Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Alfred,I retract my earlier statement - there will be no r5 as there have been no comments regarding r4.So please ensure that the PDT queue includes 11-24-1762r4The r4 version of the document was uploaded at: 27-Nov-2024 17:20:36 ET.On Tue, Dec 3, 2024 at 10:03 AM Cariou, Laurent <laurent.cariou@xxxxxxxxx> wrote:Hi Alfred,
24/2040 for PDT MAC Coexistence.
Plan to upload later today.
Thanks
Laurent
From: Ron Porat <000009a0da80e877-dmarc-request@xxxxxxxxxxxxxxxxx>
Sent: Tuesday, December 3, 2024 6:24 PM
To: STDS-802-11-TGBN@xxxxxxxxxxxxxxxxx
Subject: Re: [STDS-802-11-TGBN] Deadline Reminder for PDTs: Action Required from POCs
Hi Alfred,
I would like to run below SP from 24/1826. Could you please add the them to the PHY telecon. agenda?
SP#2:
Do you agree to add to the 11bn SFD?
The first 16 entries of the 5 bit MCS table (MCS0 to MCS15) are identical to 11be
SP#3:
Do you agree to add to the 11bn SFD?
In the 5bit MCS table
MCS17 signals QPSK rate 2/3
MCS19 signals 16QAM rate 2/3
MCS20 signals 16QAM rate 5/6
MCS23 signals 256QAM rate 2/3
Thanks,
Ron
From: Dongguk Lim <dongguk.lim@xxxxxxx>
Sent: Monday, December 2, 2024 9:17 PM
To: STDS-802-11-TGBN@xxxxxxxxxxxxxxxxx
Subject: Re: [STDS-802-11-TGBN] Deadline Reminder for PDTs: Action Required from POCs
Hi Alfred,
I would like to run the deferred SPs in the previous F2F meeting.
Could you add the following SPs to 11bn PHY agenda?
And I think it would be good to add before You-Wei's SP.
SP1
Do you agree to change the assigned bits for NSS field and Spatial configuration field by considering the maximum NSS is 8 in 11bn?
For non-MU-MIMO allocation of the UHR SIG field
NSS field consists of 3 bits in the user field
For MU-MIMO allocation of the UHR SIG field
Spatial configuration field consists of 4 bits in the user field.
SP2
Do you agree to include the following text to the 11bn SFD?
The MCS field in the user field of UHR-SIG field consists of 5 bits.
The B11 ~ B15 of the UHR-SIG field is assigned for the MCS field
The configuration of MCS field is TBD.
Supporting documents: [24/1427r2]
Best regards,
Dongguk.
From: Alfred Asterjadhi [mailto:asterjadhi@xxxxxxxxx]
Sent: Tuesday, December 3, 2024 2:18 AM
To: STDS-802-11-TGBN@xxxxxxxxxxxxxxxxx
Subject: [STDS-802-11-TGBN] Deadline Reminder for PDTs: Action Required from POCs
Hello all,
I hope you had an enjoyable holiday.
I would like to remind the POCs of the following deadline:
For PDT submissions: I would like to ask/remind the following to POCs (you can find your name in the PDT queue) that are preparing the main skeleton (and spec text for the topic) of the sub clauses pertaining to that topic and uploading the base document to the mentor website:
• For ease of identification, all draft text documents need to begin with "PDT-" for "Proposed Draft Text, and the topic classification (MAC/PHY/JOINT)" (e.g. 11-24-9999-00bn-PDT-MAC-This-Feature).
• Start a thread in the TGbn reflector for that topic, which is the point of reference for having discussions and exchanging feedback with other members.
• Again, for ease of identification, the thread should start with [PDT-MAC/PHY/JOINT]
• Send me an e-mail with the PDT title, document number, and an estimated time of upload, so that I can populate the PDT queues. E-mail to be sent no later than December 2nd, 2024.
Regards,
Alfred
On Fri, Nov 22, 2024 at 12:10 PM Alfred Asterjadhi <asterjadhi@xxxxxxxxx> wrote:
Hello all,
The proposed telco agendas for Nov'24 to Jan'25 is uploaded. This revision contains the most up to date queue contents and received requests until November 22, 2024.
You will notice that the agenda time will be split into three parts (with timing allocation that will be determined dynamically subject to contributions availabilities).
- PDT Submissions
- Running SPs
- Technical Submissions
For PDT submissions: I would like to ask/remind the following to POCs (you can find your name in the PDT queue) that are preparing the main skeleton (and spec text for the topic) of the sub clauses pertaining to that topic and uploading the base document to the mentor website:
• For ease of identification, all draft text documents need to begin with "PDT-" for "Proposed Draft Text, and the topic classification (MAC/PHY/JOINT)" (e.g. 11-24-9999-00bn-PDT-MAC-This-Feature).
• Start a thread in the TGbn reflector for that topic, which is the point of reference for having discussions and exchanging feedback with other members.
• Again, for ease of identification, the thread should start with [PDT-MAC/PHY/JOINT]
• Send me an e-mail with the PDT title, document number, and an estimated time of upload, so that I can populate the PDT queues. E-mail to be sent no later than December 2nd, 2024.
For SP queue: Please send me requests following the usual routine, namely SP text, topic, and supporting list, and session.
For Technical Submissions queues, please see below.
Please let me know if I missed anything from the queues (ported from the F2F november queues), such as missing contribution, wrong topic classification, missing links, etc.
Please note that queue ordering and agendas are organized following the usual routines:
- Submissions ordered per-DCN, and distribution is on a per-topic basis
- Sunday (start of each F2F) deadline used to determine the cut-offs.Note that as a side effect of merging two previous cut-offs into one queue there is a shift in the DCN order appearances. Similarly the same has happened when a DCN was in one cut-off, was deferred and then asked to be added back to the queue (as part of the subsequent cut-off).
As we prepare for these telcos, please take notice/act on the following:
1) Check that the presentations are properly classified and that they are uploaded to the server as soon as possible and no later than 24 hours prior to the scheduled meeting. Presentations that are not uploaded in time will be removed from the queues, and will lose their current priority (i.e., will be added as part of the ongoing cut-off).
2) Some topics have a lot of contributions (in particular in MAC) and from the title of these contributions they seem to discuss similar concepts/issues. If your contribution falls in this category then please check with the other members if there is room for harmonization/consolidation (co-authoring, harmonized SPs, etc).
3) In order to discuss as many MAC contributions as possible during the telcos, the time allocated per presentation will be limited to 15-20 mins (5 extra minutes available if the member wants to run an SP). So please make sure that you present your contribution within this time limit and that you leave enough time for any Q&As during the teleconference call. If no time is left for Q&As after your presentation then the TGbn reflector is a great tool to seek feedback from members.
Let me know if you have any questions and enjoy the holidays.
Regards,
Alfred
--
Alfred Asterjadhi, PhD
IEEE802.11 TGbe/TGbn Chair,
Qualcomm Technologies Inc.
Cell #: +1 858 263 9445
Office #: +1 858 658 5302
--
Alfred Asterjadhi, PhD
IEEE802.11 TGbe/TGbn Chair,
Qualcomm Technologies Inc.
Cell #: +1 858 263 9445
Office #: +1 858 658 5302
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1
---------------------------------------------------------------------
Intel Corporation SAS (French simplified joint stock company)
Registered headquarters: 90-92 route de la Reine, 92100 Boulogne, France
Registration Number: 302 456 199 R.C.S. NANTERRE
Capital: 5 208 026.16 EurosThis e-mail and any attachments may contain confidential material for
the sole use of the intended recipient(s). Any review or distribution
by others is strictly prohibited. If you are not the intended
recipient, please contact the sender and delete all copies.
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1
--Matthew Fischer
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1