Technical feasibility: survey
I would like to
take a quick survey of the experts:
1) Do you believe that
10 Gigabit Ethernet over 100m on Cat7 is
not technically feasible?
2) Do you believe that
the power required for 10 Gigabit Ethernet over 100m on Cat7 make it
not technically feasible?
3) If you said "yes"
to 1) or 2), then what do you believe needs to be done to satisfy
technical feasibility for the 10GBASE-T Study Group?
Thank you,
Brad
Chair, 10GBASE-T
Study Group