AM2 TGax TGax
PM1 Tgax
PM2 TGax TGax
PM3 TGax TGax


Main documents

The meeting agenda, minutes, and the closing report of TGax can be found here.

Achievements

  1. The group elected the chairperson and the secretary.
  2. Other officer psitions and TG structure will be discussed in the July 2014 session.
  3. The group approved minutes from the March 2014 Beijing meeting and Teleconference on April 17th, 2014.
  4. TG Documents
  5. Technical Presentations
  6. 40 submissions were covered during the week.
  7. Timeline
  8. The group approved initial timeline.

    Current Timeline
    May 2014 Start of TG
    November 2014 Start to work on the specification framework
    July 2016 Draft 1.0 to be ready
    March 2017 Draft 2.0 to be ready
    1H 2019 Publication of IEEE 802.11ax amendment


Goals for the July 2014 session


Teleconferences

Three teleconferences are planned before the July 2014 meeting.

Wednesday June 4th, 2014 10:00 - 12:00 (ET)
Wednesday June 18th, 2014 20:00 - 22:00 (ET)
Wednesday July 2nd, 2014 10:00 - 12:00 (ET)


[Back to Page Top]

High Efficiency WLAN (HEW) Study Group


March 2014 — Beijing, China

The HEW SG had 7 sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 HEW HEW
AM2 HEW
PM1 HEW
PM2 HEW HEW
PM3 HEW


Main documents

The meeting agenda, minutes, and the closing report of HEW SG can be found here.

Achievements

  1. The group approved minutes from the January 2014 Los Angeles meeting and teleconferences on February 6th, 2014 and February 13th, 2014.
  2. Addressed comments related to the PAR and CSD received from individuals and other IEEE 802 WGs.
    Resolutions of comments are contained in the following document:
  3. Updated the PAR and the CSD documents based on received comments:
  4. The group passed motions to approve revised PAR and CSD documents, and SG extension.
  5. Revised PAR (11-14/0165r1): Y/N/A = 94/0/1, Motion passes.
    Revised CSD (11-14/0169r1): Y/N/A = 97/0/1, Motion passes.
    SG extension: Y/N/A = 105/0/0, Motion passes.

    HEW SG has completed its work and the IEEE standard board approved 802.11ax project.

  6. The group received more than 30 submissions in the categories of simulation scenarios, evaluation methodologies, channel models, functional requirements, technologies and selection procedure.
  7. Following submissions have been presented and discussed during the week.

Goals for the May 2014 session


Teleconferences

Three teleconferences are planned before the May 2014 meeting.

Thursday April 174th, 2014 10:00 - 12:00 (ET)
Details to be announced.


[Back to Page Top]

January 2014 — Los Angeles, CA

The HEW SG had 9 sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 HEW
AM2 HEW HEW
PM1 HEW
PM2 HEW HEW HEW
PM3 HEW HEW


Main documents


Achievements

  1. The group approved minutes from the November 2013 Dallas meeting and teleconferences on December 4th, 2013, December 18th, 2013 and January 8th, 2014.
  2. The group resolved open issues related to the PAR and CSD.
  3. The group received 28 submissions that were categorized into (1) PAR and 5 Criteria related submissions, and (2) Best Effort submissions. Best Effort submissions basically related to simulation scenario and evaluation methodology.
  4. The group passed motions to approve PAR and CSD.
  5. The group passed motions to approve PAR and CSD

Goals for the March 2014 session


Teleconferences

The group agreed to have four teleconferences before the March 2014 session.

Thursday February 6th, 2014 20:00 - 22:00 (ET)
Thursday February 13th, 2014 10:00 - 12:00 (ET)
Thursday February 20th, 2014 10:00 - 12:00 (ET)
Thursday February 27th, 2014 20:00 - 22:00 (ET)


[Back to Page Top]

November 2013 — Dallas, TX

The HEW SG had 10 sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 HEW HEW
AM2 HEW
PM1 HEW HEW HEW
PM2 HEW HEW HEW HEW
PM3


Main documents


Achievements

  1. The group approved minutes from the September 2013 Nanjing meeting and teleconferences on October 3rd and October 30th, 2013.
  2. The group received more than 40 submissions that were categorized into three categories, i.e., (1) Channel Mode/Simulation Scenarios and Evaluation Methodologies, (2) MAC/PHY technologies and (3) PAR proposals.
  3. Following submissions were presented during the week.
  4. Discussed the WFA feedback on prioritization of the usage cases and approved a liaison letter back to WFA.
  5. Started the discussion on the PAR.
  6. The group passed a motion to extend the study group by 136/0/2.

Goals for the January 2014 session


Teleconferences

Three teleconferences are planned before the March 2016 meeting.

Wednesday December 4th, 2013 10:00 - 12:00 (ET)
Wednesday December 18th, 2013 20:00 - 22:00 (ET)
Wednesday January 8th, 2014 10:00 - 12:00 (ET)


[Back to Page Top]

September 2013 — Nanjing, China

The HEW SG had 9 sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 HEW
AM2 HEW
PM1 HEW HEW
PM2 HEW HEW HEW
PM3 HEW HEW


Main documents


Achievements

  1. The group approved minutes from the Geneva meeting and teleconference on August 28th, 2013.
  2. 50 submissions in the following categories were received and presented during the week.
  3. Straw Polls
  4. Several straw polls were conducted to sense the group consensus on topics related to simulation scenarios, evaluation methodologies and channel models.
  5. Timeline
  6. The group reviewed the timeline. No changes.

Goals for the November 2013 session


Teleconferences

Three teleconferences are planned before the November 2013 meeting.

Wednesday October 9th, 2013 10:00 - 12:00 (ET)
Wednesday October 17th, 2013 00:00 - 02:00 (ET)
Wednesday October 30th, 2013 10:00 - 12:00 (ET)


[Back to Page Top]

July 2013 — Geneva, Switzerland

The HEW SG had nine sessions during the week.

Monday Tuesday Wednesday Thursday
AM1 HEW HEW
AM2 HEW HEW
PM1 HEW
PM2 HEW HEW HEW HEW
PM3


Main Documents


Acheivements

  1. The group approved minutes from the face-to-face meeting in Waikoloa, HI and teleconferences held on June 5th and June 19th.
  2. Technical Presentations
  3. The group received over 35 submissions in areas of (1) Usage Models/Use Cases, (2) Functional Requirements, (3) Simulation Scenarios and Evaluation Methodology, (4) MAC/PHY techniques as listed below.
  4. HWE SG Initial Usage Models
  5. The group approved document 11-13-0657-06 as HEW SG initial draft of Usage Models and to send it to Wi-Fi Alliance asking for prioritization of the use cases and additional feedbacks.
  6. Liaison to the Wi-Fi Alliance
  7. The group also approved a liaison letter to the Wi-Fi Alliance contained in the document 11-13-0902-01.
  8. The group passed motion to extend the SG.
  9. Timeline
  10. The group discusses the timeline.

    TGax Initial Timeline
    May 2013 Start of the HEW SG
    July 2013 Presentations, SG extension
    September 2013 Presentations
    November 2013 Presentations, initial PAR and 5C, and SG extension
    January 2014 Presentations, final PAR and 5C, WG approval
    March 2014 Presentations, EC approval of PAR and 5C
    May - June, 2014 NesCom approval of PAR and 5C
    July 2014 Start of a new TG


Goals for September 2013 session

During the September 2013 meeting, the HEW SG continues discussions on issues related to:

Teleconferences

Two teleconferences are planned before the September 2013 session.

Wednesday August 7th, 2013 10:00 - 12:00 (ET)
Wednesday August 27th, 2013 20:00 - 22:00 (ET)


[Back to Page Top]

May 2013 — Waikoloa, HI

HEW SG had six sessions during the week. The TGax had 10 sessions during the week.
Four out of ten sessions were assigned to the ad hoc groups.

Monday Tuesday Wednesday Thursday
AM1 HEW
AM2 HEW HEW
PM1
PM2 HEW HEW HEW
PM3


Main Documents


Acheivements

  1. The group decided leadership structure to have one chairperson and one secretary.
  2. The group received 22 submissions as listed below.
  3. Liaison to the Wi-Fi Alliance
  4. Project planning

Goals for July 2013 session

During July 2013 session, the HEW SG will continue discussions on:

Teleconferences

Two teleconferences are planned before the July 2013 session.

Wednesday June 5th, 2013 10:00 - 12:00 (ET)
Wednesday June 19th, 2013 20:00 - 22:00 (ET)


[Back to Page Top]

Related documents

Documents referenced in the motion that led to the creation of the study group

Press release document


Useful links to other web sites

IEEE P802.11 WLANs RELATED

OTHER SITES


This page is maintained by Stephen McCann. Comments are welcomed.

Copyright (c), the Institute of Electrical and Electronics Engineers, Inc. (IEEE).
All rights reserved.

This website may contain names, logos, designs, titles, words, or phrases that may constitute trademarks, service marks, or tradenames of the IEEE or other entities which may be registered in certain jurisdictions.