Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Hi Yonggang, Thanks for the review. I provide my response in the attachment. Best, Po-Kai From: Yonggang Fang <yfang@xxxxxxxxx> Hi Po-Kai, Thanks for the preparation. Attached is my comments and questions. Best Regards Yonggang Fang ZTE (TX)
Original Mail Sender: Huang,Po-kai <po-kai.huang@xxxxxxxxx> Date: 2020/08/26 15:49 Subject: [STDS-802-11-TGBE] PDT-MAC-MLO: General and Multi-link setup: Procedure Dear all, The proposed spec texts for agreements in MLO-General and MLO-Multi-link setup: Procedure is uploaded. Please take a look and let me know if you have further comments. Best, Po-Kai To unsubscribe from the STDS-802-11-TGBE list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBE&A=1 To unsubscribe from the STDS-802-11-TGBE list, click the following link:
https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBE&A=1 To unsubscribe from the STDS-802-11-TGBE list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBE&A=1 |
Attachment:
11-20-1309-00-00be-proposed-draft-specification-for-ml-general-mld-authentication-mld-association-and-ml-setup-YG_response to YG.docx
Description: 11-20-1309-00-00be-proposed-draft-specification-for-ml-general-mld-authentication-mld-association-and-ml-setup-YG_response to YG.docx