Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
All, Since the last meeting ran right up to the end time, we left things with this last Straw Poll result: “Which of the following can you support in concept (perhaps after some technical clean-up) for inclusion into TGbh?”
I propose that we either:
OR
Then, I will claim that we have completed the down-select process, as it was defined at the start, (“Stop when there’s one left, or when a few (2-3?) have 75% support”). So, the next step is to see if there are any specific technical comments/clean-up needed on the [e-]RRCM proposal, and prepare to hold a motion to add it to the current draft. @Mutgan, Okan (NSB - CN/Shanghai), Jay @Yang, Zhijie (NSB - CN/Shanghai): Would you please suggest which of the options above you would like to advance? @All, does anyone have specific technical comments ready/in mind for this/these proposals? How much time do we need to get this ready for inclusion into the Draft? Thanks. Mark To unsubscribe from the STDS-802-11-TGBH list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBH&A=1 |