Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
Dear Study Group Participants, Meeting materials have been uploaded for next week’s meeting in York, UK. You may find the meeting material at http://www.ieee802.org/3/400GSG/public/13_09/index.shtml. Please note two things – 1. We received a limited number of presentations (4) addressing objectives. While I understand the interest in the “fun” stuff of tackling the engineering problem, I need to remind everyone that at this time – there is no 400 Gb/s Ethernet project. We have not completed our objectives, gotten a PAR approved, or even written draft responses to the 5 Criteria. 2. To that end, between now and the meeting, I intend to review relevant material and provide a summary to the group regarding reach statements made. This will be used as a topic for discussion and potential identification of additional material needed. This paper will not include content and will merely summarize what has been presented to date. I wish everyone safe travels on their way to York, UK. Best Regards, John D’Ambrosia Chair, IEEE 802.3 400 Gb/s Ethernet Study Group |