# | Tool | Version and Date | Description | File | |
Comment Submission | |||||
1 | Comment Submission Tool | March 2008 (20080305GOT) | This tool is a database that will allow users to eneter their comments in a systematic fashion and will allow editors to collate and manage comments easily. | Generic_Commenting_Tool.zip | |
Optical Link Modeling | |||||
1 | Channel Link Model for IEEE 802.3av | V2.3 13.04.2008 |
IEEE P802.3av Channel Link Model (approved by motion #3 at April 2008 meeting in Tokyo, Japan - see 3av_0804_minutes_unapproved.pdf). |
3av_0804_linkmodel_v2_3.xls | |
1a | Power budgets for PR10, PR20, PR30, PRX10, PRX20 and PRX30 (based on Channel Link Model V2.3) | 30.09.2008 |
Examples of power budgets for PR10, PR20, PR30, PRX10, PRX20 and PRX30 classes based on Channel Link Model V2.3 (informative), assuming a single downstream wavelength band (1574-1580 nm) - see comment #2158 in 3av_0809_comments_d2_0_accepted.pdf. |
3av_0809_linkmodel_v2_3_power_budgets.xls | |
1b | Power budgets for PR10, PR20, PR30, PRX10, PRX20 and PRX30 (based on Channel Link Model V2.3) | 13.04.2008 |
!!! Outdated as per September 2009 !!! Examples of power budgets for PR10, PR20, PR30, PRX10, PRX20 and PRX30 classes based on Channel Link Model V2.3 (informative). |
3av_0804_linkmodel_v2_3_power_budgets.xls | |
2 | Channel Link Model for IEEE 802.3av | V2.2 24.01.2008 |
IEEE P802.3av Channel Link Model (approved by motion #5 at January 2008 meeting in Portland, OR - see 3av_0801_minutes_approved.pdf). |
3av_0801_linkmodel_v2_2.xls | |
2a | Power budgets for PR10, PR20, PR30, PRX10, PRX20 and PRX30 (based on Channel Link Model V2.2) | 24.01.2008 |
Examples of power budgets for PR10, PR20, PR30, PRX10, PRX20 and PRX30 classes based on Channel Link Model V2.2 (informative). |
3av_0801_linkmodel_v2_2_power_budgets.xls | |
3 | Channel Link Model for IEEE 802.3av | V2.1 13.11.2007 |
IEEE P802.3av Channel Link Model (approved by motion #9 at November 2007 meeting in Atlanta, GA - see 3av_0711_minutes_approved.pdf). |
3av_0711_linkmodel_v2_1.xls | |
4 | Channel Link Model for IEEE 802.3av | V2.0 13.09.2007 |
IEEE P802.3av Channel Link Model (approved by motion #16 at September 2007 interim meeting in Seoul, South Korea - see 3av_0709_minutes_approved.pdf). |
3av_0709_linkmodel_v2_0.xls | |
5 | 10GEPON Non-Linear Impairments (v1.1) | D.1.1. 20.03.2007 |
MS Excel spreadsheet for calculations of SRS penalties, cross checked with Matlab model. The employed SRS model is valid for the digital 10G downstream channel located below analog video overlay (<= 1550 nm). (Unapproved) |
10GEPON-NonLinearEffects_v1.1.xls | |
6 | G.652 A/B and C/D fibre attenuation | D.0.1 20.03.2007 |
Matlab implementation of G.652 fibre attenuation curves, based on 3av_0703_anslow_1.pdf. Detailed model description in the comments in the file. (Unapproved) |
AttenuationG652.m | |
7 | SRS penalty calculator | D.0.1 20.03.2007 |
Matlab implementation of SRS penalty calculator, with approximated (undepleted pump) and full (depleted pump) model - see 3av_0701_ten_2.pdf for details. Detailed description of the usage and internal model in the comments inside of the file. (Unapproved) |
SRS_power_penalty.m | |
8 | SRS penalty calculator 1 | D.0.1 20.03.2007 |
Estimate the relation between the SRS penalty and the fiber attenuation, uses SRS_power_penalty.m (Unapproved) |
SRS_penalty_v1.m | |
9 | SRS penalty calculator 2 | D.0.1 20.03.2007 |
Estimate the SRS penalty difference between min and max examined attenuation @ 1550 nm, uses SRS_power_penalty.m (Unapproved) |
SRS_penalty_v2.m | |
Return to IEEE P802.3av 10GEPON Task Force Home Page
Last Update: September 30 2008
Questions or comments: send e-mail to glen.kramer@ieee.org