Agenda and General Information 23-Jan 2020 (615k) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Unapproved Minutes 23-Jan-20 (192k) |
Jon Lewis | Dell EMC |
BWA Part II Related |
||
Chief
Editor's Opening Report 16-Jan 20 (118k) |
Tom Issenhuth | Issennhuth Consulting, Huawei |
802.3 BWA
Part II D1.0, Comment Resolution Agenda 16-Jan 20 (119k) |
Tom Issenhuth | Issenhuth Consulting, Huawei |
Comment #87: Draft: Proosed "Liaision to the World" 16-Jan 20 (93k) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Comment #110: Update to Figure 27 16-Jan 20 (201k) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Ethernet
BWA, Part II Schedule Update 21-Jan 2020 (144k) |
John D'Ambrosia Tom Issenhuth |
Futurewei, U.S. Subsidiary of Huawei Issenhuth Consulting, Huawei |
DRAFT
Tutorial: The
Findings of the IEEE 802.3 Industry Connections
new ethernet applications ad hoc: Ethernet
bandwidth assessment, Part II 16-Jan 20 (4M) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Beyond 400 GbE Consensus |
||
The Roadmap
to a Beyond 400GbE CFI
23-Jan 20 (762k) |
John D'Ambrosia | Futurewei, U.S. Subsidiary of Huawei |
Last Update: 23-Jan 2020