Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear 802.16 M2M fans, The updated M2M Study Report Draft with Usage Models section
consolidated with the input contributions has been posted to the PPC upload
folder. http://dot16.org/ul//upload/ppc_db/80216ppc-10_0002r1.doc
Thanks to HanGyu our technical editor for preparing these
updates. Also Agenda for CC#2 will be Architecture & Requirements
& Usage Model Completion There is also a request to move the CC#2 to a more Asia friendly
time slot, because presently it will be 2-4AM in India and also not friendly
times in East Asia. So the plan is to move it to the same timeslot as CC#3 7-9AM
Pacific time. So will have 2 timeslots each with the same time. Also I have
move the date because of the late notice for 13th and give people
enough time to adjust. I considering moving it to April 15th 7-9AM Pacific
time. Please await my confirmation on this soon. Thanks & best regards, jose From: HanGyu Cho
[mailto:hg.cho@lge.com] Here is updated CC plan for #CC 1. BR, HanGyu (M2M Study Report Technical Editor) From: Puthenkulam, Jose P
[mailto:jose.p.puthenkulam@INTEL.COM] Dear 802.16 M2M Fans, I’ve uploaded the Conference call plans and agenda details
on the upload server in the PPC folder Thanks to HanGyu, our Study Report editor for the agenda
schedule suggestions. Thanks & Best regards, Jose (802.16 Project Planning Committee Chair) _____________________________________________ Dear
802.16 M2M Fans, Here
are the bridge numbers and times for the M2M Study Report and PAR development
Conf calls. 50 lines have been reserved. Tuesday, April 06, 2010, 08:30-10:30 PM US Pacific Time Agenda
details to follow. Thanks
& BR, Jose (802.16
Project Planning Committee Chair) __________________________________________________________ |