Dear Participants, For those who may not have been able to attend our meeting this week, it was a very successful week. We now have 100 Gb/s optical objectives! We are also set to adopt a 40G ER objective pending EC approval of our SG name being changed. Thanks go out to all of the participants in our meeting. From the many presentations, to the polite and professional discussion, we were able to achieve a significant set of results. Included are those who have contributed, but could not attend this week. We still have a lot of work to do, but we are on track to submit a PAR in July. Best Regards (and aloha!) Dan (from our unapproved minutes) Motion
# 1 Request 802.3 extend our Study Group for an
additional
period of 6 months Moved: Dan Dove Second: Kapil Shrikhande Y: 74 N: 0 A: 0 Motion
# 2 Pending approval by 802.3 and the EC to
modify the scope
of our SG to include 40G, adopt the following objective: •
Define a 40 Gb/s PHY for
operation over at least
40 km of SMF Moved: Pete Anslow
Second: Jon Anderson Y: 63 N: 0 A:14 Motion
# 3 Adopt the following objective: •
Define a 100 Gb/s PHY for
operation up to at
least 500 m of SMF Moved: Steve Trowbridge Second: Peter Stassar Y: 69 N: 0 A: 2 Motion
#4 Adopt the following objectives: •
Define a 100 Gb/s PHY for
operation up to at
least 100 m of MMF •
Define a 100 Gb/s PHY for
operation up to at
least 20 m of MMF
Second: Steve Swanson Y: 69 N: 2 A: 6 |