Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

RE: [10GBASE-T] Technical feasibility: survey



Title: Technical feasibility: survey
Hi Brad,
1. No
2. No.
Two comments regarding power:
* I think that power rating will be higher than 5W figure I've seen mentioned 
* the WG will need to further investigate this issue
 
Regards,
Ze'ev
 
*******************************
Dr. Ze'ev Roth
Mysticom
Direct: +972 9 8636499
Fax   : +972 9 8636466
*******************************
-----Original Message-----
From: Booth, Bradley [mailto:bradley.booth@intel.com]
Sent: Tuesday, August 05, 2003 7:19 PM
To: stds-802-3-10gbt@ieee.org
Subject: [10GBASE-T] Technical feasibility: survey

I would like to take a quick survey of the experts:
1) Do you believe that 10 Gigabit Ethernet over 100m on Cat7 is not technically feasible?
2) Do you believe that the power required for 10 Gigabit Ethernet over 100m on Cat7 make it not technically feasible?
3) If you said "yes" to 1) or 2), then what do you believe needs to be done to satisfy technical feasibility for the 10GBASE-T Study Group?

Thank you,
Brad

Chair, 10GBASE-T Study Group