May 09, 2018 Teleconference |
||
Agenda | Beth Kochuparambil | Cisco |
Unapproved Minutes | Beth Kochuparambil | Cisco |
PCS, FEC, and PMA Sublayer Baseline Proposal | Mark Gustlin Gary Nicholl Dave Ofelt Jeff Slavick |
Xilinx Cisco Juniper Broadcom |
C2M AUI Options | Ali Ghiasi | Ghiasi Quantum |
Short Host Channel System Implications | Rob Stone | Broadcom |
Chiplet Package Study | Brian Holden | Kandou Bus |
Feb 26, 2018 Teleconference |
||
Agenda | Beth Kochuparambil | Cisco |
Minutes | Kent Lusted | Intel |
Channel Model Simulations for 112Gbps Backplane Applications | Geoff Zhang | Xilinx |
FEC Schemes for 100G Electrical Link | Phil Sun | Credo |
Using Chiplets to Lower Package Loss | Brian Holden | Kandou |
100GEL C2M Channel Estimate & Impact on the TBD in the Objectives |
Jane Lim Pirooz Tooyserkani Upen Reddy Kareti |
Cisco |
2m Passive Copper Cable Feasibility at 112G |
Chris Roth Alex Haser |
Molex |
Feb 12, 2018 Teleconference |
||
Agenda | Beth Kochuparambil | Cisco |
Minutes | Kent Lusted | Intel |
Loop-Timed Configurations | Ramin Farjadrad | Aquantia |
Synthesized CR End to End Models | Rich Mellitz | Samtec |
Jan 08, 2018 Teleconference |
||
Agenda | Beth Kochuparambil | Cisco |
Minutes | Kent Lusted | Intel |
Thoughts on 100G AUI Objective | Gary Nicholl | Cisco |
Proposed CSD Responses | Kent Lusted | Intel |
Jan 03, 2018 Teleconference |
||
Agenda | Beth Kochuparambil | Cisco |
Minutes | Kent Lusted | Intel |
Initial Backplane Channels | Rich Mellitz | Semtech |
Study Group Status and Work | Beth Kochuparambil | Cisco |
Dec 20, 2017 Teleconference |
||
Agenda | Kent Lusted | Intel |
Minutes | Kent Lusted | Intel |
Study Group Status and Work | Beth Kochuparambil | Cisco |
100Gb/s Electrical Links: System View |
David Ofelt Mark Gustlin Kent Lusted Gary Nicholl Rob Stone Beth Kochuparambil |
Juniper Xilinx Intel Cisco Broadcom Cicso |
Dec 13, 2017 Consensus Building |
||
Study Group Status and Work - initial draft | Beth Kochuparambil | Cisco |