Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Hello Burak, During the May meeting an ad hoc was
created for addressing this topic. This teleconference is organized as part
of this ad hoc and is an opportunity for everyone in WG to participate. The WG teleconference schedule between two
meetings is generally published as part of the Closing Report. More teleconferences can be organized if
required. Please let me know if you need one. It’s always a good idea to give
enough advance notice of such teleconferences. I believe TAGs can organize
teleconferences between plenary and an interim meeting with a five day advance notice. Best Regards -Vivek From: Simsek, Burak
[mailto:Burak.Simsek@xxxxxxxxxxxxxxxxxxx] Hi Vivek, I am glad to have
this teleconference, which I think is a very important issue for 802.21. Thx
for this. However, can you
please tell the required procedure to organize a teleconference on similar
issues? Are you responsible for assigning those teleconferences and therefore
we should ask you first before organizing one or do we need to have an approval
from the working group? Best regards Burak Simsek From: Gupta, Vivek G
[mailto:vivek.g.gupta@xxxxxxxxx] The 802.21 Revision PAR was discussed in the May meeting. An updated version of the PAR is available as follows. http://mentor.ieee.org/802.21/dcn/09/21-09-0075-01-0000-802-21-revision-par.doc A teleconference is organized to discuss the PAR and next
steps. The details are as follows.
|