[10GMMF] Report of resolution of P802.3aq D2.1 comment 1151 (OMA extraction into TWDP code)



Piers Dawe submitted code that would automate measurement of OMA in TWDP.  A subcommittee consisting of Jim McVey, Petar Pepeljugoski, Norm Swenson, Tom Lindsay, Jan Peeters Weem, and Sudeep Bhoja was charged with reviewing the code and deciding whether it should be included in D2.2.  The subcommittee was chaired by Tom Lindsay.  At the discretion of the chair, Piers Dawe was added to the subcommittee. 

 

The subcommittee met three times and made its decision on schedule.  By a vote of 3 “do not include” and 2 “include”, the subcommittee decided not to include the code in D2.2.  Jan and Sudeep were not available for the study.

 

The subcommittee evaluated the proposed method against two independently developed methods, using the waveforms on the LRM website and additional waveforms with known OMAs that were simulated and experimentally measured during the study.  All three methods work over the variety of waveforms.  However, the peak-peak spread in OMA values among the methods was 0.7 dB across the waveforms. The average value of the spread was 0.27 dB with a standard deviation of 0.175 dB. No method consistently was highest or lowest.

 

Greater than 25% of the subcommittee was concerned that the variation was too large and that further study, testing, and development are required before making changes to the document.

 

Other considerations:

·         There was a range of views on how to best implement OMA-automation into the document. Since OMA-automation is independent of the core of TWDP, choices considered include making the code informative or normative, and whether to include it within the body of TWDP or as a separate routine, or possibly in an annex.

·         As presented in San Francisco, other improvements in addition to power automation are being considered for TWDP. These include alternative power normalization, finite EQ length, and adjustments to the pass/fail limits. These potential improvements are all inter-related. It may be premature to make changes until all work is wrung out and coordinated. Per the TP2 summary presentation and discussion in San Francisco, the committee understands that improvements are being considered and can come in by the September meeting and still be accepted if sufficiently tested and endorsed.

 

A summary presentation of this work is planned.  To progress OMA automation, the subcommittee will make the three OMA extraction methods available on the web site for folks to test and evaluate.  Members of P802.3aq should continue to investigate improvements to TWDP. This must be done in a timely fashion.

 

Tom Lindsay

ClariPhy Communications
tom.lindsay@clariphy.com
phone: (425) 608-0209 or (949) 480-9210
cell: (206) 790-3240
fax: (425) 608-0232