Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

[802.3_100GCU] FW: [STDS-802-3] IEEE P802.3bj 100 Gb/s Operation over Backplanes and Copper Cables 1st IEEE 802.3 Working Group recirculation ballot results



Task Force participants,

The 1st IEEE 802.3 Working Group recirculation ballot on the Amendment IEEE P802.3bj 100 Gb/s Operation over Backplanes and Copper Cables closed successfully on June 27. The results of the ballot are included below.

A total of 151 comments were received during the ballot. An additional 3 comments were received after the close of the ballot. Reports of the comments received, one sorted by Clause and the other by comment ID, may be found at the following link.

< http://www.ieee802.org/3/bj/comments/index.html >

If you submitted comments against the draft, please review these reports to ensure your comments have been included in the database correctly. Please contact me to report any discrepancies.

The following page will be updated with the agenda and presentations as they become available.

< http://www.ieee802.org/3/bj/public/jul13/index.html >

Please recall that requests for presentation time are due Friday July 5. The call for presentations may be found at the following link. When you submit your request for presentation time, please indicate which comment(s) the presentation will address.

< http://www.ieee802.org/3/100GCU/email/msg00643.html >

Best regards,

Adam Healey
Chair, IEEE P802.3bj 100 Gb/s Backplane and Copper Cable Task Force 
Secretary, IEEE 802.3 Ethernet Working Group


-----Original Message-----
From: Law, David [mailto:dlaw@xxxxxx] 
Sent: Tuesday, July 02, 2013 11:51 AM
To: STDS-802-3@xxxxxxxxxxxxxxxxx
Subject: [STDS-802-3] IEEE P802.3bj 100 Gb/s Operation over Backplanes and Copper Cables 1st IEEE 802.3 Working Group recirculation ballot results

Dear Colleagues,

The 1st IEEE 802.3 Working Group recirculation ballot on the Amendment IEEE P802.3bj 100 Gb/s Operation over Backplanes and Copper Cables closed successfully on 27th June 2013. The ballot exceeded the required 75% for consensus to approve the draft. The July 2013 IEEE P802.3bj Task Force plenary week meeting <http://www.ieee802.org/3/interims/index.html> will consider the 154 comments submitted and determine changes to the draft as appropriate. The availability of the comment database will be announced on the IEEE P802.3bj Task Force reflector.

The ballot statistics are:

   245 Voters
    91 Approve
    15 Disapprove 
    29 Abstain
   135 Ballots returned

55.10% Response Rate (>= 50% required)
21.48% Abstain Rate (< 30% required)
85.85% Approval Rate (>= 75% required)

Thank you to all that participated in this ballot. 

David Law
Chair, IEEE 802.3 Ethernet Working Group

Adam Healey
Chair, IEEE P802.3bj 100 Gb/s Operation Over Backplanes and Copper Cables Task Force