Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
I agree with Jesper, the proposals for the ISI compliance stress
test define a channel, comprising 300m OM1 with 2 connectors. The availability of a common simulation database (power coefficients with connector mode coupling matrix) would be very useful, based on either Cambridge108 or MonteCarlo. Regards, Albrecht Rommel Acuid Corporation Ltd. Phone +49 (0)8141 3555 813 Fax +49 (0)8141 3555 829 Mobile +49 (0)172 607 8039 albrecht.rommel@acuid.com www.acuid.com Hanberg, Jesper wrote:
|