-95/05 N P Initial outline of PHY conformance test procedure (Larry Zuckerman, AMD) -95/09 N P Tentative Minutes DS subgroup meetings held San Jose, January 9-12, 1995 -95/14 N F New MAC State Machines (Michael Fischer, Digital Ocean) -95/15 N F Words for WEP (Michael Fischer, Digital Ocean) -95/16 N F Functions at the MAC/PHY interface (Michael Fischer, Digital Ocean) -95/17 N F Clarification of boundary conditions for the 802.11 MAC (Michael Fischer, Digital Ocean) -95/19 M F Venue for the May 1995 Session of meetings of IEEE P802.11 (Jon Rosdahl, Novell) 4 4 WFW2 FEB/Mar 13 -95/20 M F Inquiry re timing of PAR 2 WFW2 MAR 7 -95/21 M M Proposed changes to 802.11d1 to Harmonize it with approved 802.10 Standards (Leon Scaldeferri, NSA) 14 WFW2 MAR 6 6 -95/22 N F False Alarm Rate and CCA Times for FH PHY (Jim Renfro, Raytheon) will E'mail -95/23 M F Summary of 1994 Motions of the Frequency Hop Group (Jim McDonald, Motorola) 20 WFW2 MAR 34 -95/24 M F frequency Hop Motion from Nov '94 (Jim McDonald, Motorola) 2 WFW2 MAR 5 -95/25 M F Frequency Hop Topics from January '95 (Jim McDonald, Motorola) 4 WFW2 MAR 13 -95/26 N F Frequency Hop comment D (Jim McDonald, Motorola) WITHDRAWN -95/27 N F Frequency Hop comment E (Jim McDonald, Motorola) WITHDRAWN -95/28 M M Tentative Minutes MAC subgroup meetings held West Palm Beach, March 6-9, 1995 4 WFW2 MAR 13 -95/29 N W Tentative Minutes FH subgroup meetings held West Palm Beach, March 6-9, 1995 -95/30 N W Tentative Minutes PHY subgroup meetings held West Palm Beach, March 6-9, 1995 -95/31 N W Tentative Minutes DS subgroup meetings held West Palm Beach, March 6-9, 1995 -95/32 M W Tentative Minutes Full WG meetings held West Palm Beach, March 6-9, 1995 18 WFW2 MAR 47 -95/33 N W Tentative Minutes MAC/PHY meetings held West Palm Beach, March 6-9, 1995 -95/34 M I Tentative Minutes IR meetings held West Palm Beach, March 6-9, 1995 4 WFW2 MAR 10 -95/35 M W Document list for March meeting 6 WFW2 MAR 45 -95/36 M W Tentative agenda for the 29th session of meetings of IEEE P802.11 May 6 6 PPT3 MAR 19 -95/37 N W Voting proceedures (Larry Zuckerman, AMD) -95/38 M J Proposed Text Change for Section 8 (Ed Geiger, Apple) 10 WFW2 MAR 28 -95/39 M J Making Sense of MAC + PHY Timing Specification (Ed Geiger, Apple) 10 WFW2 MAR 44 -95/40 N W FCC's request for comments on Petition from Symbol Technologies (Larry Zuckerman, AMD) will E'mail -95/41 M W Product Labling (John Sonnenberg, Pulse Engineering) 4 WFW2 MAR 10 10 -95/42 M I Interim IR PHY minutes (Tom Baumgartner, Spectrix) 4 WFW2 MAR 15 -95/43 M M Interim MAC minutes (Caroline Heide, Spectrix) 2 WFW2 MAR 6 -95/44 M I Another Emiter Radiation Mask (Tom Baumgartner, Spectrix) 2 WFW2 MAR 7 -95/45 M W IR PHY response to D1 section 12 ballot comments (Barry Dobyns, Photonics) 20 WFW2 MAR 46 -95/46 M W Proposed changes to D1 section 12 based on ballot comments (Barry Dobyns, Photonics) 18 WFW2 MAR 151 -95/47 V Void - - -95/48 N Proposed changes to D1 section 9 based on ballot comments (Barry Dobyns, Photonics; Ed Geiger, Apple) DEFER TILL MAY -95/49 N Ad-Hoc Working Group Response to D1 section 9 comments (Ed Geiger, Apple & Barry Dobyns, Photonics) DEFER TILL MAY -95/50 M D CCITT CRC16 Calculator Simulation for DS-PHY (Al Petrick, John Fakatselis, Harris Semiconductor) 2 WFW2 MAR 21 -95/51 N W Draft Response to Van Diepenbeek letter of October '94 ( Don Loughby, IEEE P802 Chair) -95/52 M F Section 10 comments Resolutions (Jim McDonald) 7 WFW2 MAR 31 -95/53 M F Ballot Review Issues Log (Jim McDonald) 2 WFW2 MAR 4 -95/54 M W Proposed Revisions to Section 7.1 Based on D1 Comments( Bob O'Hara, AMD, Greg Ennis, Symbol; Chris Zegelin, Symbol; Phil Belanger, Xircom ) 14 WFW2 MAR 68 -95/55 N Updated text for section 3 ( Tom Siep, TI) -95/56 X Proposed text for Section 1 and 2, based on responses to Draft D1 letter ballot processed at March 1995 Meeting WFW6 -95/57 M W Proposed text for Section 3, based on responses to Draft D1 letter ballot processed at March 1995 Meeting 14 WFW2 MAR 85 -95/58 M W Proposed text for Section 4. to 4.1.2.2, based on responses to Draft D1 letter ballot processed at March 1995 Meeting 6 WFW2 MAR 34 -95/59 M W Proposed text for Section 5.1 and 5.2, based on responses to Draft D1 letter ballot processed at March 1995 Meeting 26 WFW2 MAR 322 -95/60 M W Proposed text for Section 5.4, based on responses to Draft D1 letter ballot processed at March 1995 Meeting 6 WFW2 MAR 130 -95/61 M W Proposed text for Section 5.5 and 5.6, based on responses to Draft D1 letter ballot processed at March 1995 Meeting 4 WFW2 MAR 21 -95/62 M W Section 1 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 10 WFW2 MAR 44 -95/63 M W Section 2 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 40 WFW2 MAR 156 -95/64 M W Section 3 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 18 WFW2 MAR 81 -95/65 M W Annotated Result of Ballot on Draft Standard D1, Section 4 38 WFW2 MAR 220 -95/66 M W Section 4 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 12 WFW2 MAR 32 -95/67 M W Section 5 thru 5.2.6.1 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 52 WFW2 MAR 322 -95/68 M W Section 5.2.6.2 thru 5.2.6.5 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 12 WFW2 MAR 49 -95/69 M W Section 5.2.6.6 thru 5.2.9 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 8 WFW2 MAR 100 -95/70 M W Section 5.5 thru 5.6 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 14 WFW2 MAR 48 -95/71 M W Section 7 thru 7.1.4 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 14 WFW2 MAR 66 -95/72 M W Section 11 Response to Draft D1 Letter Ballot proccessed at March 1995 meeting 12 WFW2 MAR 70 -95/73 M W Response to NESCOM on PAR extension 2 WFW2 MAR 4 venujul hijustf rsrvjul airljul M Venue for the Hawaii meeting Justification for Hawaii meeting Reservation for Hawaii meeting Airline discount 6 WFW2 14 16 17 5 Notes for Sub-Group Column:- D = Direct Sequence PHY Group M = MAC Group F = Frequency Hopping PHY Group S = High Speed Frequency Hopping PHY Group I = Infra-Red Group W = Complete IEEE 802.11 Working Group J = Joint MAC/PHY Interface Ad-Hoc Group IEEE P802.11Document list for March 1995 meeting doc: IEEE P802.11-95/35 Document Number Document Status and Sub-Group Title # of pages, on subscr # of pages in mlng Format of file, disk id File size on servers in kbyte File size in mailing in kbyte Notes for Document status column: F = Document Number is Available M = Document has been Mailed N = Document Not Received from Author V = Document Not Fit for Distribution X = Document Not Distributed in Mailing Yet IEEE 802.11 Meeting March 95 Relevant Document List Page 4 of 4 Vic Hayes, Chair