IEEE P802.11 - TASK GROUP V - MEETING UPDATE
Chair -
Editor - Emily Qi, Intel Corporation
Secretary – Dorothy Stanley,
To develop extensions to the 802.11 MAC/PHY to provide network management for STAs.
Achievements
Sponsor
recirculation balloting on P802.11v D15.0 had closed; however an additional
recirculation ballot is underway to
address Assigned Number issues discovered subsequently in industry
interoperability testing.
The ninth recirculation ballot on P802.11v D16.0 closes November 15th.
The schedule for completion/ratification of the TGv amendment is
changed to February 2011 (was December 2010).
The meeting
minutes , agenda
document and closing
report are available.
The presentation to the IEEE 802 Executive Committee requesting conditional
approval for proceeding to
Revcom is available here: https://mentor.ieee.org/802.11/dcn/10/11-10-0800-08-000v-tgv-ec-report-to-revcom.ppt
.
Comment resolution documents and related presentations containing comments for
which resolutions have been considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
There are conference calls scheduled
for Nov 16, 18, 23, 30, Dec 2, 7, 9, 14, 16 at 2pm Eastern (11am
Pacific), 2 hours.
November 2010 - January 2011 Goals
Achievements
The Task Group, as the designated Ballot Resolution Committee completed
comment resolution for comments on TGv D14.0 received in
the sixth recirculation Sponsor Ballot (SB7).
The schedule for completion/ratification of the TGv amendment is changed to
December 2010 (was September 2010)
Sixth recirculation Sponsor Ballot results were as follows: 140 yes, 3 no, 7
abstain, 97% approval.
1099 comments
were received: 1067 Technical, 2 Editorial, and 5 General.
The meeting minutes will be available at https://mentor.ieee.org/802.11/documents
, document 1154.
The agenda
document and closing
report are available.
Comment resolution documents and related presentations containing comments for
which resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
There are conference calls scheduled
for Oct 5, 7, 12, 14, 19, 21, 26, 28, Nov 2, 4, 2pm Eastern (11am
Pacific), 2 hours.
September-November 2010 Goals
Achievements
The Task Group, as the designated Ballot Resolution Committee completed
comment resolution for comments on TGv D12.0 received in
the fourth recirculation Sponsor Ballot (SB5).
The schedule for completion/ratification of the TGv amendment is unchanged (September
2010)
Fourth recirculation Sponsor Ballot results were as follows: 133 yes, 18 no, 7
abstain, 94% approval.
1074 comments
were received: 1067 Technical, 2 Editorial, and 5 General.
The meeting
minutes, agenda
document and closing
report are available.
Comment resolution documents and related presentations containing comments for
which resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
There are conference calls scheduled
for August 3, 5, 10, 12, 17, 19, 24, 26, 31, Sept 2, 7, 9 at 2pm Eastern (11am
Pacific) for 2 hours.
July-September 2010 Goals
Achievements
The Task Group, as the designated Ballot Resolution Committee completed
comment resolution for comments on TGv D10.0 received in
the second recirculation Sponsor Ballot (SB2).
The schedule for completion/ratification of the TGv amendment is unchanged
(September 2010)
Second recirculation Sponsor Ballot results were as follows: 122 yes, 18 no, 6
abstain, 87% approval.
1181 comments
were received: 1156 Technical, 20 Editorial, and 5 General.
The meeting minutes are available at https://mentor.ieee.org/802.11/dcn/10/11-10-0594-00-000v-may-2010-meeting-minutes.doc
.
The agenda document is available here: https://mentor.ieee.org/802.11/dcn/10/11-10-0523-03-000v-tgv-may-2010-agenda.ppt .
The closing report is available here: https://mentor.ieee.org/802.11/dcn/10/11-10-0661-00-000v-tgv-may-2010-closing-report.ppt
.
The second recirculation SB comments and approved resolutions are in https://mentor.ieee.org/802.11/dcn/10/11-10-0474-07-000v-sb-recirc-2-comments.xls
and subsequent revisions. The third recirculation sponsor ballot is expected to
open in approximately one week.
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
There are conference calls scheduled
for June 10, 15, 17, 29 and July 1at 2pm Eastern (11am Pacific) for 2 hours.
May - July 2010 Goals
Achievements
The Task Group, as the designated Ballot Resolution Committee completed
comment resolution for comments on TGv D9.0 received in
the initial recirculation Sponsor Ballot (SB1).
The schedule for completion/ratification of the TGv amendment is changed to
September (was June 2010).
Initial recirculation Sponsor Ballot results were as follows: 112 yes, 23 no, 6
abstain, 83.6% approval.
1045 comments were
received: 988 Technical, 34 Editorial, and 23 General.
The meeting minutes will be available at https://mentor.ieee.org/802.11/documents?is_group=000v&x_options=0
, document number 10-0417.
The agenda document is available here: https://mentor.ieee.org/802.11/dcn/10/11-10-0267-05-000v-tgv-march-2010-agenda.ppt
.
The closing report is available here: https://mentor.ieee.org/802.11/dcn/10/11-10-0416-00-000v-march-2010-closing-report.ppt
.
The initial recirculation SB comments and approved resolutions are in https://mentor.ieee.org/802.11/dcn/09/11-09-1122-03-000v-tgv-initial-sb-comments.xls
and subsequent revisions. The second recirculation sponsor ballot is expected
to open in approximately one week.
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
There are conference calls scheduled
for Thursday April 8, 15, 29, May 6, 13, and Tuesday April 20at 2pm Eastern (11am Pacific) for 2 hours.
March - May 2010 Goals
Achievements
The Task Group, as the designated Ballot Resolution Committee completed comment
resolution for comments on TGv D7.0 received in the initial Sponsor Ballot
(SB).
The schedule for completion of the TGv amendment is unchanged (July 2010).
Initial Sponsor Ballot results were as follows: 105 yes, 26 no, 6
abstain, 80.8% approval.
327 comments were received: 180 Technical, 123 Editorial, and 24
General.
The meeting minutes will be available at https://mentor.ieee.org/802.11/documents?is_group=000v&x_options=0
, document number 10-0125.
The agenda document is available here: https://mentor.ieee.org/802.11/dcn/10/11-10-0031-04-000v-tgv-january-2010-agenda.ppt .
The closing report is available here: https://mentor.ieee.org/802.11/dcn/10/11-10-0177-00-000v-tgv-closing-report.ppt
.
The Initial SB comments and approved resolutions are in https://mentor.ieee.org/802.11/dcn/09/11-09-1122-03-000v-tgv-initial-sb-comments.xls
and subsequent revisions.
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
There are conference calls scheduled
for February 16th, March 2nd and March 9th at
noon Eastern for 2 hours.
January - March 2010 Goals
Achievements
The Task Group began comment resolution for comments on TGv D7.0 received in
the initial Sponsor Ballot (SB).
The schedule for completion of the TGv amendment is unchanged (July 2010).
Initial Sponsor Ballot results were as follows: 105 yes, 26 no, 6
abstain, 80.8% approval.
327 comments were received: 180 Technical, 123 Editorial, and 24
General.
The meeting minutes will be available at https://mentor.ieee.org/802.11/documents?is_group=000v&x_options=0
, document number 1166.
The agenda document is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-1130-03-000v-tgv-november-2009-agenda.ppt
.
The closing report is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-1290-00-000v-tgv-closing-report.ppt
.
The Initial SB comments and approved resolutions are in https://mentor.ieee.org/802.11/dcn/09/11-09-1122-01-000v-tgv-initial-sb-comments.xls .
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
There are conference calls scheduled
for Dec 1, 8, 15 and Jan 12th, noon Eastern for 2 hours.
Nov 2009 - January 2010 Goals
Achievements
The Task Group completed comment resolution for comments on TGv D7.0
received in LB 155.
The schedule for completion of the TGv amendment is unchanged (July 2010).
LB155 results were as follows: 176 yes, 16 no, 38 abstain, 91% approval.
The meeting minutes will be available at https://mentor.ieee.org/802.11/documents?is_group=000v&x_options=0
, document number 1073.
The agenda document is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-0933-02-000v-tgv-september-2009-agenda.ppt
.
The closing report is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-1074-00-000v-tgv-closing-report.ppt
.
The approved minutes for the ad-hoc and teleconferences held in August 2009 are
available here:
https://mentor.ieee.org/802.11/dcn/09/11-09-0932-00-000v-tgv-aug-sept-telecon-minutes.doc .
The LB 155 comments and approved resolutions are in https://mentor.ieee.org/802.11/dcn/09/11-09-0929-04-000v-lb155-comments.xls
.
24 comments were received in LB155, 12 technical comments and 12 editorial
comments. A presentation showing that the required conditions for
proceeding to Sponsor Ballot have been met was also approved, see https://mentor.ieee.org/802.11/dcn/09/11-09-1057-00-000v-conditional-approval-ec-report.ppt
.
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
There are no scheduled conference calls
before upcoming the November meeting.
November 2009 Goals
To develop extensions to the 802.11 MAC/PHY to provide network management for STAs.
Achievements
The Task Group completed comment resolution for comments on TGv D6.0
received in LB 150.
The schedule for completion of the TGv amendment is unchanged (July 2010).
LB146 results were as follows: 172 yes, 20 no, 38 abstain, 89.58% approval.
The meeting minutes will be available at https://mentor.ieee.org/802.11/dcn/09/11-09-0842-00-000v-tgv-july-2009-minutes.doc
.
The agenda document is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-0675-06-000v-tgv-july-2009-agenda.ppt
.
The closing report is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-0900-00-000v-tgv-july-2009-closing-report.ppt .
The approved minutes for the ad-hoc and teleconferences held in June and July
are available here:
https://mentor.ieee.org/802.11/dcn/09/11-09-0677-05-000v-tgv-june-july-09-telecon-minutes.doc .
The LB 150 comments and proposed resolutions are in https://mentor.ieee.org/802.11/dcn/09/11-09-0676-06-000v-lb-150-comments.xls ,
and resolutions adopted at the July meeting. 140 comments were received in
LB150, 93 technical comments
and 47 editorial comments. A presentation requesting conditional approval from
the Executive Committee to go to
Sponsor Ballot was also approved, see https://mentor.ieee.org/802.11/dcn/09/11-09-0720-02-000v-tgv-sponsor-ballot-request-presentation.ppt
.
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
Teleconferences are scheduled for
Friday, August 14, and Tuesday September 1 and 15, Noon Eastern for 2 hours.
We are looking for a volunteer to serve as secretary. Please contact the chair
if you are interested.
September 2009 Goals
Achievements
The Task Group completed comment resolution for comments on TGv D5.0
received in LB 146.
The schedule for completion of the TGv amendment is unchanged (July 2010).
LB146 results were as follows: 155 yes, 32 no, 41 abstain, 83% approval.
The meeting minutes will be available at https://mentor.ieee.org/802.11/documents?is_group=000v&x_options=0
, document number 639.
The agenda document is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-0505-06-000v-may-2009-agenda.ppt
.
The closing report is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-0642-00-000v-may-2009-closing-report.ppt
.
The approved minutes for the ad-hoc and teleconferences held in April and May
are available here:
https://mentor.ieee.org/802.11/dcn/09/11-09-0447-07-000v-april-may-09-telecon-minutes.doc
.
The LB 146 comments and proposed resolutions are in https://mentor.ieee.org/802.11/dcn/09/11-09-0434-03-000v-lb146-comments.xls
,
and resolutions adopted at the May meeting. 321 comments were received in
LB146, 225 technical comments
and 96 editorial comments.
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
Teleconferences are scheduled for
Tuesday, June 19, 29, and July 10, and Friday, June 19, 26 and July 10,
Noon Eastern for 2 hours.
We are looking for a volunteer to serve as secretary. Please contact the chair
if you are interested.
July 2009 Goals
Achievements
The Task Group completed comment resolution for comments on TGv D4.0
received in LB 140.
The schedule for completion of the TGv amendment is unchanged (July 2010).
LB140 results were as follows: 149 yes, 36 no, 40 abstain, 80.5% approval.
The meeting minutes will be available at https://mentor.ieee.org/802.11/dcn/09/11-09-0400-00-000v-march-2009-minutes.doc
.
The agenda document is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-0215-07-000v-tgv-march-2009-agenda.ppt .
The closing report is available here: https://mentor.ieee.org/802.11/dcn/09/11-09-0399-00-000v-march-2009-closing-report.ppt
.
The approved minutes for the ad-hoc and teleconferences held in February and
March are available here:
https://mentor.ieee.org/802.11/dcn/09/11-09-0214-02-000v-conference-call-notes-feb-march-09.doc
The LB 140 comments and proposed resolutions are in https://mentor.ieee.org/802.11/dcn/08/11-08-1467-03-000v-lb140-comments.xls
,
and resolutions adopted at the March meeting. 586 comments were received in
LB140, 418 technical comments
and 168 editorial comments.
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
Teleconferences are scheduled for
Tuesday, April 7, 14, 21, 28, May 5, and Friday, April 17, 24, May 1,
Noon Eastern for 2 hours.
We are looking for a volunteer to serve as secretary. Please contact the chair
if you are interested.
May 2009 Goals
Achievements
The Task Group developed comment resolutions for comments on TGv D4.0
received in LB 140.
The schedule for completion of the TGv amendment is unchanged (July 2010).
LB140 results were as follows: 149 yes, 36 no, 40 abstain, 80.5% approval.
The meeting minutes are available at https://mentor.ieee.org/802.11/dcn/09/11-09-0163-01-000v-tgv-january-2009-minutes.doc
.
The agenda document is available here: https://mentor.ieee.org/802.11/file/09/11-09-0029-04-000v-january-2009-agenda.ppt
.
The closing report is available here: https://mentor.ieee.org/802.11/file/09/11-09-0200-00-000v-closing-report-january-2009.ppt
.
The approved minutes for the ad-hoc and teleconferences held in January are
available here:
https://mentor.ieee.org/802.11/file/09/11-09-0008-01-000v-tgv-jan-09-telecon-meeting-notes.doc
.
The LB 140 comments and proposed resolutions are in https://mentor.ieee.org/802.11/file/08/11-08-1467-02-000v-lb140-comments.xls
586 comments were received in LB133, 418 technical comments and 168 editorial
comments.
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are
available at https://mentor.ieee.org/802.11/documents?is_group=000v
.
Teleconferences are scheduled for
February 3, 10, 17 and March 3 at 1200, for 2 hours.
We are looking for a volunteer to serve as secretary. Please contact the chair
if you are interested.
March 2009 Goals
Achievements
The Task Group completed resolving comments on TGv D3.0 received in LB 133,
heard presentations
for new normative text for the draft TGv specification, and voted to advance
Draft 4.0 to Letter Ballot.
The schedule for completion of the TGv amendment is unchanged (July 2010).
LB133 results were as follows: 106 yes, 47 no, 28 abstain, 69% approval.
The meeting minutes will be available at https://mentor.ieee.org/802.11/dcn/08/11-08-1353-00-000v-nov-2008-meeting-notes.doc
.
The agenda document is available here: https://mentor.ieee.org/802.11/file/08/11-08-1200-08-000v-november-2008-agenda.ppt
.
The closing report is available here: https://mentor.ieee.org/802.11/file/08/11-08-1404-00-000v-november-2008-closing-report.ppt .
The approved minutes for the ad-hoc and teleconferences held in September,
October and November are available here:
https://mentor.ieee.org/802.11/file/08/11-08-1199-03-000v-2008-sept-oct-nov-telecon-meeting-notes.doc
.
The LB 133 comments and proposed resolutions are in https://mentor.ieee.org/802.11/file/08/11-08-0801-05-000v-lb133-comments.xls
.
1414 comments were received in LB133, 785 technical comments and 629 editorial
comments. Resolutions have been
adopted for all comments.
The following technical presentations were made:
•
https://mentor.ieee.org/802.11/file/08/11-08-1396-00-000v-normative-text-annexq-update.pdf
•
https://mentor.ieee.org/802.11/file/08/11-08-1322-00-000v-times-of-refused-associated-requests.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-1295-01-000v-enhancing-bss-transition-management.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1294-00-000v-enhancing-bss-transition-management.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-1013-07-000v-additional-diagnostic-edits.doc
Comment
resolution documents and related presentations containing comments for which
resolutions were considered are listed below:
•
https://mentor.ieee.org/802.11/file/08/11-08-1391-01-000v-utc-tsf-offset.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1378-00-000v-improving-multicast-reliability.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-1354-00-000v-prioritized-action-frames.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1327-02-000v-lb133-cid-1239-1257-resolution.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1283-02-000v-diagnostic-device-type.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1282-02-000v-collocated-device.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1262-01-000v-normative-text-for-utc-reference.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0050-03-000v-normative-text-for-directed-multicast.doc
Teleconferences are scheduled for
January 6, 13, February 3, 10, 17 and March 3 at 1200, for 2 hours.
We are looking for a volunteer to serve as secretary. Please contact the chair
if you are interested.
January 2009 Goals
Achievements
The Task Group continued resolving comments on TGv D3.0 received in LB 133,
and heard presentations
for new normative text for the draft TGv specification. The schedule for
completion was changed, from completion in March 2010,
to completion in July 2010. LB133 results are as follows: 106 yes, 47 no, 28
abstain, 69% approval.
The meeting minutes will be available at https://mentor.ieee.org/802.11/dcn/08/11-08-1064-00-000v-minutes-tgv-waikoloa-meeting-sept-08.doc
.
The agenda document is available here: https://mentor.ieee.org/802.11/file/08/11-08-1041-10-000v-september-2008-agenda.ppt.
The closing report is available here: https://mentor.ieee.org/802.11/file/08/11-08-1185-00-000v-tgv-september-2008-closing-report.ppt
.
The approved minutes for the ad-hoc and teleconferences held in August and
September are available here:
https://mentor.ieee.org/802.11/file/08/11-08-0979-03-000v-tgv-august-september-08-telecon-and-ad-hoc-meeting-notes.doc
.
The LB 133 comments are in https://mentor.ieee.org/802.11/file/08/11-08-0801-01-000v-lb133-comments.xls.
1414 comments were received in LB133, 785 technical comments and 629 editorial
comments. Resolutions have been
adopted for all but 27 received comments, representing approximately 10 unique
issues.
The following technical presentations were made:
•
https://mentor.ieee.org/802.11/file/08/11-08-1138-01-000v-normative-text-annexq.pdf
Comment resolution documents and related presentations containing comments for which resolutions were considered are listed below:
•
https://mentor.ieee.org/802.11/file/08/11-08-1098-00-000v-overview-of-channel-usage-change.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-1095-00-000v-normative-changes-for-channel-usage.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1034-01-000v-lb133-virtual-ap-text.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1031-00-000v-annex-l-update.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1013-05-000v-additional-diagnostic-edits.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-1011-04-000v-lb133-timing-measurement-comments.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0998-00-000v-fbms-cid-1275.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0993-02-000v-lb-133-comments-virtualap.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0991-02-000v-lb133-co-located-interference-report.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0990-01-000v-lb133-traffic-generation.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0987-03-000v-lb133-comments-event.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0986-04-000v-lb133-comments-sleepmode.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0980-00-000v-lb133-cid101.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0956-07-000v-lb133-tclas-sta-statistics-resolutions.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0954-00-000v-proposed-resolution-to-lb133-cid-17.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0947-02-000v-ap-power-down-notification.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0889-03-000v-lb133-comments-multicast-diagnostics.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0866-03-000v-lb133-proxy-arp-comments.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0841-03-000v-lb133-general-comments.xls
•
Teleconferences are scheduled for
September 23rd, October 7th, October 21st and
November 4th at 1200, for 2 hours.
The Task Group acknowledges the contributions of Bob Miller, who has served as
secretary of the TG from its inception
through the September 2008 meeting. So we are looking for a volunteer to serve
as secretary beginning in November.
Please contact the chair if you are interested.
November 2008 Goals
Achievements
The Task Group met to begin resolving comments on TGv D3.0 received in LB 133,
and to hear presentations
for new normative text for the draft TGv specification. LB133 results are as
follows: 106 yes, 47 no, 28 abstain, 69% approval.
The meeting minutes will be available at https://mentor.ieee.org/802.11/dcn/08/11-08-0832-00-000v-july-2008-minutes-for-task-group-v.doc
The agenda document is available here: https://mentor.ieee.org/802.11/file/08/11-08-0700-04-000v-july-2008-agenda.ppt.
The closing report is available here: https://mentor.ieee.org/802.11/file/08/11-08-0925-01-000v-tgv-july-2008-closing-report.ppt.
The LB 133 comments are in https://mentor.ieee.org/802.11/file/08/11-08-0801-00-000v-lb133-comments.xls.
1414 comments were received in LB133, 785 technical comments and 629 editorial
comments.
The following technical presentations were made:
•
https://mentor.ieee.org/802.11/file/08/11-08-0891-00-000v-timing-measurement.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-0910-01-000v-rrm-wnm-overloading.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-0844-01-000v-link-layer-performance-test.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-0842-00-000v-normative-text-for-timing-measurement.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0763-01-000v-location-coordinates-inquiry.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-0759-00-000v-ap-power-down-notification.ppt
•
Comment resolution documents containing comments for which resolutions were agreed, are listed below:
•
https://mentor.ieee.org/802.11/file/08/11-08-0901-00-000v-lb133-diagnostics-comments.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0886-01-000v-lb133-comments-tfs.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0883-02-000v-lb133-comments-bsstransition.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0866-01-000v-lb133-proxy-arp-comments.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0841-01-000v-lb133-general-comments.xls
•
Teleconferences are scheduled for
August 12th at 1200, August 26th at 1300 and September 2nd
at 1300, for 2 hours.
An ad-hoc meeting is scheduled for August 18-20 in Santa Clara.
Also, Bob Miller is able to serve as secretary through the September 2008
meeting. So we are looking for a volunteer
to serve as secretary beginning in November. Please contact the chair if you
are interested.
September 2008 Goals
Achievements
The Task Group met to continue resolving comments on TGv D2.0 received in LB
123, and to hear presentations
for new normative text for the draft TGv specification. Approximately 1000
comment resolutions were approved at the
May 2008 meeting, and the resolutions will be incorporated into TGv Draft 2.02
The Task Group voted to go to Letter Ballot, with
a procedural and then Letter Ballot on Draft 2.02/3.0.
The meeting minutes are available at https://mentor.ieee.org/802.11/file/08/11-08-0569-01-000v-minutes-tgv-jacksonville-meeting-may-08.doc
.
The agenda document is available here: https://mentor.ieee.org/802.11/file/08/11-08-0500-11-000v-may-2008-agenda.ppt
.
The Closing report is available here: https://mentor.ieee.org/802.11/file/08/11-08-0696-00-000v-may-2008-closing-report.ppt
The approved meeting minutes from teleconferences and the April 28-30 ad-hoc
meeting are available here: https://mentor.ieee.org/802.11/file/08/11-08-0446-06-000v-april-and-may-2008-telecon-and-ad-hoc-meeting-notes.doc
.
The LB 123 comments are in https://mentor.ieee.org/802.11/file/08/11-08-0265-01-000v-lb123-comments.xls
.
1034 comments were received in LB123, 820 technical comments and 214 editorial
comments.
The following technical presentations were made:
•
https://mentor.ieee.org/802.11/file/08/11-08-0670-01-000v-normative-text-for-tim-broadcast.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0560-03-000v-presentation-to-accompany-11-08-0233r2.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-0497-00-000v-d2-0-location-changes-summary.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-0491-02-000v-tgu-tgv-ad-hoc-april-2008.ppt
•
https://mentor.ieee.org/802.11/file/08/11-08-0483-01-000v-normative-text-for-channel-usage.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0050-01-000v-normative-text-for-directed-multicast.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0049-01-000v-directed-multicast.ppt
Comment resolution documents containing comments for which resolutions were agreed, are listed below:
•
https://mentor.ieee.org/802.11/file/08/11-08-0367-05-000v-lb123-comment-resolutions-proxy-arp.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0657-01-000v-fbms-clause11-updates.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0610-03-000v-lb123-comments-event.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0603-00-000v-lb123-comments-annex.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0487-02-000v-lb123-comments-rm.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0486-03-000v-lb123-comments-sleepmode.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0458-05-000v-lb123-comment-resolutions-diagnostics.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0445-05-000v-lb-123-comment-resolutions-general.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0440-02-000v-lb123-comments-location.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0439-07-000v-lb123-comments-fbms.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0438-01-000v-lb123-comment-resolutions-virtual-ap.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0370-06-000v-lb123-tclas-comment-resolutions.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0367-06-000v-lb123-comment-resolutions-proxy-arp.xls
•
https://mentor.ieee.org/802.11/file/07/11-07-2779-01-000v-tim-virtual-bitmap-example.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0366-05-000v-lb123-multicast-diagnostics-comments.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0659-01-000v-lb123-sta-statistics-resolutions.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0645-01-000v-text-changes-for-cids-1012-874-and-987.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0602-02-000v-sleep-mode-and-gtk-update.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0450-01-000v-lb123-general-comment-resolution-text.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0441-02-000v-normative-text-for-d2-0-location.doc
•
https://mentor.ieee.org/802.11/file/08/11-08-0233-02-000v-co-located-interference-reporting.doc
•
No teleconferences or ad-hoc
meetings are scheduled between the May and July sessions.
July 2008 Goals
Achievements
The Task Group met to begin resolving comments on TGv D2.0 received in LB
123, to hear presentations
for new normative text for the draft TGv specification, and to review the
proposed TGv PAR extension.
The TGV PAR extension was approved by the Task Group, The Working Group, and
the Executive Committee, see
https://mentor.ieee.org/802.11/file/08/11-08-0322-01-000v-par-extension.doc
.
The meeting minutes are available here: https://mentor.ieee.org/802.11/file/08/11-08-0337-00-000v-minutes-tgv-orlando-meeting-mar-08.doc
.
The agenda document is available here: https://mentor.ieee.org/802.11/file/08/11-08-0264-07-000v-march-2008-agenda.ppt
.
The Closing report is available here: https://mentor.ieee.org/802.11/file/08/11-08-0425-00-000v-orlando-closing-report.ppt
.
The LB 123 comments are in https://mentor.ieee.org/802.11/file/08/11-08-0265-01-000v-lb123-comments.xls
.
1034 comments were received in LB123, 820 technical comments and 214 editorial
comments.
The following technical presentations were made, without adoption of
corresponding normative text.
•
https://mentor.ieee.org/802.11/file/08/11-08-0050-00-000v-normative-text-for-directed-multicast.doc
Comment resolution documents containing comments for which resolutions were agreed, are listed below:
•
https://mentor.ieee.org/802.11/file/08/11-08-0366-02-000v-lb123-multicast-diagnostics-comments.xls
•
https://mentor.ieee.org/802.11/file/08/11-08-0367-05-000v-lb123-comment-resolutions-proxy-arp.xls
The following document will be
discussed on an upcoming conference call:
•
https://mentor.ieee.org/802.11/file/08/11-08-0233-02-000v-co-located-interference-reporting.doc
TGv teleconferences are scheduled
for April 1, 8, 15, 22 and May 6th at 1200 Eastern.
An ad-hoc meeting is scheduled for April 28, 29, 30 in the
May 2008 Goals
Achievements
The Task Group met to continue resolving comments on TGv D1.0 received in LB
108, and to hear presentations
for new normative text for the draft TGv specification.
The LB 108 comments are in 11-07-2368-05-000v-LB108-comment-resolutions. The
editor has incorporated over 1300 comment resolutions into
TGv Draft 1.03, which was approved as the current TGv draft. Approximately 650
comment resolutions were approved at the
January 2008 meeting, and the resolutions will be incorporated into TGv Draft
1.04. The Task Group voted to go to Letter Ballot, with
a procedural and then Letter Ballot on Draft 1.04/2.0.
Thanks to Lusheng Ji (AT&T Corporation) who stepped in as secretary for the meeting, as Bob wasn’t able to attend.
The following technical presentations were made, without adoption of corresponding normative text.
•
11-07-2897-02-000v-efficient-tim-element-supporting-multiple-bssids.ppt
•
11-07-2710-02-000v-cid-102-channel-allocation-for-p2p.ppt
•
11-08-0049-00-000v-directed-multicast.ppt
Resolutions to the following comments, generated on conference calls were approved:
– 07-2501-04 (STA Statistics) – All “accepted”, “counter” and “declined” comments
–
07-2729-04 (Diagnostics) – CIDs 208, 212, 907, 908, 909, 1341, 1999, 265,
703, 280, 650, 725, 939, 1487, 1492, 1494, 1496, 1638, 1643, 1645, 1647, 1813,
1818, 1820, 1822, 1946, 397, 654, 1268, 1065, 1086, 1340, 1373, 1555, 1710,
1811, 705, 781, 882, 894, 904, 905, 906, 1056, 1272, 1338, 910, 1055, 1271,
940, 941, 954, 956, 1009, 1011, 1043, 1275, 1087, 1088, 1553, 1708, 1879, 1090,
1092, 1150, 1198, 1200, 1211, 1239, 1241, 1771, 1242, 1244, 1245, 1246, 1247,
1249, 1252, 1253, 1267, 1339, 1375, 1490, 1554, 1641, 1709, 1816, 1880, 1328,
1240, 1770, 1334, 1337, 1342, 1343, 1424, 1425, 1513, 1514, 1515, 1543, 1996,
1997, 2000, 2005
– 07-2634-02 (Annex) – CIDs 224, 1254
– 07-2498-06 – (Event) – CIDs 204, 388, 1197, 1238, 1236, 1995, 1906, 112, 144, 264, 702, 896, 948, 1287, 1332, 1412, 1483, 1634, 1807, 333, 1547, 1702, 1873, 648, 740, 1266
– 07-2559-04 (Presence) – CIDs 1344, 573, 817, 914, 1399, 1177, 282, 417
– 07-2625-04 (Virtual AP) – CIDs 659, 660, 751, 752, 1162, 774, 775, 786, 816, 822, 917, 1156, 1159, 1160, 1163, 1169, 1170, 1191, 1204, 1256, 1258, 1259, 1289
– 07-2509-08 (Multicast Diagnostics) CIDs 67, 68, 1922, 241, 374, 1921, 637, 778, 1403, 1481, 1632, 1805, 1924, 1923, 1925, 266, 704, 920, 1207, 1372, 1871, 1923, 1927, 1928
Comment resolution documents that contain additional comments whose
resolutions were approved, and the proposed changes approved for inclusion into
the TGv draft
are listed below. Note that not all comment resolutions listed in each document
were adopted:
§
11-07-2558-04-000v-lb-108-comment-resolutions-fbms.xls
§
11-07-2525-06-000v-LB-108-general-comment-resolutions
§
11-07-2501-06-000v-lb-108-sta-statisticscomment-resolution.xls
§
11-07-2576-06-000v-lb108-traffic-generation.xls
§
11-07-2634-03-000v-LB-108-comment-resolutions-Annex
§
11-07-2625-06-000v-LB108-Virtual-AP-comment-resolutions.xls
§
11-07-2498-08-000v-LB-108-Event-comment-resolutions
§
11-07-2559-06-000v-LB-108-comment-resolutions-presence
§
11-07-2506-06-000v-LB108-comment-resolutions
co-located interference
§
11-07-2509-08-000v-LB108
Multicast Diagnostics comment resolutions
§
11-07-2729-06-000v-lb-108-comment-resolutions-diagnostics
§
11-08-0124-01-000v-revised-text-on-co-located-interference-reporting.doc
§
11-08-0157-01-000v-co-located-interference-cr-proposal.doc
§
11-08-0154-01-000v-general-cids-1329-and-1335.doc
There are no scheduled
teleconferences between the January and March 2008 meetings.
March 2008 Goals
Achievements
The Task Group met to resolve comments on TGv D1.0 received in LB 108, and
to hear presentations
for new normative text for the draft TGv specification.
The LB 108 comments are in 11-07-2368-03-000v-LB108-comment-resolutions. The
editor has incorporated over 640 comment resolutions into
TGv Draft 1.02, which was approved as the current TGv draft. Approximately 750
comment resolutions were approved at the
November meeting, and the resolutions will be incorporated into TGv Draft 1.03.
Approximately 600 of the 2006 LB 108 comments remain to be resolved. Of the
remaining 600 comments,
approximately 100 comments were agreed to at the November meeting, but not
approved, due to the need to meet
the 4-hour rule. Proposed resolutions for approximately 200 of the remaining
600 comments have been generated
but not yet reviewed and approved, and resolutions need to be generated for the
remaining 300 comments.
The following technical presentations were made; no motions were brought
forward to include the proposed text into the TGv draft.
•
11-07-2897-01-000v-efficient-tim-element-supporting-multiple-bssids.ppt
•
11-07-2736-02-000v-jamming-co-located-interference-report.ppt
•
11-07-2710-01-000v-cid-102-channel-allocation-for-p2p.ppt
•
11-07-2684-01-000v-overlapping-bss-proposed-solution.ppt
Resolutions to the following comments, generated at the ad-hoc and on conference calls were approved:
• 07-2634-01 (Annex) – CIDs 219, 220, 225, 254, 270, 552, 553, 1398
• O7-2498-02 – (Event) – All “accepted”
• 07-2558 -02 (FBMS) – All “accepted”, “counter” and “declined”
• 07-2525-04 (General) – CIDs 1290. 1285, 1282, 1321, 1406, 1584, 1433, 1230, 1141, 1153
• 07-2559-02 (Presence) - All “accepted”, “counter” and “declined”
• 07-2484-01 (Proxy ARP) – CIDs 1261, 1532, 1684, 1858, 1988
•
07-2533-03 (Roaming Management) – CIDs 98,
462, 465, 471, 645, 665, 753, 918, 919, 947, 952,1004,
974, 1033, 1036, 1064, 1067, 1166, 1178, 1359, 1363, 1353, 1405
•
07-2561-04 (Sleep Mode) –CIDs 170, 328, 355, 489, 495, 502, 505, 510, 546,
590, 693, 763, 764, 810,
879, 934, 945, 1029, 1108, 1190, 1896, 1201, 1380, 1434, 1585, 1957, 1960,
1961, 1962, 1989
• 07-2712-03 (TFS) - All “accepted”, “counter” and “declined”
•
07-2625-03 (Virtual AP) – 59, 108, 128,
164, 165, 214, 872, 234, 884,
949, 950, 951, 1006, 1191,
1204, 1256, 276, 283, 360, 443, 608, 620, 623, 624, 625, 627
Comment resolution documents that contain additional comments whose
resolutions were approved, and the proposed changes approved for inclusion into
the TGv draft
are listed below. Note that not all comment resolutions listed in each document
were adopted:
§
11-07-2506-00-000v-lb-108-comment-resolutions-co-located-interferenc
§
11-07-2509-00-000v-LB108
Multicast Diagnostics comment resolutions
§
11-07-2498-00-000v-LB-108-Event-comment-resolutions
§
11-07-2789-05-000v-proposed-comment-resolutions-for-tim-broadctas
§
11-07-2729-01-000v-lb-108-comment-resolutions-diagnostics
§
11-07-2712-04-000v-lb-108-comment-resolutions_TFS
Comments in the following documents
were developed, but not yet adopted:
§
11-07-2501-02-000v-lb-108-STA-Statisticscomment-resolution
The Task Group approved 6
teleconferences, to be held on November 29, December 6, and December 13
at 14:00 Eastern, and December 18th, January 3rd, and
January 10th at 18:00 Eastern, for 2 hours.
January 2008 Goals
Achievements
The Task Group met to resolve comments on TGv D1.0 received in LB 108, and
to hear presentations for new normative text for the draft TGv specification.
Review of the objectives was deferred to the November meeting.
LB 108 on TGv D1.0 did not reach the required 75%, the result, per Harry’s e-mail was:
This ballot was a Technical Letter Ballot for Task Group-v to approve Draft 1.0.
Ballot Open Date: July 31st, 2007 - 23:59 ET
Ballot Close Date: August 30th, 2007 - 23:59 ET
RESPONSE RATE:
This ballot has met the 50% returned ballot ratio requirement, per the 802 LMSC
Policies and Procedures, dated January 4th, 2006, section 7.2.4.2 requirement.
278 eligible people in this ballot group.
132 affirmative votes
77 negative votes
38 abstention votes
===
274 votes received = 88.85% returned
APPROVAL RATE:
The 75% affirmation requirement has not been met, per the 802 LMSC Policies and
Procedures, dated January 4th, 2006, section 7.2.4.2 requirement.
132 affirmative votes
= 63.16% affirmative
77 total negative votes
= 36.84% negative
The
LB 102 comments are in 11-07-2368-02-000v-LB108-comment-resolutions. The editor
has incorporated 484 of the editorial comments into
TGv Draft 1.01, which was approved as the current TGv draft. 2006 comments were
received, of which approximately 1500 were technical and
500 were editorial.
The following technical presentations were made; no motions were brought
forward to include the proposed text into the TGv draft.
· 11-07-2085-04-000v-co-located-interference-enhancements-for-downlink-protection.ppt
· 11-07-2086-02-000v-normative-text-proposal-for-downlink-protection.doc
Comment resolution documents that contain comments whose resolutions were
approved, and the proposed changes approved for inclusion into the TGv draft
are listed below. Note that not all comment resolutions listed in each document
were adopted:
§
11-07-2480-00-000v-LB108-ECSA-comment-resolutions
§
11-07-2506-00-000v-lb-108-comment-resolutions-co-located-interferenc
§
11-07-2525-00-000v-LB108-General-comment-resolutions
§
11-07-2509-00-000v-LB108
Multicast Diagnostics comment resolutions
§
11-07-2484-00-000v-LB108-Proxy-ARP-comment-resolutions
§
11-07-2533-00-000v-lb-108-comment-resolutions_RoamingManagement
§
11-07-2561-00-000v-lb108-SleepMode-comment-resolution
Comments in the following documents
were developed, but not yet adopted:
§
11-07-2501-00-000v-lb-108-STA-Statisticscomment-resolution
§
11-07-2552-00-000v-LB
108 proposed comment resolutions for TIM Broadcast
§
11-07-2558-00-000v-lb
108 comment resolutions fbms
§
11-07-2498-00-000v-LB-108-Event-comment-resolutions
The Task Group approved 4
teleconferences, to be held on October 4, 18, 25 and November 1, and
one Ad-Hoc meeting, to be held November 5-7 in
September 2007 Goals
Achievements
The Task Group met to resolve informal comments, adopt new normative text
for the draft TGv specification, and
forward Draft P802.11v to the 802.11 WG for initial Letter Ballot. The Working
Group approved forwarding Draft
P802.11v to Letter Ballot by a vote of 79-1-3.
·
11-07-0118-05-000v-normative-text-preferred-channel.doc
·
11-07-0468-02-000v-preferred-channel-dfs
·
11-07-0672-04-000v-tim-broadcast.ppt
·
11-07-0671-00-000v-normative-text-tim-broadcast.doc
·
11-07-2085-00-000v-co-located-interference-enhancements-for-downlink-protection.ppt
·
11-07-2086-00-000v-normative-text-proposal-for-downlink-protection.doc
·
11-07-2115-00-000v-access-point-collaboration.ppt
·
11-07-2074-00-000v-access-point-collaboration.doc
·
11-07-2128-00-000v-leader-based-multicast.ppt
·
11-07-2127-00-000v-normative-text-leader-based-multicast.doc
·
11-07-2148-00-000v-traffic-filtering-and-sleep-mode-presentation.ppt
·
11-07-2169-00-000v-traffic
·
11-07-2155-00-000v-advanced-event-request-and-report.ppt
·
11-05-0827-13-000v-tgv-objectives.doc
The following normative text was approved for inclusion into the TGv draft:
·
11-07-2169-00-000v-traffic
·
11-07-0671-04-000v-normative
The task group's internal review has been completed. Comment resolution
documents which were
approved for inclusion into the TGv draft were:
•
11-07-2126-00-000v-measurement-comment-resolution.doc
•
11-07-2059-00-000v-sta-bss-comment-resolution.doc
•
11-07-0728-01-000v-tgv-draft-0-10-validation-review-comments-event-category.xls
for CID #78, #84, #85, #224, and #226
•
11-07-0594-04-000v-tgv-draft-0-10-validation-review-comments.xls
for CID#196, and #164
•
11-07-2209-00-000v-pics-table-entry-on-the-co-located-interference-reporting
September 2007 Goals
Achievements
The task group met to resolve informal comments and adopt new normative text for the draft TGv specification.
·
11-07-0084-02-000v-access-point-collaboration-enhancing-qos-and-spectrum-efficiency.doc
·
11-07-0086-02-000v-access-point-collaboration-enhancing-qos-and-spectrum-efficiency.ppt
·
11-07-0118-03-000v-normative-text-presferred-channel.doc
·
11-07-0298-01-000v-normative-text-presence-e91-clarification.doc
·
11-07-0398-00-000v-dedicated-protection
·
11-07-0465-02-000v-multi-level-power-control.doc
·
11-07-0467-00-000v-interference-diagnositcs.ppt
·
11-07-0474-00-000v-definition-for-ssid-sub-element
·
11-07-0667-00-000v-e911-bits.ppt
·
11-07-0671-00-000v-normative-text-tim-broadcast.doc
·
11-07-0672-00-000v-tim-broadcast.ppt
·
11-07-0687-00-000v-bss-max-idletime.doc
·
11-07-0688-00-000v-bss-max-idletime-presentation.ppt
·
11-07-0695-00-000v-transmit-power-management.ppt
·
11-07-0737-00-000v-sleep-mode-with-ap-filtering.ppt
· 11-07-0754-00-000v-regulatory-class-coverage.doc
The following normative text was approved for inclusion into the TGv draft:
·
11-07-0298-01-000v-normative-text-presence-e91-clarification.doc
·
11-07-0687-00-000v-bss-max-idletime.doc
The task group's internal review is ongoing. To date 20 comments remain. Comment resolution documents include:
•
11-07-0474-00-000v-definition-for-ssid-sub-element
•
11-07-0594-03-000v-tgv-draft-0-10-validation-review-comments.xls
•
11-07-0708-00-000v-tgv-draft-0-10-interference-resolutions
•
11-07-0715-01-000v-introduction-text
•
11-07-0716-00-000v-tgv-draft-0-10-presence
•
11-07-0717-00-000v-tgv-draft-0-10-fbms
•
11-07-0728-00-000v-tgv-draft-0-10-validation-review-comments-event-category
•
11-07-0729-00-000v-tgv-draft-traffic-generation
•
11-07-0738-00-000v-tgv-d0-10-validation-review-comments-bss-transition-management
•
11-07-0735-01-000v-comment-resolutions-tgv-d0-10-validation-review-comments-general
•
11-07-0736-00-000v-comment-resolutions-tgv-d0-10-validation-review-comments-diagnostics
•
11-07-0750-00-000v-tgv-d0-10-validation-review-comments-measurement.xls
•
11-07-0753-00-000v-d0-10-validation-review-comments-multicast-diagnostics-and-virtual-ap
•
11-07-0795-00-000v-comment-resolution-cid233
• 11-07-0802-00-000v-tgv-d0-10-validation-review-comments-ecsa
July 2007 Goals
Achievements
The task group met to proceed on adopting normative text for the draft TGv specification. Many of the presentations this week were revisions from previous meetings.
· 11-05-0827-12-000v-tgv-objectives
· 11-06-1615-11-000v-tgv-internal-review-comment-submissions
· 11-07-0285-00-000v-normative-text-cid-251
· 11-07-0328-00-000v-comment-resolutions-cid293
· 11-07-0234-00-000v-comment-96-resolution
· 11-07-0310-00-000v-tgv-draft-0-08-validation-review-comments
· 11-06-1828-02-000v-admission-control-traffic-request
· 11-07-0327-00-000v-normative-text-proposal-qos-aware-load-balancing
· 11-07-0123-03-000v-comment-resolutions-348-350
· 11-07-0371-00-000v-normative-text-fbms-termination
· 11-07-0308-00-000v-normative-text-fbms-counter-id
· 11-07-0183-01-000v-normative-text-tim-request
· 11-07-0398-00-000v-dedicated-protection
· 11-07-0421-01-000v-sta-location-capability-layer-management-normative-text
· 11-07-0454-00-000v-e911-clarification
· 11-07-0118-03-000v-normative-text-presferred-channel
· 11-07-0467-00-000v-interference-diagnositcs
· 11-07-0144-04-000v-normative-text-leader-based-multicast
· 11-07-0260-01-000v-wake-wlan
· 11-07-0093-03-000v-tgv-internal-review-comment-resolution-gv
· 11-07-0465-00-000v-multi-level-power-control
· 11-07-0252-00-000v-comment-77-resolution
The following normative text was voted to be included in the next TGv draft:
·
11-07-0327-00-000v-normative-text-proposal-qos-aware-load-balancing
·
11-07-0371-00-000v-normative-text-fbms-termination
·
11-07-0308-00-000v-normative-text-fbms-counter-id
·
11-07-0421-01-000v-STA-location-capability-Layer-Management-Normative-Text
The task group's initial internal review is completed, per the following submissions
§ 11-06-1615-11-000v-tgv-internal-review-comment-submissions
§ 11-07-0285-00-000v-normative-text-cid-251
§ 11-07-0328-00-000v-comment-resolutions-cid293
§ 11-07-0234-00-000v-comment-96-resolution
§ 11-07-0310-00-000v-tgv-draft-0-08-validation-review-comments
§ 11-07-0123-03-000v-comment-resolutions-348-350
§ 11-07-0252-00-000v-comment-77-resolution
§ 11-07-0093-03-000v-tgv-internal-review-comment-resolution-gv
May 2007 Goals
Achievements
The task group met to proceed on adopting normative text for the draft TGv specification. Many of the presentations this week were revisions from previous meetings.
To date 236 (of 446) comments have been closed. The following spread sheet is used for the purposes of comment tracking:
March 2007 Goals
Achievements
The task group met to proceed on adopting normative text for the draft TGv specification. Many of the presentations this week were revisions from the September 2006 meeting.
The task group's internal review is completed and 446 comments were submitted. To date 201 comments have been closed. The following spread sheet is used for the purposes of comment tracking:
January 2007 Goals
Achievements
The task group met to proceed on adopting normative text for the draft TGv specification. Many of the presentations this week were revisions from the July 2006 meeting.
The task group agreed to perform an internal review of TGv D0.05, starting on or before or before Sept 29th, 2006 and continuing for 30 days, completing on or before October 30th, 2006.
November 2006 Goals
Achievements
The task group met to proceed on adopting normative text for the draft TGv specification. Many of the presentations this week were revisions from the May 2006 meeting.
September 2006 Goals
Achievements
The task group met to proceed on adopting normative text for the draft TGv specification. Many of the presentations this week were revisions from the March 2006 meeting.
July 2006 Goals
Achievements
TGv met to complete the Q&A process and hold motions to accept draft text. Some of the presentations provided this week were substantive text, while others were addressing existing (or proposed) TGv objectives.
May 2006 Goals
Achievements
TGv met to complete the Q&A process and hold motions to accept draft text. Some of the presentations provided this week were substantive text, while others were addressing existing (or proposed) TGv objectives.
The only submission that was accepted as draft text during this meeting was 11-06-0167-00-000v-normative-text-proposal-tgv-framework, which is considered the skeleton for the TGv draft text moving forward.
March 2006 Goals
Achievements
Following the procedure agreed upon in September 2005 and documented 11-05/0918r2), this meeting was focused on listening to substantive text submitted to the TGv task group.
January 2005 Goals
Achievements
The main achievements of this meeting were to continue the objectives discussion and updated TGV objectives document (11-05/0827r3). The TG also agreed upon a process for substantive text selection, which is described in 11-05/918r0.
November 2005 Goals
Achievements
The main achievements of this meeting were to continue the requirements discussion and create the first TGV objectives document (11-05/0642r1)
September 2005 Goals
Achievements
The main achievements of this meeting were to work on TGv requirements
July 2005 Goals
Achievements
The main achievements of this meeting were
May 2005 Goals
USEFUL LINKS TO OTHER SITES:
IEEE P802.11 WLANs RELATED
OTHER SITES
This page is maintained by Dorothy Stanley. Comments are welcome.