Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[STDS-802-11-CAC] TGba webpage



--- This message came from the IEEE 802.11 Chairs' Advisory Committee Reflector ---
Hello Stephen,

Please find the updated  TGba webpage attached.

Regards,
Minyoung
_______________________________________________________________________________

IF YOU WISH to be Removed from this reflector, PLEASE DO NOT send your request to this CLOSED reflector. We use this valuable tool to communicate on the issues at hand.

SELF SERVICE OPTION: Point your Browser to - http://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-CAC and then amend your subscription on the form provided. If you require removal from the reflector press the LEAVE button.

Further information can be found at: http://www.ieee802.org/11/Email_Subscribe.html _______________________________________________________________________________

Title: IEEE P802.11 - TASK GROUP BA
--- This message came from the IEEE 802.11 Chairs' Advisory Committee Reflector ---

IEEE P802.11 - TASK GROUP BA - GROUP INFORMATION


Status of Project IEEE 802.11ba

Wake-up Radio (WUR) Operation

Minyoung Park, Chair
1st Vice-Chair: Yunsong Yang, 2nd Vice-Chair: Eunsung Park
Leif Wilhelmsson, Recording Secretary


Background

In May 2016, the Wake-up Radio (WUR) Study Group was created within IEEE 802.11 Working Group to develop PAR (project authorization request) and CSD (criteria for standrd development) to enable an energy efficient data reception mode without increase of latency for the 802.11 standard. (See: https://mentor.ieee.org/802.11/dcn/16/11-16-0722-01-0000-proposal-for-wake-up-receiver-study-group.pptx)

The WUR SG completed developing PAR and CSD documents in November 2016. The PAR and CSD was approved by IEEE-SA Standards Board in December 2016. A new task group TGba has been formed in the 802.11 Working Group to develop an amendment titled "Wake-up Radio Operation".


September 2017, Waikoloa, Hawaii, USA

·       Goals

o   Review technical presentations

§  Strictly limit the presentation to the basic operation of WUR

o   Prepare for TGba Draft 0.1 in November 2017

o   Work on TGba task group documents

o   Review TG timeline

July 2017, Berlin, Germany

·       Discussed MAC architecture implications of TGba

·       Reviewed technical presentations

o   14 PHY / 11 MAC presentations

·       Approved TGba Spec Framework Document (SFD)

o   IEEE 802.11-17/575r1

·       Reviewed TGba task group documents

o   Usage model document

o   Simulation Scenarios and Evaluation Methodology Document

·       Reviewed the TG timeline

·       Set goals for the September 2017 meeting and teleconference schedule

·       Agenda: see doc.: IEEE 802.11-17/883r8

May 2017, Daejeon, Korea

·       Reviewed technical presentations (33 out of 43 submissions)

o   PHY and MAC

o   Made progress reaching consensus on basic design of PHY/MAC

·       Approved TGba Spec Framework Document (SFD): IEEE 802.11-17/575r0

·       Reviewed TGba task group documents

o   Usage model document

o   Simulation Scenarios and Evaluation Methodology Document

·       Reviewed the TG timeline

·       Set goals for the July 2017 meeting and teleconference schedule

·       Agenda: see doc.: IEEE 802.11-17/545r11

March 2017, Vancouver, BC, Canada

·       TG elected 2 Vice-Chairs

o   1st VC: Yunsong Yang (Huawei): Y/N/A = 62/0/1

o   2nd VC: Eunsung Park (LG Electronics): Y/N/A = 60/0/1

·       Reviewed technical presentations (17 out of 35 submissions)

o   Started to reach consensus on high-level technical PHY/MAC concepts

·       TGba Spec Framework Document will be created based on the passed motions

o   TG passed 16 technical motions and 2 use case motions 

·       Updated TGba task group documents

o   Functional Requirements Document (IEEE 802.11-17/38r2)

o   Simulation Scenarios and Evaluation Methodology Document (IEEE 802.11-17/188r4)

·       Reviewed the TG timeline

·       Set goals for the May 2017 meeting and teleconference schedule

·       Agenda: see doc.: IEEE 802.11-17/193r7

 

January 2017, Atlanta, Georgia, USA

  • TG approved the TG leadership structure
    • Chair, 2 Vice-chairs, Secretary
    • Vice-chairs election in March 2017
  • TG Secretary confirmed by the TG (Y/N/A: 57/0/2)
    • TG Secretary: Leif Wilhelmsson
  • Discussed TG spec development process
  • TG approved to create four TG documents
    • Use case document (1st draft [11-17/0029r4] approved by the TG)
    • Functional requirements document
    • Evaluation methodology and simulation scenario document
    • Spec framework document
  • Reviewed technical presentations (21 out of 27 submissions)
  • Approved the TG timeline
    • 2017
      • January: TGba formation meeting
      • November: TGba Draft 0.1
    • 2018
      • March: TGba Draft 1.0
      • September: TGba Draft 2.0
    • 2019:
      • March: MDR (mandatory document review)
      • July: formation of sponsor ballot pool
      • September: Sponsor ballot
    • 2020 July:
      • RevCom
  • Agenda: see doc.: IEEE 802.11-16/1593r6

IEEE 802.11 Wake-up Radio Study Group

November 2016, San Antonio, Texas, USA

  • Work completed during the November 2016 F2F
    • Reviewed the comments on the PAR and CSD from 802.11 PAR SC, other WGs, and EC
    • Resolved all the comments and revised the PAR and CSD
    • The revised PAR and CSD have been approved by the SG and 802.11 WG 
    • Approved the comment responses
    • Approved SG extension
    • Reviewed the presentations
      • 11-16/1379, On error rate performance of OOK in AWGN, Simon Qu (Blackberry), 20min
      • 11-16/1400r0, Power Efficient WUR AP Discovery, Xiaofei Wang (InterDigital)
      • 11-16/1445 Overall MAC Procedure for WUR, Kiseon Ryu (LG Electronics)
      • 11-16/1501, AP Discovery using WUR, Igor Kim (ETRI)
      • 11-16/1504, Discussion of WUR Packets Design, Ke Yao (ZTE)
      • 11-16/1506r0, Coexistence Mechanism for Wakeup Radio Signal Follow-up, Yongho Seok (NEWRACOM)
      • 11-16/1465, WUR usage model, Ross (Huawei)
      • 11-16/1470, Wake-up and Data Exchange Sequences, John Son (WILUS)
      • 11-16/1460, WUR MAC discussion, Liwen Chu (Marvell)
      • 11-16/1326r1, Feedback from the 802.11 PAR Review SC, Jon Rosdahl
    • Reviewed the SG timeline
    • Set goals for the January 2017 meeting
      • Decide Task Group leadership structure
      • Decide TG specification development process
      • Review TG timeline
      • Review technical presentations
    • Teleconference schedule
      • December 12th Monday 18:00 ET (1 hour)
  • Agenda: see doc.: IEEE 802.11-16/1324r7

September 2016, Warsaw, Poland

  • Summary since July 2016 F2F
    • Call for comments on the initial PAR (11-16/1045r3) and CSD (11-16/936r1) documents announced on August 4th and closed on August 14th
      • Collected 22 comments on the PAR and 2 editorial comments on the CSD
      • Held three teleconference calls on August 15th, 23rd, and 29th to discuss and resolve the comments
      • The SG Chair appointed Shahrnaz Azizi to lead the comment resolution for the PAR (email)
      • Resolutions for the PAR comments were discussed through email threads   
      • The discussions summarized in 11-16/1119r0 and reviewed with the SG on Aug. 29th
  • Work completed during the September 2016 F2F
    • Completed the development of the PAR and CSD
    • The PAR and CSD contained in 11-16/1045r6 and 11-16/936r3 have been approved by the SG and 802.11 WG to be posted to the IEEE 802 Executive Committee (EC) agenda for 802 WG preview and EC approval
      • 802.11 WG motion results (11-16/1125r2)
        • PAR: 104-1-8 (passes)
        • CSD: 103-1-8 (passes)
    • Reviewed the following presentations
      •  PAR related submissions:
        • 11-16/1229r2, WUR update on PAR comment resolution, Shahrnaz Azizi (Intel)
        • 11-16/1045r4, A PAR proposal for WUR SG, Shahrnaz Azizi (Intel)
      • CSD related submissions:
        • 11-16/936r2, A CSD proposal for wake-up radio (WUR), Osama Aboul-Magd (Huawei)
      • Other submissions:
        • 11-16/1144r0, Further investigation on WUR performance, Eunsung Park (LGE)
        • 11-16/1147r0, WUR and efficiency tradeoffs (Newracom)
        • 11-16/1215r0, Demand of Being Waken Up While Moving Follow-up, Ke Yao (ZTE)
        • 11-16/1217r0, WUR based Broadcast Reference Signal, John Son (WILUS)
        • 11-16/1243r0, Multi user access for Wakeup Radio, Hanseul Hong (Yonsei Univ.)
    • Reviewed the SG timeline
    • September meeting agenda:
    • September closing report:
  • Goals for the November meeting
    • Review and resolve comments from other WGs and EC members by the WG mid-week plenary meeting
    • Revise PAR and CSD based on the resolutions
    • Submit the revised PAR and CSD for the 802.11 WG approval

July 2016, San Diego, California, USA

  • Submissions reviewed:
    • PAR related submissions:
      • 11-16/974r0, WUR usage scenarios and applications, Shahrnaz Azizi (Intel Corp.)
      • 11-16/970r0, Input on WUR PAR scope, Steve Shellhammer (Qualcomm)
      • 11-16/935r0, A PAR proposal for Wake-up Radio (WUR), Osama AboulMagd (Huawei)
      • 11-16/859r0, WUR SG Proposed PAR, Minyoung Park (Intel Corp.)
    • CSD related submissions:
      • 11-16/936r0, A CSD proposal for Wake-up Radio (WUR), Osama AboulMagd (Huawei)
    • Other submissions:
      • 11-16/865r0, Performance investigation on wake-up receiver, Eunsung Park (LGE)
      • 11-16/927r0, Securing the WUR, Yunsong Yang (Huawei)
      • 11-16/931r0, Demand on roaming for WUR, Bo Sun (ZTE)
      • 11-16/939r0, WUR-based Power Save Operations of AP, John Son (WILUS)
      • 11-16/950r0, Considerations on WUR design, Igor Kim (ETRI)
      • 11-16/968r0, Discussion of Duty-Cycled Wake-Up Receivers, Leif Wilhelmsson (Ericsson)
  • Decided the study group leadership structure
    •  Conducted Vice-Chair election Yunsong Yang (81% approval rate)
    • Appointed Secretary and confirmed by a SG motion Leif Wilhelmsson (unanimous consent)
  • Reviewed and discussed presentations to develop PAR and CSD documents:
    • Use cases, problem statements, scope and purpose
    • Reviewed a merged PAR document in the SG
      • 11-16/1045r2, A PAR proposal for Wake-up Radio, Shahrnaz Azizi (Intel Corp.)
  • Reviewed SG timeline
  • Approved WUR SG extension
  • Set teleconference schedule
  • Latest agenda:
  • Goals for the September meeting
    • Develop PAR and CSD documents R and CSD documents
    • Complete PAR and CSD documents for WG approval
    • Submit PAR and CSD for WG approval


USEFUL LINKS TO OTHER SITES:

IEEE P802.11 WLANs RELATED

OTHER SITES


This page is maintained by Minyoung Park. Comments are welcome.

Copyright (c), the Institute of Electrical and Electronics Engineers, Inc. (IEEE).
All rights reserved.
This website may contain names, logos, designs, titles, words, or phrases that may
constitute trademarks, service marks, or tradenames of the IEEE or other entities
which may be registered in certain jurisdictions.
_______________________________________________________________________________

IF YOU WISH to be Removed from this reflector, PLEASE DO NOT send your request to this CLOSED reflector. We use this valuable tool to communicate on the issues at hand.

SELF SERVICE OPTION: Point your Browser to - http://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-CAC and then amend your subscription on the form provided. If you require removal from the reflector press the LEAVE button.

Further information can be found at: http://www.ieee802.org/11/Email_Subscribe.html _______________________________________________________________________________