Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
All: I have a couple of comments on the minutes
from March 31st. Near the bottom of page 3 there is mention
of “…possible interaction with FCC”. Keep in mind that any IEEE 802 wireless interaction with the FCC
must go through 802.18. Also near the bottom of page 3 it says ”…
we should follow the deveoplement [sic] of FCC and provide comments to FCC if
possible.” The 15-day comment period opened on Monday, April 13th,
and runs through the 28th. Even if the comments of this group did
not have to go through 802.18, there is very little time remaining. The next
meeting of 802.18 is in Rich Kennedy Standards Manager Research In Motion mobile: (972) 207-3554 office: (972) 910-3448 From: Dear all: Attached is the minutes for 31/03/2009. I have uploaded it to mentor.ieee.org/802.19/ two weeks a ago. Regards. Haiguang This transmission (including any attachments) may contain confidential information, privileged material (including material protected by the solicitor-client or other applicable privileges), or constitute non-public information. Any use of this information by anyone other than the intended recipient is prohibited. If you have received this transmission in error, please immediately reply to the sender and delete this information from your system. Use, dissemination, distribution, or reproduction of this transmission by unintended recipients is not authorized and may be unlawful. |