|
Meeting Materials |
||
|
All Files |
||
| General Information | ||
|
Agenda and General Information |
John D'Ambrosia | Force10 Networks |
|
Overview of the Process |
Wael Diab | Broadcom |
|
Review of the 5 Criteria |
Howard Frazier | Broadcom |
|
Approved Minutes |
Dave Chalupsky | Intel |
| Liaisons and Communications | ||
|
Proposed Informal Communication to OIF 15-Jan 11 (19k) Update Per Study Group Discussion 15-Jan 11 (18k) |
Tom Palkert | Xilinx / Luxtera |
| Presentations | ||
|
Process and Problems |
John D'Ambrosia | Force10 Networks |
|
OIF CEI-25G-LR Overview |
Tom Palkert | Xilinx / Luxtera |
|
100GE for Telecom |
Bengt Kvist | Ericsson |
|
Feasibility Study for: IEEE 802.3
100GbE Electrical Backplane / Copper Cabling Study Group |
Vittal Balasubramanian | FCI |
|
IEEE 802.3 Electrical Backplane/Twinax Cu
Cable SG Objectives |
Chris DiMinico | MC Communications / Leoni Cables & Systems |
|
25Gb/s VSR Link Data |
Megha Shanbhag | Tyco Electonics |
|
Technical Feasibility of Twinax Copper Cable
for 4x25Gbps Data Transmission |
Mark Bugg Ebrahim Abunasrah |
Molex |
|
Suggested Practices for Reporting
Simulation Results |
Adam Healey | LSI |
|
Study of 100 Gb/s on 40GBASE-KR4
Channel |
Howard Frazier Vasu Parthasarathy |
Broadcom |
|
25Gbps Communication over10GBASE-KR Channels |
Will Bliss | Broadcom |
|
Technical Feasibility of Serial 25 Gb/s
Signaling over Backplanes: Channel and System Analysis |
Ziad Hatab Frank Chang |
Vitesse |
|
Elements for 100Gb/s FEC |
Sudeep Bhoja | Broadcom |
|
FEC Options for 100G-KR |
Zhongfeng Wang | Broadcom |
|
Materials Issues for Low Skew Close Phase Matching in 25Gbps
Differential System Designs |
Ed Sayre Sunichi Maeda Shinji Yoshikawa |
NESA KEI Systems, Inc. Asahi-Kasei E Materials |
Return to 100 Gb/s Backplane and Copper Cable
Study Group Public Area
Last Update: 17-May-11
|
|
|
|