100 Gb/s Backplane and Copper Cable Study Group

Plenary Meeting Material
Mar 15th-16th, 2011
Singapore

 

Meeting Materials

All Files
     26-June 11 (9.0M)

   
General Information    

Agenda and General Information
     12-Mar 11 (259k)

John D'Ambrosia Force10 Networks

Jan 11 Action Items and Attendance
     10-Mar 11 (169k)

Dave Chalupsky Intel

Approved Minutes
     26-Jun 11 (50k)

Dave Chalupsky Intel

IEEE 802.3 Opening Plenary Report
     12-Mar 11 (52k)

John D'Ambrosia Force10 Networks

IEEE 802.3 Closing Plenary Report
     17-Mar 11 (148k)

John D'Ambrosia Force10 Networks
Liaisons and Communications    

Liaison from OIF
     01-Feb 11 (58k)

OIF  
     
Presentations - General    

Objectives Discussion
     23-Feb 11 (65k)

John D'Ambrosia
Howard Frazier
Adam Healey
Force10 Networks
Broadcom
LSI

An Overview of Energy Efficient Ethernet
     17-Mar 11 (152k)

Mike Bennett Lawrence Berkeley National Laboratory

IEEE P802.3bf Data Delay
     17-Mar 11 (263k)

David Law
Marek Hajduczenia
Steve Carlson
HP
ZTE
High Speed Design

Bit Error Ratio Objective
     12-Mar 11 (180k)

Brad Booth  Applied Micro

Signaling Terminology: PAM-M and Partial Response Precoders
     10-Mar 11 (420k)

William Bliss Broadcom

Recommendations for common VNA Configurations for channel characterization 
     17-Mar 11 (74k)

Greg Lecheminant
Agilent

Recommendations for TDR Configurations for channel characterization 
     17-Mar 11 (518k)

Pavel Zivny Tektronix

Suggested Practices for Reporting Simulation Results (reprise) 
     10-Mar 11 (130k)

Adam Healey LSI

System Vendors View on 100 Gb/s Backplane and Copper Study Group Issues
     10-Mar 11 (31k)

Mark Gustlin
Hugh Barrass
Priooz Tooyserkani
Lin Shen
Marco Mazzini
John D'Ambrosia
Dan Dove
Ilango Ganga
David Chalupsky
Shimon Muller
Cisco




Force10 Networks
HP
Intel

Oracle

FEC Triple Tradeoffs & 100GCU SG Objectives 
     17-Mar 11 (130k)

Sudeep Bhoja
Mark Gustlin
Broadcom
Cisco

Broad Market Potential and Economic Feasibility of the 100Gb Backplane and Cu Cable Solutions for the Volume Blade & Rack Server Markets
     10-Mar 11 (317k)

Dave Chalupsky Intel

Consider SG Objective from IC Vendor Perspective
     12-Mar 11 (258k)

Frank Chang Vitesse
     
Presentations - Backplane    

Circuit Board Technology:  An Introduction to Fabrication Issues in High Speed Channels
     18-May 11 (537k)

Joel Goergen Cisco

A Method for Evaluating Channels
     10-Mar 11 (202k)

Charles Moore
Adam Healey
Avago
LSI

Evaluation of Channels Submitted to Study Group
     10-Mar 11 (167k) 

     Spreadsheet 12-Mar 11 (9k)

Charles Moore
Adam Healey
Avago
LSI

Comparing newer versus older backplanes
     10-Mar 11 (304k)

Vasu Parthasarathy
Howard Frazier
Broadcom

Channel Analysis for Defining Reach and BER Objectives
     10-Mar 11 (1.4M)

Ziad Hatab Vitesse

25Gb/s Signaling for 100G Backplanes: Channel Loss vs Equalization
     10-Mar 11 (308k)

John Ewen
Mounir Meghelli
Troy Beukema
IBM

25Gb/s Signaling for 100G Backplanes: Time Domain SI Analysis
     10-Mar 11 (1.6M)

Mounir Meghelli
John Ewen
Pravin Patel
Barry Barnett
Troy Beukema
IBM

100G Backplane Link Feasibility Study: Time Domain Simulations Using Frequency Domain Measurement Data
     10-Mar 11 (1.3M)

Peerouz Amleshi
Pravin Patel
Troy Beukema
Molex
IBM

100Gb/s Measured Backplane Channels  
     17-Mar 11 (108k)

Megha Shanbhag
Tyco Electronics

Alternative Backplane Architectures for 100Gb/s Applications
     17-Mar 11 (96k)

Nathan Tracy
Megha Shanbhag
Tyco Electronics

A Study of 10G-KR Channel Evolution and Its Signaling Implications at 25 Gbps
     10-Mar 11 (967k)

Mike Li
Altera
     
Presentations - Copper Cable    

Server Link Lengths for ToR Cabinet-to-Cabinet & EoR/Centralised Switching
     10-Mar 11 (116k)

Alan Flatman LAN Technologies

Viability of 3 Meter Cable Reach Based on 10Gb/s Market Snapshot
     17-Mar 11 (32k)

Nathan Tracy Tyco Electronics

Twin-Ax Capability for 4x25Gbps
     10-Mar 11 (347k)

Mark Bugg Molex

Connector Considerations
     10-Mar 11 (235k)

Scott Sommers
Molex

Considerations for Determining Objectives
     10-Mar 11 (69k)

Chris DiMinico
MC Communications
LEONI Cables & Systems

 


Return to 100 Gb/s Backplane and Copper Cable Study Group Public Area
Last Update: 26-June-11


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]