Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Hi Sigurd and Tianyu, When I read the SP results (SP5_0406.txt) requested and forwarded by my colleague, I find the text for SP5 is not exactly what was shown in your slides. The SP 5 in the txt doc is: 1. [20/0545r0] Do you agree that the following indication should be the same considering symbol alignment within each segment from PHY point of view if the fields are present in U-SIG - Number of EHT-SIG symbols - GI+EHT-LTF Size - Number of EHT-LTF symbols - PE related parameters should be the same Whilst I think the text in your slides when you update during the call is: 1. [20/0545r0] Do you agree that the following indication
- Number of EHT-SIG symbols - GI+EHT-LTF Size - Number of EHT-LTF symbols - PE related parameters Do you have the meeting minutes? Could you clarify it? regards 于健 Ross Yu Huawei Technologies To unsubscribe from the STDS-802-11-TGBE list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBE&A=1 |