Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
--- This message came from the IEEE 802.11 Editors' Reflector ---
Hi Peter and all, During 11bd meeting, we discussed on MDR process and 11bd timeline as below. Our plan is to run the motion to resolve all the comments and generate IEEE P802.11bd D3.0 which would be the draft to perform MDR. As for 11bd D3.0, my plan is to publish it until the end of November as much as possible. Then do you think the remaining time is enough for MRD process before entering the initial SA ballot on Mar 2022? Would you share the general timeline for MDR report? Regards, Yujin From: *** IEEE stds-802-11-editors List *** <STDS-802-11-EDITORS@xxxxxxxx>
On Behalf Of Peter Ecclesine **BE CAUTIOUS**
THIS EMAIL ORIGINATED FROM OUTSIDE SENSCOMM. DO
NOT CLICK ANY LINKS OR OPEN ATTACHMENTS UNLESS YOU RECONGNIZE THE SENDER AND KNOW THE CONTENTS ARE SAFE. ALSO BE CAUTIOUS WHEN ‘REPLYING TO ALL’. --- This message came from the IEEE 802.11 Editors' Reflector ---
Hi All, The November Editors meeting will kickoff the Mandatory Draft Review for 802.11bd D2.1 If there are learnings from recent 11me or 11be pratice, we will discuss them.
Please unicast draft status updates so our slide at closing plenary is correct.
Thanks in advance, petere -- Peter Ecclesine "Time doesn't fool around" "Without Prejudice" U.C.C. 1-308 To unsubscribe from the STDS-802-11-EDITORS list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-EDITORS&A=1 To unsubscribe from the STDS-802-11-EDITORS list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-EDITORS&A=1 |