Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [10GMMF] Meeting notes for Sept 15th - Task-2 time variation and modal noise



Dear Task 2-ers
Tomorrows meeting (wednesday 22 September), will be at 9.30am , (to
accommodate those who attend the OIF meeting)
Call numbers are
877 256 9057 usa
706 643 2673 int'l
conf ID 361125

Agenda will be
attendees
agree minutes of last meeting

Main topic will be on finalizing slides summarizing task 2 progress, for
presentation at the September meeting in Ottawa, as a part of the
channel ad hoc update on its activities.
I'm looking for suggestions and comments on what should be included;

I've drafted a slide set  ( task2_update_draft4Sept04) which can be
found on the ftp site and hopefully will be available on the ieee upload
site in time for the meeting; it includes slides describing the basis of
time variation experiments
        the standard link agreed upon for experiments and modelling
        summary of vibration tests based on GR-63-core
Petre has volunteered a summary of the study of temperature effects,

Please be prepared to discuss our input to the interim meeting
if you can't make the telecon, e-mail me with any inputs, comments,
suggestions, all will be gratefully received !  I don't have a strong
feeling for the task 2 group's consensus, and need guidance of what
should be presented, format etc.....

best wishes

 Jonathan

tel: 1 408 524 5110
e-mail: jking@bigbearnetworks.com
fax: 1 408 739 0568

Jonathan King
Director, Optical Systems
BigBear Networks
345 Potrero Avenue
Sunnyvale, CA 94085


-----Original Message-----
From: Jonathan King
Sent: Monday, September 20, 2004 7:12 PM
To: 'IEEE P802.3aq 10GBASE-LRM'
Subject: [10GMMF] Meeting notes for Sept 15th - Task-2 time variation
and modal noise

Task 2-ers

Here is a summary of the task 2 meeting on sept 15th

please let me have any comments or feedback on omissions or errors

Next meeting will be 22 Spetember at 9.30am , (to accommodate those who
attend the OIF meeting)
Call numbers will be
877 256 9057 usa
706 643 2673 int'l
conf ID 361125


Main topic of discussion will be on slides summarizing task 2 progress
for presentation at the September meeting in Ottawa
I'm looking for  suggestions and comments on what should be included;
We could include slides describing the basis of time variation
experiments
        the standard link agreed upon for experiments and modelling
        summary of vibration tests based on GR-63-core and intended
experiments
        summary of other activities planned/on going - study of
temperature     effects, modal noise calculations ?
Please e-mail me with any inputs, comments, suggestions, all will be
gratefully received !

best wishes

 Jonathan

tel: 1 408 524 5110
e-mail: jking@bigbearnetworks.com
fax: 1 408 739 0568

Jonathan King
Director, Optical Systems
BigBear Networks
345 Potrero Avenue
Sunnyvale, CA 94085