Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [STDS-802-16] [MMR-AH-UM] Announcing 6/22/06 Meeting of Multihop Relay Usage Model Ad Hoc Group



Dear Jen-Shun and all,

 

In the discussions during the last two meetings, we agreed that in the document we would not discuss solutions such as cooperative transmission or discuss whether routes are used simultaneously. The diagram shows that given the topologies possible in the usage models captured in the document, multiple stations can be within communication range and can potentially communicate along multiple paths. I don’t think that its necessary to change the lines to dotted lines because this moves toward specifying a solution where one of the links is used as a primary and the other as a backup.  

 

Best Regards,

Jerry Sydir

 


From: jsyang@itri.org.tw [mailto:jsyang@itri.org.tw]
Sent: Tuesday, June 20, 2006 7:16 PM
To: Sydir, Jerry
Cc: STDS-802-16@listserv.ieee.org
Subject: Re: [STDS-802-16] [MMR-AH-UM] Announcing 6/22/06 Meeting of Multihop Relay Usage Model Ad Hoc Group

 


Dear Jerry,

           I got two questions about section 5.

1. Are the MS2 and MS3 in Figure 4 describing the cooperative transmission or the asymmetric routes of uplink and downlink or both? If they are just meant to the asymmetric routes of uplink and downlink, I would suggest that you may change the line of one accee link of MS2 and MS3 to be a dot-line.

2. Does the multiple routing path between MMR-BS and RS4 been used simultaneously? If they are not been used simultaneously, I would suggest that you may change the line of one access link of RS4 to be a dot-line, otherwise the figure 4 is not a "tree-like" topology.

Best Regards,


Jen-Shun Yang (Tonny Yang)
ITRI/ICL
TEL: +886-3-5914616
email: jsyang@itri.org.tw




 

 

 

 

"Sydir, Jerry" <jerry.sydir@INTEL.COM> -

2006/06/16 06:02 AM
請回信 "Sydir, Jerry"

       
        收件人:        STDS-802-16@listserv.ieee.org,
        副本抄送:        ,
        主旨:        [STDS-802-16] [MMR-AH-UM] Announcing 6/22/06 Meeting of Multihop Relay Usage Model Ad Hoc Group




Dear Ad Hoc participants,
 
The next meeting of the Multihop Relay Usage Model Ad Hoc Group will occur on Thursday June 22, 06:00 – 07:45 PDT (13:00 – 15:00 UTC). (Note that we will finish 15 minutes earlier due to conflicts).
 
The bridge for the meeting is 916-356-2663, Bridge: 2, Passcode: 3578218
 
I have updated the draft to include modifications to the outline that we agreed to in the June 15 meeting. It can be found in the following location:  http://dot16.org/CSUpload//upload/temp_db/C80216j%2d06_UMAHtemp_r4.doc
 
Please review the changes to make sure they are consistent with what we decided.
 
The main topics planned for the meeting are:
-          Go over any issues identified in the current version of the document
-          Discuss the new usage model proposal put forth by Matt Sherman (Matt will upload updated version prior to the meeting
 
Please send comments and issues that we need to discuss to the mail list prior to Wednesday June 14 8 AM PDT. I will send out a detailed agenda for the meeting on Wendesday.
 
Regards,
Jerry Sydir
 
 

本信件可能包含工研院機密資訊,非指定之收件者,請勿使用或揭露本信件內容,並請銷毀此信件。
This email may contain confidential information. Please do not use or disclose it in any way and delete it if you are not the intended recipient.