Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

P802.1x PAR revision - 30 Day Rule Notice




It is the intention of 802.1 to submit a revised PAR for P802.1x to the
Exec for approval at the Thursday Exec meeting during the March 2000 802
plenary.  This Email constitutes notice to the Exec under the 30 day rule.

The text of the revised PAR submission is attached, along with a covering
note to NesCom, the revised 5 criteria and a copy of the original PAR
submission. Final wordsmithing of this text to take account of any comments
received from other working groups, and final approval by 802.1, will take
place during the March plenary week.

Regards,
Tony.

PAR submission text follows.....
----------------------------

IEEE-SA Standards Board Project Authorization Request (PAR)  (1999-Rev 1)

1.  Sponsor Date of Request       [      ]

2.  Assigned Project Number     [P802.1X]

3.  PAR Approval DATE      [      ] {IEEE Staff to fill in box}
{Copyright release must be received with appropriate signatures
by postal mail or FAX (1-732-562-1571)}
[ ] PAR Signature Page on File {IEEE Staff to check Box}

4.  Project Title and Working Group/Sponsor for this Project
Document type : {Place an X in only one option below}
[X] Standard for {Document stressing the verb "SHALL"}
[ ] Recommended Practice for {Document stressing the verb "SHOULD"}
[ ] Guide for {Documents in which good practices are suggested} 

TITLE: [Port based Network Access Control]

Name of Working Group(WG) : [P802.1]

Name of Official Reporter (usually the WG Chair) who MUST be an SA member as
well as an IEEE/Affiliate Member: [William P. Lidinsky]
Title in WG: [WG chair]    IEEE/SA/Affiliate Member # [1069269SM]{Required}
Company: [HEPNRC at Fermilab]          Telephone: [630-840-8067]
Address: [M/S 368, PO Box 500, Kirk Rd. & Pine St.]
  FAX:       [630-840-8463]
City/State/Zip: [Batavia/IL/60510]   EMAIL:     [lidinsky@hep.net]

Name of WG Chair (if different than Reporter): [  ]
IEEE/Affiliate Memb # [  ]{Required}
Company: [  ]                           Telephone: [  ]
Address: [  ]                           FAX:       [  ]
City/State/Zip: [  ]                    EMAIL:     [  ]

Name of Sponsoring Society and Committee: [IEEE Comp. Soc. / LMSC]
Name of Sponsoring Committee Chair:   [Jim Carlo]
IEEE/SA/Affiliate Member # [  ] {Required}
Company: [  ]                           Telephone: [  ]
Address: [  ]                           FAX:       [  ]
City/State/Zip: [  ]                    EMAIL:     [  ]

5. Describe this Project by answering each of five questions below:

5a.   Update an existing PAR? {Yes/No} [YES]
If YES: Indicated PAR number/approval date [XXXX]
If YES: Attach cover letter indicating changes/rationale for changes.


If YES: Is this project in ballot now? [NO] {Yes/No}

5b.  Choose one from the following:
b1 -[XX] New Standard
b2 -[  ] Revision of existing standard {number and year} [  ]
b3 -[  ] Amendment (Supplement) to existing standard {number and year} [  ] 
b4 -[  ] Corrigenda to existing standard {number and year} [  ]

5c.  Choose one from the following:
c1 -[XX] Full Use (5-year life cycle)
c2 -[  ] Trial Use (2-year cycle)

5d.  Choose one from the following:
d1 -[XX] Individual Sponsor Ballot Process
d2 -[  ] Entity (not Individual) Sponsor Ballot Process

5e.  Fill in Target Completion Date to IEEE RevCom [2001]

6.  Scope of Proposed Project
{what is being done, including technical boundaries on the work}
[Specification of: (a) mechanisms to allow network access decisions, made
using existing standard higher layer authentication and authorization
protocols, to be enforced at individual ports of a networked system; (b)
encoding of those protocols over 802 LANs where no suitable encoding is yet
defined. The project will not define or require systems that are enforcing
network access decisions to: (c) process or interpret authentication
information; (d) modify user data frames to secure conversations; (e)
filter user data frames based on layer 2 or higher layer addressing or
protocol information. The access control mechanism will be usable on LAN
ports of all types of systems attached to a LAN, including bridges,
routers, servers and other end stations.]  {This should be brief (less than
5 lines recommended)}





7. Purpose of Proposed Project:
{why it is being done, including intended users, and benefits to users}
[There is no standard mechanism that allows a network administrator to
control access to and from a LAN segment based on the authenticated state
of a port user. Simple network connectivity affords anonymous access to
enterprise data and the global Internet. As 802 LANs are deployed in more
accessible areas, there is an increasing need to authenticate and authorize
basic network access. The proposed project will provide common
interoperable solutions using standards based authentication and
authorization infrastructures already supporting schemes such as dial up
access.] {This should be brief (less than 5 lines recommended)}




8. Intellectual Property {Answer each of the questions below} 
8a. Are you aware of any patents relevant to this project?
[No] {Yes, with detailed explanation below/ No}
[  ] {Explanation}

8b. Are you aware of any copyrights relevant to this project? 
[No] {Yes, with detailed explanation below/ No}
[  ] {Explanation}

8c. Are you aware of any trademarks relevant to this project? 
[No] {Yes, with explanation below/ No}
[  ] {Explanation}

8d. Are you aware of any registration of objects or numbers relevant to
this project?
[No] {Yes, with explanation below/ No}

9. Are you aware of other standards or projects with a similar scope? 
[No] {Yes, with explanation below/ No}
[  ] {Explanation}

10. International Harmonization
Is this standard planned for adoption by another international organization?
[YES] {Yes/No/?? if you don't know at this time}
If Yes: Which International Organization [ISO/IEC JTC1]
If Yes: Include coordination in question 13 below
If No:  Explanation [  ]

11. Is this project intended to focus on health, safety or environmental
issues?
[NO] {Yes/No/?? if you don't know at this time}
If Yes:  Explanation? [  ]

12. Proposed Coordination/Recommended Method of Coordination 

12a.  Mandatory Coordination
SCC 10 (IEEE Dictionary)    by DR
IEEE Staff Editorial Review   by DR
SCC 14 (Quantities, Units and Letter symbols) by DR

12b. Coordination requested by Sponsor and Method:
[ISO/IEC JTC1] by [DR/LI] {circulation of DRafts/LIaison memb/COmmon memb}
[IETF] by [DR] {circulation of DRafts/LIaison memb/COmmon memb}
[   ] by [  ] {circulation of DRafts/LIaison memb/COmmon memb}
[   ] by [  ] {circulation of DRafts/LIaison memb/COmmon memb}
{Choose DR or LI or CO for each coordination request}

12c.  Coordination Requested by Others:
[  ] {added by staff}

13.	Additional Explanation Notes: {Item Number and Explanation}
[see 3 attachments : Cover letter giving rationale for changes to PAR, 5
CRITERIA FOR P802.1X: PORT BASED NETWORK ACCESS CONTROL PAR, and the
original PAR submission for P802.1x]{If necessary, these can be continued
on additional pages}


*************************************************
COVER LETTER GIVING RATIONALE FOR CHANGES TO PAR:
*************************************************

To:	NesCom members
From:	Tony Jeffree, 802.1 Vice Chair
Date:	25 January 2000

The original PAR submission for P802.1x identified the project as a
supplement to IEEE Std 802.1D, MAC Bridges.  The intent at that time was
that the project would focus simply on the provision of access control
mechanisms associated with Bridge Ports in a LAN environment.  During the
initial stages of the development of this project, it has become clear that
the mechanisms are equally applicable to other devices in the LAN
environment, such as servers and routers. Developing this project in this
wider context will extend the usefulness of the resultant standard without
any significant change in the effort required to complete the work, or the
expected date of completion. As this generalization will require the
project to be re-cast as a stand-alone standard rather than a supplement to
the MAC Bridge standard, it is necessary for us to revise the PAR to take
the change of scope into account.


************************************************************
5 CRITERIA FOR 802.1X: PORT BASED NETWORK ACCESS CONTROL PAR 
************************************************************
1. Broad Market Potential 
+ Broad set(s) of applicability 
+ Multiple vendors and numerous users 
+ Balanced costs (LAN versus attached stations)
There is widespread use of mobile computing devices, many equipped with LAN
connectivity. This standard should facilitate the provision of direct LAN
access in semi-public places. Many organizations have started to do this
while others are investigating the opportunity, subject to satisfactory
resolution of the concerns highlighted in the Scope and Purpose sections of
this proposed project. RADIUS AAA servers (authentication, authorization,
and accounting) are already widely deployed in support of RAS (remote
access servers) supporting millions of users with solutions from many
vendors. This project allows network administrators to use this existing
AAA infrastructure to support LAN connectivity from multiple vendors,
retaining the same database and control information that has been built up
for mobile workers, and thus circumventing a major practical obstacle to
deploying new forms of network access. 
The proposed standard will not significantly alter the existing balance of
costs between a switched LAN infrastructure and attached end stations. The
full benefits of the proposed mechanism are not realizable with shared
media access. 

2. Compatibility with IEEE standards 
+ Conformance with bridging 802.1D 
+ Conformance with VLANs 802.1Q
The proposed standard will conform to the 802.1 Architecture, Management
and Interworking standards, in particular it will:
* Conform to IEEE Std. 802 Overview and Architecture and the anticipated
revision of that standard, now nearing completion.
* Be compatible with IEEE Std. 802.1D, but include a defined level of
compatibility with 802.1D-1998.
* Be compatible with 802.1Q, including any approved supplements to 802.1Q
that exist on completion.
* Provide a definition of managed objects compatible with system management
standards.

3. Distinct Identity 
+ Substantially different from other specs / solutions 
+ Unique solution for problem (not two alternatives / problem) 
+ Easy for document reader to select relevant spec
The proposed standard differs from the existing 802 standards by providing
the benefits described above. No other 802.1 standard or proposed standard
does so. No comparable standard or work exists elsewhere. 
The proposed standard defines additional mechanisms within LAN stations.

4. Technical Feasibility 
+ Demonstrated feasibility; reports ? working models 
+ Proven technology, reasonable testing 
+ Confidence in reliability
The infrastructure used to support this proposed standard is already in
widespread deployment, supporting millions of users.

5. Economic Feasibility 
+ Cost factors known, reliable data 
+ Reasonable cost for performance expected 
+ Total installation costs considered
Equipment costs are not expected to differ significantly from those for
systems that are being deployed today. Deployment costs should not be
significantly different either, and the solution can be deployed piecemeal.



************************************
ORIGINAL PAR SUBMISSION FOR P802.1x:
************************************

IEEE-SA Standards Board Project Authorization Request (PAR) (1999-Rev 1)
1. Sponsor Date of Request [xx/xx/99]
2. Assigned Project Number [P802.1?PAR revision4]
3. PAR Approval DATE [ ] {IEEE Staff to fill in box}
{Copyright release must be received with appropriate signatures
by postal mail or FAX (1-732-562-1571)}
[ ] PAR Signature Page Received {IEEE Staff to check Box}
4. Project Title and Working Group/Sponsor for this Project
Document type : {Place an X in only one option below}
[X] Standard for {Document stressing the verb "SHALL"}
[ ] Recommended Practice for {Document stressing the verb "SHOULD"}
[ ] Guide for {Documents in which good practices are suggested}
TITLE: [Supplement to ISO/IEC 15802-3 (802.1D): Information Technology -
Telecommunications and information exchange between systems - Local &
Metropolitan Area Networks - Common specifications - Part 3: Media
Access Control (MAC) Bridges - Port based Network Access Control]
Name of Working Group(WG) : [P802.1]
Name of Official Reporter (usually the WG Chair) who MUST be an SA member as
well as an IEEE/Affiliate Member: [William P. Lidinsky]
Title in WG: [WG Chair] IEEE/Affiliate Memb # [1069269SM]
Organization: [HEPNRC at Fermilab] Telephone: [630-840-8067]
Address: [M/S 368, PO Box 500, Kirk Rd. & Pine St.] FAX: [630-840-8463]
City/State/Zip: [Batavia/IL/60510] EMAIL: [lidinsky@hep.net]
Name of WG Chair (if different than Reporter): [ ]
IEEE/Affiliate Memb # [ ]{Required}
Company: [ ] Telephone: [ ]
Address: [ ] FAX: [ ]
City/State/Zip: [ ] EMAIL: [ ]
Name of Sponsoring Society and Committee: [IEEE Comp. Soc. / LMSC]
Name of Sponsoring Committee Chair: [Jim Carlo]
Organization: [Texas Instrument] Telephone: [214-340-8837]
Address: [9208 Heatherdale Dr.] FAX: [214-853-5274]
City/State/Zip: [Dallas/Texas/75243] EMAIL: [jcarlo@ti.com]
5. Describe this Project by answering each of four questions below:
5a. Update an existing PAR? {Yes/No} [NO]
If YES: Indicated PAR number/approval date [--]
If YES: Attach cover letter indicating changes/rationale for changes.
If YES: Is this project in ballot now? [--] {Yes/No}
5b. Choose one from the following:
b1 -[ ] New Standard
b2 -[ ] Revision of existing standard {number and year} [ ]
b3 -[XX] Amendment (Supplement) to existing standard {number and year}
[802.1D-1998]
b4 -[ ] Corrigenda to existing standard {number and year} [ ]
5c. Choose one from the following:
c1 -[XX] Full Use (5-year life cycle)
c2 -[ ] Trial Use (2-year cycle)
5d. Choose one from the following:
d1 -[XX] Individual Sponsor Ballot Process
d2 -[ ] Entity (not Individual) Sponsor Ballot Process
5e. Fill in Target Completion Date to IEEE RevCom [2001]