IEEE 50 Gb/s & NGOATH Ethernet Study Group

Meeting Materials for:

Interim Meeting
Jan 20-22, 2016
Atlanta, Ga


Last Update: 29-Mar-2016

All Files
Download all meeting materials here: Updated 15-Jan-2016

Title Updated Author(s) Affiliation
General Information
Agenda  updated 19-Jan-2016 Mark Nowell
Cisco
50 Gb/s & NGOATH Study Group Ad-hoc report 15-Jan-2016 Kent Lusted
Intel
Procedural Progress   updated 19-Jan-2016
Mark Nowell
Cisco
Minutes approved 29-Mar-2016
Kent Lusted
Intel
Contributed Presentations
OTN Support for 50GbE, next generation 100GbE, 200GbE
15-Jan-2016 Steve Trowbridge
Alcatel-Lucent
Switch Designs for 50GbE and 200GbE
15-Jan-2016 Scott Kipp
Brocade

Architecture Options and Technical Feasibility of 50GbE
15-Jan-2016 Mark Gustlin
Gary Nicholl
David Ofelt
Xilinx
Cisco
Juniper
50G, 100G and 200G Server Connectivity updated 20-Jan-2016 Brad Booth
Microsoft
Thoughts on 50Gb/s ASIC IO and  backwards compatibility  considerations for 50G, 100G and 200G updated 20-Jan-2016 Gary Nicholl
Cisco
Compatibility Considerations for 50 and 100G updated 20-Jan-2016 Rob Stone
Broadcom
Breakout applications and impacts on objectives for 50/200G Ethernet
15-Jan-2016 Tom Palkert
Luxtera, Molex
50 and 200 GbE architecture and PMD requirements
15-Jan-2016 Ali Ghiasi
Ghiasi Quantum
Architecture options and Technical feasibility of 200GbE

15-Jan-2016 Mark Gustlin
Gary Nicholl
David Ofelt
Xilinx
Cisco
Juniper
The Case for 100G Over Two Lanes updated 20-Jan-2016 Rob Stone
Broadcom
Technical Feasibility of MAC and PCS layer
15-Jan-2016 Xinyuan Wang
Tongtong Wang
Huawei
Huawei
Technical Feasibility of SMF PMDs with RS FEC
15-Jan-2016 Xu (Helen) Yu
Xinyuan Wang
Huawei
Huawei
Wideband MMF for single pair 200GE updated 20-Jan-2016 Paul Kolesar
Commscope
50G over MMF objectives
15-Jan-2016 Jonathan King
Finisar
50Gb/s and 200Gb/s SMF PMD Specifications and Objectives Proposal
15-Jan-2016 Chris Cole
Finisar
100Gb/s SMF PMD Specifications and Objectives Proposal updated 20-Jan-2016 Chris Cole
Finisar
Electrical PMD Objectives
19-Jan-2016 Matt Brown
APM
Sample Copper Cable Data for 50 Gb/s Ethernet updated 19-Jan-2016 Chris Roth
Molex
No-FEC link for 50GE updated 20-Jan-2016 Phil Sun
Jeff Twombly
Haoli Qian
Credo
Credo
Credo
Bringing 200GE SMF objectives into 802.3bs
15-Jan-2016 Peter Stassar
Huawei
200 GbE Architecture Development  updated
27-Jan-2016 John D'Ambrosia Futurewei




Foundational Objectives
15-Jan-2016
Kent Lusted
Mark Nowell
Intel
Cisco
Strawman: Proposed Changes to 802.3bs Project Documentation
 updated
18-Jan-2016
John D'Ambrosia Futurewei
Proposed Responses: Criteria for Standards Development (CSD) updated 21-Jan-2016 Kent Lusted
Intel
Draft PAR document updated 21-Jan-2016 Mark Nowell
Cisco




Updated Documents During SG meeting
Straw Poll results from Wednesday
20-Jan-16
Mark Nowell
Kent Lusted
Cisco
Intel
Final PAR Modification to P802.3bs
22-Jan-16
Mark Nowell
Cisco
Final PAR - 50G/NGOATH
22-Jan-16
Mark Nowell
Cisco
Late Request