| Meeting Materials | |||
| All Files |
04-Apr-12 (6.9M) |
||
| General Information | |||
| Agenda and General
Information |
20-May-11 (269k) | John D'Ambrosia | Force10 Networks |
|
Approved Minutes |
04-Apr-12 (272k) |
Dave Chalupsky | Intel |
| Presentations - General | |||
|
Proposed
Responses to PAR Questions Updated per SG Discussion |
12-Apr-11 (36k) 06-June-11 (36k) |
Howard Frazier Mark Nowell John D'Ambrosia Dave Chalupsky Ilango Ganga Adam Healey Shimon Muller |
Broadcom Cisco Force10 Networks Intel Intel LSI Oracle |
|
Proposed Responses:100Gb/s backplane and copper cable 5 criteria Updated per SG Discussion |
12-Apr-11 (210k) 06-June-11 (85k) |
Howard Frazier Mark Nowell John D'Ambrosia Dave Chalupsky Ilango Ganga Adam Healey Shimon Muller |
Broadcom Cisco Force10 Networks Intel Intel LSI Oracle |
|
System Vendors View on 100 Gb/s Backplane and Copper Study Group Issues |
19-May-11 (131k) | Mark Gustlin Hugh Barrass Priooz Tooyserkani Lin Shen Marco Mazzini John D'Ambrosia Dan Dove Ilango Ganga David Chalupsky Shimon Muller |
Cisco Force10 Networks HP Intel Oracle |
|
FEC Striping Options |
20-May-11 (273k) | Mark Gustlin | Cisco |
|
Evaluation of Various Channels Summary in CSV |
06-June-11 (82k, 8k) | Charles Moore | Avago |
| PAR Response Form | 06-June-11 (179k) | David Law | HP |
| Presentations - Backplane | |||
|
FR-4 Circuit Board Technology: An Introduction to Fabrication Issues in
High Speed Channels |
9-July-11 (1.35M) |
Joel Goergen | Cisco |
|
IEEE802.3ap FR-4 Materials Review: Past Review
and Future Recommendations |
9-July-11 (665k) |
Joel Goergen | Cisco |
|
SNR Budget Analysis for 25 Gb/s over
Backplane Channels |
19-May-11 (564k) |
Ziad Hatab | Vitesse |
| Rough channel targets for 4 x 25 Gb/s operation on existing backplanes | 19-May-11 (328k) | Vasu Parthasarathy Rich Mellitz |
Broadcom Intel |
| 25Gb/s 100GbE Backplane Links | 24-May-11 (570k) |
Mounir Meghelli Troy Beukema John Ewen Pravin Patel |
IBM |
| Feasibility of 100G-KR FEC | 19-May-11 (184k) | Zhongfeng Wang Chung-Jue Chen |
Broadcom |
| Time-domain SNR analysis on contributed channels | 17-June-11 (305k) |
Adee Ran | Intel |
| Feasibility of 100 Gb/s Operation on Installed Backplane Channels | 09-July-11 (663k) | Howard Frazier Vasu Parthasarathy John Wang |
Broadcom |
| A Study
of 25 Gbps Signaling Over Complied 10G-KR Channels |
06-June-11 (630k) |
Mike Li | Altera |
| Presentations - Copper Cable | |||
| Objectives | 19-May-11 (239k) | Chris DiMinico | MC Communications LEONI Cables |
|
100Gbps Copper Cable Assemblies |
19-May-11 (417) |
Mark Bugg | Molex |
| 100GbE Front Panel Ports Based on 4 Lanes | 06-June-11 (734k) | Ali Ghiasi | Broadcom |
Return to 100 Gb/s Backplane and Copper Cable
Study Group Public Area
Last Update: 4-Apr-12
Questions or comments: send e-mail to Webmaster
|
|
|
|