| Thread Links | Date Links | ||||
|---|---|---|---|---|---|
| Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
EPP epoch sequences have a finite length determined by the Epochs Remaining field included in the EPP Epoch Settings field. The EPP AP MLD may advertise the epochs available in the MLD through an EPP Groups Parameter frame before the end of the EPP epoch sequence for all EPP groups. The non-AP MLD may request to join or create a new EPP group (through an EPP Group Request frame) or the AP MLD shall assign the non-AP MLDs of an EPP group which EPP epoch sequence is ending to a group with similar parameters (through an EPP Group Assignment frame), before the EPP epoch sequence ends.
Dear allWe need to define the behaviour when an epoch finishes and the non-AP MLD does not receive a new configuration. My take is that it should go into the default epoch. If this is the choice, then we should define that the AP must always send new epoch configuration at least for the default epoch before it finishes its sequence.Any other idea?Thanks
To unsubscribe from the STDS-802-11-TGBI list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBI&A=1