|
All files (zipped) |
5.2MB 4-Sep-12 |
|
|
|
Title |
Size/File Date |
Author(s) |
Affiliation |
|
meeting minutes (unconfirmed) |
177KB/4-Sep-12 |
Koussalya Balasubramanian |
Cisco |
|
Agenda and General Information |
171kB 18-July-12 |
Steve Carlson |
High Speed Design, Inc. |
|
EEE Considerations for RTPGE |
222kB |
Michael Bennett |
Lawrence Berkeley National Laboratory |
|
Answers to PoE and Channel Model ad hoc |
941kB |
Stefan Buntz, Thilo Streichert, |
Daimler |
|
Update on Required Cable Length |
382kB |
Stefan Buntz |
Daimler |
|
Update on EMC requirements |
105kB |
Stefan Buntz |
Daimler |
|
RTPGE Feasibility Consideration on EMC |
274kB |
Shaoan Dai, Dance Wu, Kok-Wui Cheong, David Tsui |
Marvell |
|
Link segments |
403kB |
Chris DiMinico |
MC Communications |
|
RTPGE PoE Ad Hoc Report |
191kB 17-July-12 |
Dave Dwelley |
LTC |
|
Tutorial for Lifetime Requirements and
Physical Testing of Automotive Electronic Control Units (ECUs) |
1.7MB 18-July-12 |
Thomas Hogenmüller, Helge Zinner |
Robert Bosch, Continental |
|
Tutorial for Wake Up Schemes and
Requirements for Automotive Communication Networks |
469kB 18-July-12 |
Thomas Hogenmüller, Helge Zinner |
Robert Bosch, Continental |
|
PHY Feasibility Study for One or Two Pairs
RTPGE |
82kB 18-July-12 |
Benson Huang, Joseph Chou |
Realtek |
|
Technical Feasibility of Gigabit transmission
on one or two pair cabling based on Category 6a technology |
2.3MB |
Richard Mei, Mabud Choudhury, George Zimmerman, |
Commscope, Commscope, CME Consulting |
|
Slightly Beyond RTPGE |
92kB |
Geoff Thompson |
GraCaSI S.A. |
|
Automotive PoE Requirements for RTPGE |
70kB |
Helge Zinner, Thomas Hogenmüller,Kirsten Matheus |
Continental, Robert Bosch, BMW |
|
REQUIREMENTS UPDATE FOR IEEE 802.3
RTPGE |
65kB |
Helge Zinner, Kirsten Matheus, Stefan Buntz, Thomas Hogenmüller |
Continental, BMW, Daimler, Robert Bosch |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|