* * *
Next Generation BASE-T
Study Group
* * *
Draft PAR (adopted by the study group 25-Sept-2012; amended 23-Jan-2013, amended 20-Mar-2013).
Draft 5 Criteria (adopted by the study group 23-Jan-2013)
Draft Objectives (adopted by the study group 25-Sept-2012; amended 23-Jan-2013, amended 19-Mar-2013)
Public area.
Private area
[Password-protected].
Search tool
.
Contacts.
Email reflector archive
.
Subscribing and unsubscribing to the Next Generation BASE-T e-mail reflector.
The next meeting of this Study Group will be announced on the
IEEE 802.3 interim session page
.
Return to IEEE 802.3 Home Page
Last Update: 25 March 2013