Jonathan Segev (Intel Corporation), Chair
Carlos Aldana (Intel Corporation), Vice-chair
Chao-Chun Wang (MediaTek), Technical Editor
July 2016 – San Diego, California
January 2016 – Atlanta, Georgia
September 2015 – Bangkok, Thailand
On January 2015 the Next Generation Positioning Study Group (NGP SG) a study group within the IEEE 802.11 working group had started its activity to address the needs of a Station to identify its absolute and relative position to another station or stations it’s either associated or unassociated with.
The NGP SG has successfully developed a PAR and CSD documents and project 802.11az initiated its work on Sep. 2015.
To defines modifications to both the IEEE 802.11 medium access control layer (MAC) and physical layers (PHY) of High Throughput (HT), Very High Throughput (VHT), Directional Multi Gigabit (DMG) and PHYs under concurrent development (e.g. High Efficiency WLAN (HEW), Next Generation 60GHz (NG60)) that enables determination of absolute and relative position with better accuracy with respect to the Fine Timing Measurement (FTM) protocol executing on the same PHY-type, while reducing existing wireless medium use and power consumption and is scalable to dense deployments.
· 11-16/441 SFD template
· 11-16/424 TGaz Functional Requirements Document working draft
· 11-16/137 TG approved Use Case document
_______________________________________________________________________
Leadership:
• Chair - Jonathan Segev (Intel Corporation)
• Vice chair and acting secretary - Carlos Aldana (Intel Corporation)
• Technical Editor - Chao-Chun Wang (MediaTek)
Group met during the following sessions:
MON |
TUE |
WED |
THU |
FRI |
|
AM1 |
|||||
AM2 |
|
|
|
||
PM1 |
AZ |
AZ |
|||
PM2 |
|||||
Eve |
Main
meeting documents
• 11-16/750 Agenda document
• 11-16/1280 Sep. closing report
• 11-16/441 SFD template
• 11-16/1076 Approved TGaz July meeting minutes
• 11-16/1249 Efficient Positioning Method Applicable in Dense Multi User Scenarios
• 11-16/1256 Functional requirement for secure ranging
• 11-16-1260 Location Measurement Protocol for Unassociated STAs
• 11-16/1013r3 Locationing Protocol for 11az
Main
meeting achievements:
Reviewed proposals on:
•
Channel Sounding approaches
•
Functional Requirements for Security enhancements
•
Negotiation phase in an 11ax MU mode
•
Set telecon times and goals for Nov. meeting.
Teleconferences:
•
Nov. 2nd
10:00 ET for 1hr.
Nov. 2016 plans
•
Continue on Functional Requirement Document development.
•
Approve initial submissions of technical material towards
SFD text where FRD is sufficiently mature.
•
Review technical submissions on measurement phase
approaches, negotiation phase, adaptation to 11ax MU mode and secured location
schemes.
Timeline
•
Reviewed timelines, and identified schedule slip. Hard to
evaluate and update impact to overall program as SFD and FRD progress during
this session were limited.
•
Group made aware of this, and once progress is made
timelines to be reevaluated.
•
Last approved TG timelines:
Leadership:
• Chair - Jonathan Segev (Intel Corporation)
• Vice chair and acting secretary - Carlos Aldana (Intel Corporation)
• Technical Editor - Chao-Chun Wang (MediaTek)
Group met during the following sessions:
MON |
TUE |
WED |
THU |
FRI |
|
AM1 |
|||||
AM2 |
|
|
|
||
PM1 |
AZ |
AZ |
|||
PM2 |
|||||
Eve |
Main
meeting documents
• 11-16/752 Agenda document
• 11-16/751 July closing report
• 11-16/441 SFD template
• 11-16/424 TGaz Functional Requirements Document working draft
• 11-16/778 Approved TGaz May meeting minutes
• 11-16/1013 Locationing Protocol for 11az
• 11-16/1015 Location Measurement Protocol for 11ax
• 11-16/1010 Proposed functional requirements for 11az
• 11-16/1020 Security Enhancement to FTM
Main
meeting achievements:
•
Reviewed and approved a working draft Functional Requirement
Doc based on functional requirements motioned during the May meeting.
•
Reviewed 2 submissions on channel sounding mechanisms based
on 11ax infrastructure.
•
Reviewed proposal for secured ranging protocol based on the
REVmc FTM
•
Reviewed proposal for functional requirements changes.
Teleconferences:
•
Sep. 7th 10:00 ET for 1hr.
Sep. 2016 plans
•
Continue on Functional Requirement Document development.
•
Approve initial submissions of technical material towards
SFD text where FRD is sufficiently mature.
•
Review technical submissions on channel models, proposed
technical protocols and technical approaches and such.
Timeline
•
Reviewed timelines, and identified schedule slip. Hard to
evaluate and update impact to overall program as progress during this session
was limited.
•
Group made aware of this, and once progress is made
timelines to be reevaluated.
•
Last approved TG timelines:
Leadership:
· Chair Jonathan Segev
· Vice chair Carlos Aldana
· Technical Editor Chao-Chun Wang
Group met during the following sessions:
MON |
TUE |
WED |
THU |
FRI |
|
AM1 |
|||||
AM2 |
|||||
PM1 |
NGP |
||||
PM2 |
NGP |
||||
Eve |
Main
documents reviewed
· 11-16/492 Agenda document
· 11-16/508 May closing report
· 11-16/441 SFD template
· 11-16/424 TGaz Functional Requirements Document working draft
· 11-16/137 TG approved Use Case document
· 11-16/507 Approved TGaz March meeting minutes
· 11-16-595 Proposed functional requirements for network based positioning
· 11-16-593 11ax derived functional requirements
· 11-16-448 functional requirements for scalability
· 11-16-594 11az positioning protocol
· 11-16-579 Functional requirements for 802.11az
Main
meeting achievements:
•
Reviewed and approved a working draft Functional Requirement
Doc.
•
Motioned total of 17 functional requirements on
accuracy/coverage and scalability sections.
•
Review and commit to an updated project timelines (no change
to major milestones).
•
TG re-affirmed leadership – no change.
Teleconferences:
•
June 15th 10:00 ET for 1hr.
June 2016 plans
•
Continue on Functional Requirement Document development.
•
Approve initial submissions of technical material towards
SFD text where FRD is sufficiently mature.
•
Review technical submissions on channel models, proposed
technical protocols and technical approaches and such
•
Evaluate TG timelines and alignment to current TG POR.
Timeline
·
During the meeting TGaz reviewed the progress and alignment
to the timelines (no change to major milestones):
Leadership:
· Chair Jonathan Segev
· Vice chair Carlos Aldana
· Technical Editor Chao-Chun Wang
Group met during the following sessions:
MON |
TUE |
WED |
THU |
FRI |
|
AM1 |
|||||
AM2 |
|||||
PM1 |
NGP |
NGP |
|||
PM2 |
NGP |
||||
Eve |
Main documents
· 11-16/218 Agenda document
· 11-16/479 March closing report
· 11-16/441 SRD template
· 11-16/424 TGaz Functional Requirements Document working draft
· 11-16/137 TG approved Use Case document
· 11-16/213 Approved TGaz Jan. meeting minutes
Main meeting achievements:
•
First working draft of the Functional Requirements Document
working draft approved by TG.
•
Spec Framework Document template approved by TG.
•
Approved two additional batches of functional requirements:
o
1st batch of scalable location protocol for the
2.4Ghz and 5Ghz bands.
o
2nd batch of functional requirements for the
60Ghz band.
•
Agreed to freeze use-case document.
Teleconferences:
•
May. 4th 10:00 ET for 1hr.
May 2016 plans
•
Continue on Functional Requirement Document development.
•
Approve initial submissions of technical material towards
SFD text where FRD is sufficiently mature.
•
Review technical submissions on channel models, proposed
technical approaches etc.
•
Call for submission for the FRD and SFD to be issued post
this meeting.
Timeline
·
During the meeting TGaz reviewed the progress and alignment
to the timelines:
Leadership:
· Chair Jonathan Segev
· Vice chair Carlos Aldana
· Technical Editor Chao-Chun Wang
Group met during the following sessions:
MON |
TUE |
WED |
THU |
FRI |
|
AM1 |
|||||
AM2 |
|||||
PM1 |
NGP |
||||
PM2 |
NGP |
||||
Eve |
Main documents
· 11-15/1466 Agenda document
· 11-15/1467 Jan. closing report
· 11-16-137 TG approved Use Case document
· 11-15-1470 Approved TGaz Nov. meeting minutes
· 11-16-213 Draft TGaz Jan. meeting minutes
Main meeting achievements:
•
Use case document completed and motioned.
•
Initiated the functional requirements document and approved
accuracy/coverage and millimeteric wave positioning requirements.
•
Entertained SFD and Technical editor and FRD editor
elections, Chao-Chun Wang (MediaTek) and Allan Zhu (Huawei), respectively,
elected for these positions.
Teleconferences:
•
Feb. 2nd 10:00 ET for 1hr.
Mar. 2016 plans
•
Continue Functional Requirement Document.
•
Continue review of technical submissions (performance
analysis, positioning techniques, challenges etc.) as needed.
Timeline
·
During the meeting TGaz reviewed the progress and alignment
to the timelines:
Leadership:
· Chair Jonathan Segev
· Vice chair Carlos Aldana
· Secretary Zhou Lan
Group met during the following sessions:
MON |
TUE |
WED |
THU |
FRI |
|
AM1 |
|||||
AM2 |
|||||
PM1 |
NGP |
NGP |
|||
PM2 |
NGP |
||||
Eve |
Main documents
Main meeting achievements:
•
Reviewed and approved new baseline use case document.
•
Continued development of use case document.
•
Continued review of technical submissions.
•
Entertained vice chair elections.
Teleconferences:
•
Dec. 2nd 10:00 ET for 1hr.
Jan. 2016 plans
Timeline
·
During the meeting TGaz reviewed the progress and alignment
to the timelines:
Pro-tem chair Jonathan Segev
Pro-tem secretary Zhou Lan
Group met during the following sessions:
MON |
TUE |
WED |
THU |
FRI |
|
AM1 |
NGP |
||||
AM2 |
NGP |
||||
PM1 |
|||||
PM2 |
NGP |
||||
Eve |
Main documents
Main meeting achievements:
•
Reviewed, discussed and agreed on documentation and
development process towards the development of draft amendment.
•
Reviewed discussed and approved initial timelines.
•
Adopted NGP SG working draft use case document and continued
development of use case document.
•
Responded to liaison from ATIS (Association for
Telecommunication and Industry Solutions).
•
Developed TG chair recommendation for WG chair approval.
Teleconferences:
•
No teleconference scheduled.
Nov. 2015 plans
Timeline
·
During the meeting TGaz agreed on the following initial
timeline and development process:
USEFUL LINKS TO OTHER SITES:
IEEE P802.11 WLANs RELATED
OTHER SITES
This page is maintained by Jonathan Segev. Comments are welcome.