| Thread Links | Date Links | ||||
|---|---|---|---|---|---|
| Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index | 
| 
 Hi Pete, from meeting minutes : “A chart showing this result was shown and this was added to an updated version (anslow_01a_0216_smf) of the presentation posted after the close of the meeting.
 As there are only four high reflection connectors in the double link scenario in kolesar_3bs_01_0514, Pete said he would re-run the spreadsheet with four -35 dB connectors and four -55 dB connectors.” For parallel XCVR like DR4 (http://www.ieee802.org/3/bs/public/14_05/kolesar_3bs_01_0514.pdf, slide 6 and 7), the double
 link has just 4 MPO, while 4MPO + 4LC is applicable to 2-fiber XCVR (duplex). So if this is still valid, the spreadsheet should be run with four connectors only for DR4 and eight connectors for FR8/LR8. Regards Marco From: Anslow, Peter
 [mailto:panslow@xxxxxxxxx]  Hi, The draft minutes from yesterday’s SMF Ad Hoc call are on the P802.3bs SMF Ad Hoc
web page, together with a revised version of the presentation. As discussed on the call, the next SMF Ad Hoc call is scheduled for Tuesday 16 February
from 9:00 to 11:00 PST (meeting details attached).  If you are interested in presenting, please request a timeslot by Noon PST on
Monday 15 February. Peter Anslow from Ciena has invited you to join a meeting on the Web, using WebEx. Please join the meeting 5-10 minutes early so we may begin on time.
 +44-203-4333547  (United Kingdom)
 4438636577  (United States) 2064450056  (Canada) 4006920013  (China)
 Regards, Pete Anslow |
Senior Standards Advisor  |