The meeting was hosted by Jay Klein of Ensemble Communications, which served as corporate host and absorbed the meeting costs.
The site was the:
Embassy Suites Hotel San Diego-La Jolla
4550 La Jolla Village Drive
San Diego, CA 92122 US
Tel: +1-858-453-0400
Fax: +1 858-453-4226
1-800-EMBASSY (1-800-362-2779)
Summary
This was a productive meeting and a lot of fun.
Jim Mollenauer has resigned as TG1 Technical Editor due to his new employment status. Roger Marks is acting in this capacity.
IEEE Standards Activities has assigned Andy Ickowicz as Project Editor for the TG1 draft. Andy's first task was to complete the incorporation of changes approved at Session #10; these changes had been delayed due to Jim's resignation. Andy began work before the session. He attended the session, working closely with the members. He agreed to complete the updates accepted at Session #10 by 15 December.
Changes Requested by TG3
A primary purpose of the session was to restructure the document in response to Document IEEE 802.16.3p-00/56 ("Using the TG1 MAC for TG3 Purposes: Report of the TG3 MAC Ad Hoc Group", by Vladimir Yanover, Subir Varma, and Huanchun Ye). Further input was provided in two contributions by Naftali Chayat and Vladimir Yanover:
TG1 has assigned Clause Editors to be responsible for the editing of specific section of the TG1 draft. These Editors are:
1 | Overview | Roger Marks |
2 | Normative References | Roger Marks |
3 | Definitions | Jose Costa |
4 | Abbreviations and Acronyms | Jose Costa |
5 | Service Specific Convergence Sublayers | - |
5.1 | ATM | Ken Stanwood |
5.2 | Ethernet | Glen Sater |
5.3 | IP | Carl Eklund |
6 | MAC Sublayer | - |
6.1 | MAC Service Definition | Ken Stanwood |
6.2 | Data/Control Plane | - |
6.2.1 | Message Formats | Glen Sater |
6.2.2 | Access Methods | Ken Stanwood |
6.2.3 | Network Entry | Juan Carlos Zuniga |
6.2.4 | Ranging | Ken Stanwood |
6.2.5 | Quality of Service | Glen Sater |
6.3 | Management Plane | Carl Eklund |
7 | Security Sublayer | Carl Eklund |
8 | Physical Layer | - |
8.1 | PHY SAP | Vladimir Yanover |
8.2 | Physical Layer Suitable for 10-66 GHz | Andy Schiltz & Jay Klein |
9 | Configuration File | Ian Baragar/Chris Tappenden |
10 | Parameters and Constants | Phil Guillemette |
11 | TLV Encodings | Sergio Licardie |
A | Functional Requirements | Roger Marks |
Figure Editor | Andy Schiltz |
Those with questions marks have been nominated by the Task Group but have not yet been informed of this interesting opportunity. In cases where a name appears more than once, there is an opportunity for new volunteers to step in. Please let me know if you would like to participate.
Minutes
Ron Meyer prepared minutes.
Acknowledgements
Thanks to Jay Klein for hosting a comfortable meeting and Ensemble Communications for generously serving as corporate host.