[10GMMF] Agenda TP3 Meeting Tuesday 7th September



Hi Folks,

Here is the Agenda for Tuesday's Meeting

I am travelling, so Piers has kindly agreed to step in and manage the agenda.

Best Regards

Mike


Dial in Details
===============
Meeting Time: Tuesday Sept 7th. 9am CA, 12 NY, 5pm UK, 6pm Germany

International Direct Dial (650) 599-0374
Meeting ID:                     801803


Agenda
======
1. Attendee list
2. Review Notes from Last Meeting (Aug 31)
3. Update on Experimental Results Regarding Non-Idealities in E-O-E (Abhijit)
4. Discussion on Parameter Fitting for the ISI Generator (Petre)
        Petre's on-going work is to do the following:-
        o show PIE-L for the Cambridge vs the approximated channels (validate that the channel metric is not significanlty altered)
        o present thinking on how many impulses are requiered and which should be used for testing
                - early thinking from Petre is suggesting that 3 different responses make sense:-
                        a. quasi symmetric
                        b. post-cursor
                        c. pre-cursor
        o present thinking on the relative merits of BT filters, 2 and 3 peak impulse response models

5. Review work list of addtional items
Review progress on the the following stressors:-
        a. Fiber loss/dispersion
        b. Connector loss/dispersion
        c. Time varying factors
        d. Modal Noise
        e. RIN
        f. Jitter
        g. Optical signal conditioning

a., b. and c. could potentially be covered through a combination of the adhoc and Petre's work - is this true?

For d. and e. Lew is going to talk with Infineon folks regarding some analysis on noise powers to represent modal noise and RIN. Abhijit is going to do some thinking on an EDC chips performance with respect to different noise sources and their nature. In particular is it acceptable to emulate the noise source with a single sinusoid?

For f. Ali Ghiasi and Tom Lindsay are both going to review Lew's proposal of testing with jitter applied at a single frequency and propose if this should be changed and what frequencies should be tested.

No discussion on g.

6. Discuss goals for what we can achieve by the September Interim meeting.