Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Copper Ad Hoc Conference Call Meeting Minutes- Friday (June 25th)



Copper Ad Hoc Conference Call Meeting Minutes- Friday (June 25th)

 Presentations were reviewed in support of straw proposal objectives.

 Straw objectives:

  1. The copper ad hoc membership (those who raised their hands in Idaho) support the following objectives for higher speed copper.

Presentations Reviewed:

Drew A. Plant (HP) - Equipment Room Copper Cable Proposal

Rick Walker (HP) - 10GbE over Coaxial cable

Bill Woodruff (GiGA North America)- Equalizers for 2.5Gb/s over copper

Rich Taborek (Transcendata)- 10 GbE CX - Short Haul Copper

John kincaid (Belden) - Discussion material on category 6 (installed base,channel capacity)

Current Status:

Ad hoc supports a copper solution with a minimum length of 10 meters.

Copper Ad Hoc Supports HSSG Motion-

to adopt an objective to provide a Physical Layer specifications which supports

 a link distance of at least 10m on copper cable

----------------------------------------------------------------------------------------------------------------------- 

Chris Di Minico
CDT Corporation
Phone: 1-800-422-9961
   Fax:   1-978-537-4358
e-mail: cd@xxxxxxxxxxxxxx