Thread Links | Date Links | ||||
---|---|---|---|---|---|
Thread Prev | Thread Next | Thread Index | Date Prev | Date Next | Date Index |
At today’s P802.3bs Electrical Ad-Hoc meeting I announced we would have a straw poll on options for the C2M Insertion Loss equation based on discussion following the
presentation of mellitz_01b_042417_elect.
·
Option 1: Do nothing
·
Option 2:
–
Change “The
supported insertion loss budget is characterized by Equation (120E–1) and illustrated in Figure 120E–4. “ to “The
recommended insertion loss budget is characterized by Equation (120E–1) and illustrated in Figure 120E–4. “
–
Add “recommended” to the title of Figure 120E-4.
·
Option 3: Change the insertion loss equation to the equation given in Slide 14 “Option B” of mellitz_01b_042417_elect.
·
Option 4: Implement the changes in both options 2 & 3 above.
Please send me an email specifying your preferred option (select only one).
-
Don’t get hung up on exact values. This is a straw poll, nothing is definitive – we just want to establish a direction for the group.
Regards Andre Szczepanek (Electrical Ad Hoc chair) |