Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [10GMMF] Task 2 Slides for Dec 1st call , 9.30am (joint task 2 and task 4 meeting



In regard to Slide 1, Bullet 1, item 3,
the polarization measurement and bounds on its effect, and the estimate of time dependent effects and the bound on their effect, could we briefly review what the consensus understanding and working assumption is?

Is the bound which the group is going to use that the local MPD can vary at no more than a 10Hz rate between "states", and that the two states will have identical mode group delays but differing mode power distributions (MPDs)?

What is the suggested "bound" on the MPD variation?  Is it something like in going from state 1 to state 2, any shift in MPD can occur, with the practical limitation that power does not appear in "state 2" in mode groups which had "zero" power in state 1?
                Hence pre-cursors can change to post-cursors or center peaks, but if state 1 shows only 4 mode groups
                with "appreciable" power then state 2 will show only those 4 groups?

If  a fiber is moving from a precursor to a post cursor at 10Hz rate, then it seems like it would hit the symmetric state on a 20Hz cycle, just as cos^2 theta  corresponds to twice the frequency as cos theta (?)


John Abbott
Advanced Modeling & Analysis
Corning Incorporated SP-PR-1-3
Corning NY 14831
abbottjs@corning.com


-----Original Message-----
From: Jonathan King [mailto:jking@BIGBEARNETWORKS.COM]
Sent: Tuesday, November 30, 2004 10:25 PM
To: STDS-802-3-10GMMF@listserv.ieee.org
Subject: Re: [10GMMF] Task 2 Slides for Dec 1st call , 9.30am (joint task 2 and task 4 meeting


Dear Task 2 and 4 people

here are introductory slides for wednesdays call (Dec 1st)9.30am PCT best wishes  Jonathan

tel: 1 408 524 5110
e-mail: jking@bigbearnetworks.com
fax: 1 408 739 0568

Jonathan King
Director, Optical Systems
BigBear Networks
345 Potrero Avenue
Sunnyvale, CA 94085