Thread Links Date Links
Thread Prev Thread Next Thread Index Date Prev Date Next Date Index

Re: [STDS-802-3-400G] Sept Interim Meeting Material Posted



Today in TF, during Q&A after cole_3bs_02a_0914, several requests were made to see the TX and RX analog BW assumptions behind TDP (pages 5 and 6) and RX BW Penalty (page 8).

 

The general answer is that RX analog BW is 75% of the Baud rate. Below is a table with the specifics for 10km TDP and RX BW Penalty.

 

Please let us know if we can provide additional clarifications.

 

Chris

 

10km

8x50G

NRZ

8x50G

PAM4

8x50G

PAM4

4x100G

PAM4

4x100G

DMT-k

Source

Mod

Mod

DML

Mod

25G DML

Grid

LAN WDM

LAN WDM

LAN WDM

LAN WDM

LAN WDM

FEC

BCH

BCH

BCH

BCH

BCH

Operating BER

1.0E-03

1.0E-03

1.0E-03

1.0E-03

1.0E-03

Symbol (or Sample) Rate  Gbaud (or GS)

55.9

28.0

28.0

55.9

55.9

TDP TX BW

GHz

21

21

21

21

21

TDP RX BW

GHz

42

21

21

42

21

RX BW Penalty BW

(w/ FEC OH) GHz

42

21

21

32

19

 

 

From: John D'Ambrosia [mailto:John_DAmbrosia@xxxxxxxx]
Sent: Thursday, September 04, 2014 12:26 PM
To: STDS-802-3-400G@xxxxxxxxxxxxxxxxx
Subject: [STDS-802-3-400G] Sept Interim Meeting Material Posted

 

Dear Task Force Participants,

The material for the Sept 2014 Interim meeting has been posted, and may be found at:

http://www.ieee802.org/3/bs/public/14_09/index.shtml

 

Please note that the meeting agenda may be found at: http://www.ieee802.org/3/bs/public/14_09/agenda_3bs_01_0914.pdf

 

I wish everyone safe travels and will see everyone on Monday morning @ 9am.

 

Regards,

 

John D’Ambrosia

Chair, IEEE P802.3bs 400GbE Task Force