Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
05-Nov-2017 ET |
2017 |
1697 |
0 |
TGba |
Power save scheme with fast medium sync |
Ming Gan (Huawei) |
Pending |
03-Nov-2017 ET |
2017 |
1652 |
1 |
TGba |
WUR operation of WUR |
Suhwook Kim (LG) |
Pending |
31-Oct-2017 ET |
2017 |
1629 |
0 |
TGba |
WUR Frame Authentication |
Po-Kai Huang (Intel) |
Pending |
31-Oct-2017 ET |
2017 |
1628 |
0 |
TGba |
Operation after Unicast Wake-up Frame Transmission |
Po-Kai Huang (Intel) |
Pending |
05-Sep-2017 ET |
2017 |
1353 |
0 |
TGba |
Multi-user wake-up frame |
Jeongki Kim (LG Electronics) |
Pending |
13-Mar-2017 ET |
2017 |
439 |
0 |
TGba |
BSS management through WUR wakeup frame |
Liwen Chu (Marvell) |
Pending |
13-Mar-2017 ET |
2017 |
438 |
0 |
TGba |
BSS management through WUR wakeup frame |
Liwen Chu (Marvell) |
Pending |