Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Signaling design for MU MIMO User field in UHR-SIG field as shown in the below figure.
Signaling design for non-MU MIMO User field in UHR-SIG field as shown in the below figure.
Hi Alfred,
Please help add the following to the TGbn PHY motion list:
Motion 1: Move to include the following text to the 11bn SFD (DCN# 12-24/1381r2, DCN# 11-24/1840r0):
- Keep other fields except the disregard bits in Common field for non-OFDMA transmission in UHR-SIG to be the same as that in common field for non-OFDMA transmission in EHT-SIG as following.
B0-B3
B4-B5
B6-B8
B9
B10-B11
B12
B13-B15
B16-B18
Spatial Reuse
GI+LTF Size
Number of UHR-LTF Symbols
LDPC Extra Symbol Segment
Pre-FEC padding Factor
PE Disambiguity
Disregard
Number of non-OFDMA Users
Result: no objection
Motion 2: Move to include the following text to the 11bn SFD (DCN# 12-24/1381r2):
- Keep the Common field format of UHR-SIG for OFDMA transmission adheres to the Table 36-33 of 11be D7.0
Note: The entries defined for OFDMA + MU-MIMO in RU Allocation table may be updated
Common field for OFDMA transmission
B0-B3
B4-B5
B6-B8
B9
B10-B11
B12
B13-B16
B17-B16+9N
B17+9N-B20+9N
B21+9N-B26+9N
B27+9N-B26+9N+9M
B27+9N+9M-B30+9N+9M
B31+9N+9M-B36+9N+9M
Spatial Reuse
GI+LTF Size
Number of UHR-LTF Symbols
LDPC Extra Symbol Segment
Pre-FEC padding Factor
PE Disambiguity
Disregard
RU Allocation-A
CRC
Tail
RU Allocation-B
CRC
Tail
Result: no objection
Thanks,
Juan
From: Alfred Asterjadhi <asterjadhi@xxxxxxxxx>
Sent: Tuesday, December 3, 2024 3:00 PM
To: STDS-802-11-TGBN@xxxxxxxxxxxxxxxxx
Subject: [STDS-802-11-TGBN] Motions List for December 19th
Hello all,
This is a gentle reminder to send me (including the reflector) an e-mail with a list of candidate motions for December 19th. The deadline for these requests is Decemeber 7th.
I am providing below the announcement i made during yesterday's Joint Telco:
· We have motions scheduled during the Joint telco of December 19th, 2024.
§ We need to get WG approval and send a 10-day advanced notice for the motions that we plan to run during that session.
§ To meet this requirement and align with our MO, I need by Dec 7th, 2024:
· Members that have SPs with “super majority” positive opinion (75+%) to send me the text of that SP so that I can add to the motion list
· Members that have SPs that are queued to be ran before/during December 19th, 2024, to send me the text of that SP so that I can add to the motion list
· If the SP shows “super majority” (75+%) positive opinion prior to the scheduled motion, then we keep the corresponding motion and update the note below the motion with the SP result
· If the SP does not show “super majority” positive opinion prior to the scheduled motion or is not ran, then we will remove the corresponding motion from the motion list.
· Note: Text changes to the motion text during this 10-day period is fine as long as it does not lead to major technical changes to the motion.
§ Per procedure, other motions are allowed to be requested as well provided that they are sent by Dec 7th, 2024, and they are approved by the WG chair.
Regards,
AA
--
Alfred Asterjadhi, PhD
IEEE802.11 TGbe/TGbn Chair,
Qualcomm Technologies Inc.
Cell #: +1 858 263 9445
Office #: +1 858 658 5302
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1
To unsubscribe from the STDS-802-11-TGBN list, click the following link: https://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-TGBN&A=1