John,
Thanks.
Steve
From: John Barr
[mailto:john.barr@xxxxxxxxxxxx]
Sent: Monday, August 18, 2008 7:19
AM
To: Shellhammer, Steve;
STDS-802-19@xxxxxxxxxxxxxxxxx
Subject: Re: [802.19] IEEE 802.19
Conference Calls
I have uploaded https://mentor.ieee.org/802.11/file/08/11-08-0984-00-000n-bluetooth-test-cases-for-802-11n-40-mhz.ppt
For our call today. Format similar to that provided by Bruce.
Regards, John
On 7/22/08 2:59 PM, "Shellhammer, Steve"
<sshellha@xxxxxxxxxxxx> wrote:
All,
I have
scheduled two sets of 802.19 conference calls.
- 3650 MHz Coexistence
- 40 MHz 11n Coexistence
I have placed all the information about those conference calls on the 802.19
web site
http://ieee802.org/19/pub/calls.html
I made
the 3650 MHz calls biweekly as they have been in the past. I scheduled 3
weekly calls on the 40 MHz 11n since I wanted to agree on the test plan as soon
as possible to enable people to perform tests before the September Interim
meeting.
Regards,
Steve
--
John R. Barr (John.Barr@xxxxxxxxxxxx)
Director, Standards Realization - <http://www.motorola.com>
Vice Chairman of the Board, Bluetooth SIG - <http://www.bluetooth.org>
(847) 576-8706 (office) +1-847-962-5407 (mobile) (847) 576-6758 (FAX)