IEEE 802 P802

IEEE 802.3 400 Gb/s Ethernet Study Group


 Interim Meeting Material
Jan 20 - 21, 2014
Indian Wells, CA, USA

Meeting Materials

All Files
    25-Jan-14 (12.4M)

General Information

Agenda and General Information
    16-Jan-14 (344k)
John D'Ambrosia Dell
Technical Feasibility Ad Hoc Update
     23-Jan-14 (47k)
Steve Trowbridge Alcatel-Lucent
Economic Feasibility Ad Hoc Update
    20-Jan-14 (79k)
     Update - given during closing business
     23-Jan-14 (553k)
Andy Moorwood Infinera
Applications Ad Hoc Update
     16-Jan-14 (25k)
John D'Ambrosia Dell
Contributions Review
     16-Jan-14 (95k)
John D'Ambrosia Dell
Summary of Proposed Responses to CSD
     16-Jan-14 (69k)
     Modified per Study Group Discussion
     25-Jan-14 (71k)
John D'Ambrosia Dell
Updated Proposed PAR
     26-Jan-14 (7k)
John D'Ambrosia Dell
Unapproved Meeting Minutes
     26-Jan-14 (159k)
Ghani Abbas
Ericcson

Liaisons & Communications

Approved Response to ISO/IEC JTC 1/SC 25
     23-Jan-14 (67k)
Alan Flatman Independent

Meeting Presentations

Broad Market Potential - Proposed Responses
     16-Jan-14 (222k)
John D'Ambrosia
Pete Anslow
Dell
Ciena
Passive Copper Cable Objective for 400 GbE
     16-Jan-14 (1.6M)
     Update Shown During Closing Business
     26-Jan-14 (1.6M)
Tom Palkert
Nathan Tracy
Molex
TE Connectivity
Need for 400GbE Breakout
     16-Jan-14 (1.6M)
Tom Palkert Molex
Economic Feasibility of 400G Ethernet
     25-Jan-14 (395k)
Mike Peng Li
Gregg Baeckler
Martin Langhammer
Divya Vijayaraghavan
Paul Scheidt
Curt Wortman
Altera
Economic Feasibility of 400G Ethernet MAC/PCS/FEC
     23-Jan-14 (352k)
Mark Gustlin Xilinx
Maximizing the cost advantage of Ethernet by considering future generations of 400GE
     16-Jan-14 (273k)
Yoshiaki Sone NTT
Economic Feasibility of Multi-fiber Lane Connectors
     16-Jan-14 (1.5M)
Tom Palkert Molex
Economic Feasibility of Multi-fiber PMDs
     16-Jan-14 (146k)
Tom Palkert Luxtera
Technical Feasibility of Bit multiplexing in 400GbE PMA
     23-Jan-14 (632k)
Xinyuan Wang
Tongtong Wang
Wenbin Yang
Huawei
Considering 2 km and 10 km Architectural Alternatives
     20-Jan-14 (1.0M)
Dan Dove
Xiaolu Song
Huawei
Feasibility for 10km SMF PMD
     20-Jan-14 (753k)
Xu Yu
Liang Xie
Zhenwei Cui
Huawei
400Gb/s SMF PMD Technical Feasibility
     16-Jan-14 (139k)
Chris Cole
Finisar
Evolution of 400 GbE PMD and Signaling
     23-Jan-14 (179k)
Ali Ghiasi Ghiasi Quantum LLC
Opportunities for PAM-4 Modulation
     16-Jan-14 (701k)
Xiaolu Song
Dan Dove
Huawei
Technical feasibility of DMT for 400GbE SMF transmission
     16-Jan-14 (903k)
Tomoo Takahara
Toshiki Tanaka
Masato Nishihara
Jens C. Rasmussen
Fujitsu
4x100GE through 2 and 10km SMF Using DMT and 1.3um LAN-WDM EMLs
     20-Jan-14 (712k)
Winston Way
Trevor Chan
Newphotonics
Technical feasibility of CMOS DMT transceiver for 400GbE SMF transmission
     20-Jan-14 (283k)
Ian Dedic
Patricia Bower
Paul Little
Fujitsu
Proposal of new 400GbE Signaling Formats with 4λ x 100G Configuration
     16-Jan-14 (470k)
Riu Hirai
Hidehiro Toyoda
Nobuhiko Kikuchi
Hitachi
Optical Module Power Estimates for 400GbE
     16-Jan-14 (644k)
Scott Kipp Brocade
Technical Feasibility of 400G Copper Interconnects
     23-Jan-14 (1.1M)
Mark Bugg Molex
56Gbps/ch Connector Capability on CFP2 Connector 
     16-Jan-14 (869k)
Takeshi Nishimura
Toshitaka Kuroda
Hiroaki Kukita
Toshiyasu Ito
Yamaichi Electronics
     
 Return to 100 Gb/s Backplane and

Return to IEEE 802.3 400 Gb/s Ethernet Study Group Public Area

This page is maintained by

Privacy & Opting Out of Cookies


[Search] [e-mail] [Standards Home Page] [Corporate Home Page]

Last Update: 26-Jan-2014