Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[STDS-802-11] Adjusted results for LB#189



--- This message came from the IEEE 802.11 Working Group Reflector ---

802.11 WG Members,

This email contains a small adjustment to the results for working group ballot #189. We determined that 3 disapprove votes had been improperly recorded and the results shown below are adjusted accordingly.  The motion still passes but there is a slight drop in approval % and 13 additional  comments.

- - - - - - - - - - - - - - - - - -  - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

IEEE 802.11 WG Letter Ballot #189  was the initial  30 day Working Group Technical Ballot
asking the question "Should P802.11af D2.0 be forwarded to Sponsor Ballot?"   The Official results follow: 

Ballot Opening Date:   Friday              July  20, 2012 - 23:59 ET
Ballot Closing Date:     Sunday            August 19, 2011 - 23:59 ET 

RESPONSES:

300 eligible people are in this ballot group.
   
163 affirmative votes 
  43 negative votes  

    1 negative votes without comments

  14 abstention votes

===  
221  votes received  =  73.7% valid returns
                                     =    6.3% valid abstentions

 

This ballot has met the 50% returned ballot requirement

This ballot has met the less than 30% abstention requirement

 
APPROVAL RATE:
163  affirmative votes       =      79.1 % affirmative
  40  valid negative votes  =      20.9 % negative

The 75% affirmation requirement has been met,

Motion Passes.

There were 998 comments received.                                               

Regards,
Bruce Kraemer

Chair WG11

 

A.       Ballot Approval criteria are defined by:

At least 50% return from voting members

75% approval (calculated using only “Approve” & “Do Not Approve” votes.

 

B. IEEE Project 802 LMSC Working Group Policies and Procedures, as approved by LMSC March 17, 2012 – Last Edited June 04th, 2012 -  section 9. 

http://www.ieee802.org/PNP/2012-03/IEEE_802_LMSC_WG_PandP_approved_120604.pdf

9.6 Actions Requiring an Electronic Ballot

Approval to forward a draft standard to the Sponsor shall require approval by a WG Electronic Ballot. Abstains shall require a reason be given, and Do Not Approve votes shall require comments on changes required to modify the vote to Approve. For a letter ballot on a draft standard to be valid a majority of all the voting members of the WG must have responded Approve, Do Not Approve, or Abstain. Comment resolution, recirculations, etc should be consistent with Sponsor ballot rules and 5.4.3.2 of the IEEE-SA Standards Board Operations Manual (SASB OM) [refs2].

The response time for a WG LB on a draft shall be at least thirty days. However, for recirculation ballots the response time shall be at least fifteen days.

 

_______________________________________________________________________________

If you wish to be removed from this reflector, do not send your request to this reflector - it will have no effect.

Instead, go to http://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11 and then press the LEAVE button.

If there is no LEAVE button here, try http://listserv.ieee.org/cgi-bin/wa?SUBED1=STDS-802-11-RO.

Further information can be found at: http://www.ieee802.org/11/Email_Subscribe.html _______________________________________________________________________________