Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Updated DRaft Requirements




802.21 Folks,

Please find attached updated draft technical requirements document. The
document has been updated based on the comments and submissions in the
July session in Portland. 

There have been problems with the IEEE mailing reflector, so not sure if
this is getting through.

Best Regards
-Vivek

21-04-0087-05-0000-Draft_Technical_ Requirements.ZIP