Dear Peiying Zhu and all colleague of
PREAMBLE ad-hoc;
In the list of issues raised and
contributions rejected in Portland meeting,
my contribution C80216e-04/215r1 "Reference
Signals for Fast Timing Synchronization in OFDMA" was omitted.
This contribution is related to preamble
synchronization procedure, i.e., related to the issue "Enable fast cell
search".
I would like to discuss the
contribution in the ad-hoc.
Thank you.
Best Regards,
Bin-Chul Ihm
----- Original Message -----
Sent: Saturday, July 17, 2004 1:14 PM
Subject: [STDS-802-16] [PREAMBLE] Preamble
Ad-Hoc group
Dear all:
A preamble ad-hoc group was formed within 802.16e
as agreed in Portland meeting. This group is tasked to consolidate all the
preamble issues raised and related contributions into a single set of preamble
proposals to be submitted during the ballot recirculation. The ad-hoc group
will follow the recirculation process, hence must finish harmonized
contribution before the Aug. 15th deadline.
Given that we
have an extremely aggressive timeline, we need to follow some process going
forward. The following is my suggestion, your feedback is welcomed.
- Email discussions will use the
802-16-MOBILE reflector with prefix [PREAMBLE].
- Regular conference calls proposed on the
following dates (90 min each):
Tuesday,
July 27
Tuesday, Aug 3
Tuesday, Aug 10
Friday, Aug 15 (if needed)
Proposed time: 8 AM - 9:30
AM US Pacific time (the same time slot used by Jose, seems ok by most
people). If I do not hear any objections to these dates/times, I will go ahead
and setup call logistics and publish the information by July 26.
- Milestones - I propose the following milestones
to keep us on track:
July 19- July
27: Discussions on the requirements and issues to be addressed. Discussion on
possible harmonization based on the following list of contributions rejected
in Portland. Any new contributions must be submitted before this date for the
consideration.
July 27-Aug 3: Consolidate contributions to form
one harmonized version
Aug 3 - Aug 10: Update the harmonized version
before Aug. 15 deadline
Aug 15 - Aug 23: respond to reply comments if
needed
To start the conversion, here is the list of issues raised and
contributions rejected in Portland meeting.
Issues raised:
- Backward compatibility
- Low PAPR
- Enable channel estimation
- Enable fast cell search
Contributions:
C80216e-04_115r2 Fast cell search for
OFDMA
C80216e-04_125 Preambles design for OFDMA PHY
layer, FFT sizes of 1024,512 and
128
C80216e-04_164r1
Preamble sequence for supporting scalable FFT
C80216e-04_188r1 Preamble of scalable OFDMA supporting MIMO
system
C80216e-04_192 Preamble design to
enhance MIMO support
Hope to see a fruitful discussion on this
reflector.
Regards
Peiying
Zhu
Preamble ad-hoc group Chair