Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear
Study Group Members, The
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group will be meeting
Tuesday, May 24 and Wednesday, May 25, 2011 during the IEEE 802.3 Interim being
held in Incline Village, NV, USA. The
Study Group will be meeting all day Tuesday and Wednesday, and has a hard stop
at 5pm on Wednesday for travel plans. Please consider this when making your
travel arrangements. Registration and meeting details may be found at https://tools.sympose.com/event/laketahoe/.
You are strongly encouraged to make your reservations as soon as
possible. The deadline for advanced Web registration is 8PM EDT
April 22. The motion chartering the formation of the Study Group is as
follows
Move the IEEE 802.3 Working Group authorizes the formation of a
study group for “100GbE Electrical Backplane and Twinaxial Copper Cable
Assemblies.” The agenda for the meeting will be the study of 100 Gb/s
Backplanes and Copper Cable Assemblies. Presentations should address the
following areas: · Objectives for the Study Group · Refinement of Project Scope · 5 Criteria o Broad Market Potential o Economic Feasibility o Technical Feasibility o Distinct Identity o Compatibility Anyone
wishing to present, please provide the following information (per Procedure for
Presenters web page: http://www.ieee802.org/3/100GCU/public/presentproc.html)
Name
of presenter Title
of presentation Length
of time requested (this should include time for questions and answers) Brief
description of topic Presentations
should be kept to 20minutes in duration, excluding time for questions and
answers. Requests for presentation time greater than 20 minutes will be
considered on a case-by-case basis, and the requestor should contact the chair
prior to making the request to justify the additional time. Requests
for presentation time must be made two Fridays preceding the meeting. For
the May Interim meeting, requests for presentation time shall be made to me at jdambrosia@xxxxxxxx
and must be made by May13, 2011. The presenter shall e-mail a PDF,
soft-copy version of the presentation to me at jdambrosia@xxxxxxxx
by Tuesday of the week preceding the meeting. For the May Interim, presentations
must be submitted by May 17, 2011. As
a reminder, please make sure that all requests for presentations or submissions
of presentation material have no restrictive notices at the bottom of the
email. All such emails will be refused and requests / presentations will
not be acknowledged. All
individuals submitting presentations should review the Procedures for
Presenters Page http://www.ieee802.org/3/100GCU/public/presentproc.html
I
would greatly appreciate presenters reviewing their own presentations to verify
that they have followed the cited Presentation Style Guidelines. Also,
to support the web site search tool used by the IEEE P802.3 web site the
'Document Information' fields of the PDF file must be completed as follows: Title:
Title of presentation Author:
Name(s) of author(s) Subject:
100 Gb/s Backplane and Copper Cable Study Group As
a reminder to the group, we are a contribution driven organization.
It should not be assumed by anyone that work will just get done without
contributions to drive it. Areas not moving forward will be brought to
the attention of the Study Group for consideration on how to address.
. I
look forward to seeing everyone in Incline Village! Best
Regards, John
D’Ambrosia Chair,
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group Tel:
717.460.8535 Email
jdambrosia@xxxxxxxx |