Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear Study Group Participants – At the May Interim, the Study Group was successful in
reaching consensus on the objectives, PAR, and 5 Criteria responses. They
have been posted, and may be found at http://www.ieee802.org/3/100GCU/index.html. The
IEEE 802.3 100Gb/s Backplane and Copper Cable Study Group will be meeting on
Wednesday July 20, 2011 during the IEEE 802 Plenary being held in San
Francisco, CA, USA. The PAR, 5 Criteria and Objectives will be presented
to the IEEE 802.3 WG during the Thursday closing Plenary for approval. Please
consider this when making your travel arrangements. Registration
and meeting details may be found at http://ieee802.facetoface-events.com/session/70/page.
You are strongly encouraged to make your reservations as soon
as possible. Early Web Registration: Before 6PM Pacific Daylight Time
(PDT), Friday, June 17, 2011 (UTC: 1am Saturday, June 18, 2011) The agenda for the meeting will be to address any comments
against the draft PAR and 5 Criteria, which must be provided no later than 5pm
on Wednesday of the Plenary Session. I look forward to seeing everyone in San Francisco! Best Regards, John
D’Ambrosia Chair,
IEEE 802.3 100 Gb/s Backplane and Copper Cable Study Group Tel:
717.460.8535 Email
jdambrosia@xxxxxxxx |