Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: http://www.ieee802.org/15/pub/ieee802-15%20logo.jpg


IEEE 802.15 WPANTM

Task Group L2R (TG 10)

Layer 2 Routing

 



 

WPAN Home Page

 

IEEE Wireless Zone

IEEE 802.11 WLAN

IEEE 802.16 WMAN

IEEE 802.18 RR TAG

IEEE 802.19 Coex TAG

IEEE 802.20 MBWA

IEEE 802.21 MIHS

IEEE 802.22 WRAN

IEEE 802.23 ES

IEEE 802 LMSC

IEEE-SA

IEEE-SA PAT COM

IEEE-ISTO

IEEE


Overview

The end work product of the IEEE 802.15 Layer 2 Routing (L2R) Study Group is the generation of a PAR and 5c for a project on Layer 2 (Mesh Under Routing).

Current Status

Interest and active participation in the L2R activity continues, with an average of 20 attendees, representing more than 15 different entities on average at each of the last 6 sessions.

 

The first meeting of L2R as a Study Group occurred at the January 2013 Interim Session in Vancouver. During this session, the group drafted a Problem Statement along with a Preliminary Working Title, Scope and Purpose. At the March 2013 Plenary Session in Orlando, the L2R Study Group generated a draft PAR and 5c, based on the preliminary work done in the January Session. At the May 2013 Interim Session in Waikoloa, the L2R Study Group finalized and submitted the draft PAR and 5c to the 802.15 WG for approval. The PAR and 5C were approved by the 802.15 WG and have since been forwarded to the EC for review and approval.

Future Efforts

The next meeting of L2R as a Study Group will be at the July 2013 Plenary Session in Geneva. The SG will address comments and feedback from the 802 EC review and then present the finalized PAR and 5c for approval at the Closing 802 EC session on Friday afternoon.

How to participate

You can participate by attending and making contributions to the 802.15 SG L2R meetings during the upcoming July 2013 Plenary Session in Geneva.

Information

P802.15 documents are available at the Document Archive.

Sessions & Milestones

Status

Year

Month

Venue

Agenda

Closing Report

Minutes

IG

2012

July

San Diego

15-12-0337-02

15-12-0433-01

15-12-0403-01

Sept

Palm Springs

15-12-0448-03

15-12-0544-00

15-12-0545-00

Nov

San Antonio

15-12-0574-01

15-12-0673-00

15-12-0672-00

SG

2013

Jan

Vancouver

15-12-0688-00

15-13-0060-00

15-13-0061-00

March

Orlando

15-13-0111-00

15-13-0216-00

15-13-0213-00

May

Waikoloa

15-13-0249-00

15-13-0315-01

15-13-0314-00

July

Geneva

15-13-0348-00

 

 

Study Group Documents

L2R Draft PAR:  15-13-0231-03-0l2r-l2r-working-draft-par.docx

L2R Draft 5c:      15-13-0232-03-0l2r-l2r-working-draft-5c.docx

Who to contact with questions

·         Chairman: Clint Powell

 

The Institute of Electrical and Electronics Engineers, Inc.

 

Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: http://www.ieee802.org/15/pub/pixb.gif

If you would like to contact the IEEE 802.15 Webmaster, email to alfvin@ieee.org
© Copyright 2003, IEEE.   Terms & ConditionsPrivacy & Security

Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Description: Small IEEE Logo